Second-Life Atlas: Southern, Eastern, West and Central Africa
Where solar panels and batteries in the pipelines of 49 African countries will retire, when, and in what volume: the 12 Southern African Power Pool members, Eastern Africa (the five EAPP core countries, the Horn of Africa from Sudan to Somalia, and the Indian Ocean islands of Madagascar, Comoros, Mauritius and Seychelles), and 23 countries in West and Central Africa. The aim is to find second-life and recycling opportunities before the waste exists.
Grows where the waste piles up.
2035
Expected retirements by year
Utility battery modulesHome and minigrid batteriesUtility PV, end of lifeUtility PV, early failures and repoweringRooftop PV and off-grid kitsGiga / H2 PVEV battery packs
What the Mission 300 compacts add
Nine SAPP members have published a Mission 300 national energy compact with targets for standalone solar and mini-grids to 2030. Once those systems are in use, their batteries and panels reach end of life every year. This is a separate, forward-looking estimate: it is not added to the retirements above, which start from systems already installed or in the pipeline.
Country
Compact
Standalone systems
Mini-grid connections
Waste once in use (t/yr)
Atlas, 2035 (t)
Angola
No compact published
11
Botswana
Sep 2025
61 thousand off-grid
not split
5 to 240
3
DR Congo
Jan 2025
25 thousand
6.4 million
790 to 25,000
370
Eswatini
No compact published
0
Lesotho
Sep 2025
not computable
not computable
9
Malawi
Jan 2025
1.4 million
100 thousand
140 to 2,800
42
Mozambique
Sep 2025
1.4 million off-grid
not split
120 to 5,500
1,600
Namibia
Dec 2025
35 thousand off-grid
not split
3 to 140
17
South Africa
No compact published
75
Tanzania
Jan 2025
2.5 million off-grid
not split
210 to 9,700
300
Zambia
Jan 2025
1.4 million
328 thousand
160 to 3,700
240
Zimbabwe
Oct 2025
1.2 million
16 thousand
100 to 2,000
63
Estimate by Aloe Energy, from the compacts' own split of new access, one system or connection per household (UN DESA household sizes) and published battery and panel sizes, weights and lifetimes. The low end assumes small lithium batteries (about 60 Wh) lasting 10 years; the high end assumes larger batteries (about 290 Wh), 5-year lives and lead-acid storage in mini-grids. Sources: ESMAP Energy Storage for Mini Grids (2023), GIZ (2018), IRENA and IEA-PVPS (2016), Narayan et al. (2019). Standalone and mini-grid columns are what each compact plans to 2030; "not split" means the compact gives one off-grid figure. The last column is this atlas's own estimate for off-grid kits and mini-grids already installed that retire in 2035 (regular loss), for scale. Lesotho's compact gives only a yearly pace, so no estimate. Full comparison of all 35 compacts: the Compacts tab of the grid-edge atlas.
EV batteries and second-life demand
2- and 3-wheelersPassenger carsMinibus taxis and fleetsBusesSecond-life demand: SHS + C&I + LDES
Year
EV packs retired (MWh)
Second-life grade (MWh)
SHS and productive use
C&I and minigrids
LDES (8 h+)
Left for recycling (MWh)
Percentages show how much of each use's yearly storage demand retired EV packs could meet. Packs are routed by fit: 2- and 3-wheeler packs to SHS first, car packs to C&I, and bus and taxi packs to LDES. Imported used packs are excluded. Demand figures are placeholders until each use is sized properly.
First waves, by project
Projects whose median retirement falls by the chosen year, ranked by expected volume. Each one is a candidate supply point for grading and reuse.
Project
Country
Asset
Stage
COD
Retires (median)
Size
Tonnes in view
Where it goes at end of life
Who owns retired battery cells
The project owner keeps title and the waste duty unless a contract passes it on. OEM take-back is negotiated case by case and suppliers price it separately.
The physical work usually goes to a removal or waste contractor, often with no requirement or budget to recycle.
Cells swapped under warranty go back to the OEM only where the warranty says so. Augmentation cells are not covered in the sources found.
In South Africa, the REIPPPP Implementation Agreement (BW6 template) makes the seller solely responsible for decommissioning, including responsible disposal of panels and e-waste. It is funded through a rehabilitation trust or bank guarantee in favour of the Department. The BESIPPPP version still needs checking.
What happens to each material
A c-Si module is about 76% glass, 10% polymer, 8% aluminium, 5% silicon, 1% copper and under 0.1% silver by mass.
Aluminium frames are the easy win. Clean 6000-series extrusion goes to remelt.
Glass is low-iron and carries EVA residue and sometimes antimony. Container furnaces need trials, and the fallback is lower-grade uses such as glass fibre, foam glass or aggregate.
Silicon is lost in the shred-and-mill routes used in South Africa today. It ends up in fines sent to smelters or mixed into cullet. Thermal and chemical routes such as ROSI in France recover silicon and silver. Recovered silicon is about 2N pure, far from solar grade, but tests show it can make ferrosilicon.
LFP batteries have little metal value. In 2024 European recyclers charged €3,000-4,000 per tonne to take LFP scrap, against €0-400 for NMC. That makes second life the better first outlet for LFP.
Rules that shape the routes
South Africa's EPR regulations came into force in May 2021, and portable batteries were added in 2023. PV panels are treated as e-waste, and e-waste is banned from landfill. Utility BESS probably falls outside "portable batteries", which leaves a gap.
Since 1 January 2025, the Basel e-waste amendments require prior informed consent for every cross-border e-waste shipment (entries A1181 and Y49). Exporting panels or black mass to Europe needs notification and consent from each country, which adds time and cost and favours processing in the region.
No PV or Li-ion recycler was found in the other 11 SAPP countries. Material from Zambia, DRC or Botswana would cross borders under Basel to reach Gauteng.
Eastern Africa has collection and dismantling (WEEE Centre and Enviroserve in Kenya, Enviroserve in Rwanda) but no operating panel or lithium battery recycler yet; a lithium plant is planned in Kenya. Until it runs, the nearest capable recyclers for Eastern Africa and Madagascar are in South Africa, by road or by sea to Durban.
West and Central Africa have no operating panel or lithium battery recycler either. Hinckley Recycling's lithium and lead-acid plants in Ogun State, Nigeria, are funded but not yet built. Formal collection exists in Accra (E-waste Handover Centre), Lagos (Hinckley) and Dakar, and lead-acid smelters operate in several countries. Spiro already reuses retired swap packs as storage at its Nigerian swap stations.
Recyclers and smelters
Facilities in the region that can take a stream today, and the overseas plants that recover silicon and silver. Capacities are rarely published, and locations marked approximate need checking.
Facility
Town
Material
Process
Status
Note
Haul routes to recyclers
Collection point
Country
PV (t)
Batteries (t)
Goes to
Distance (km)
Borders
Corridors used
Waste is assigned to its nearest corridor town, then routed by the shortest corridor path. Batteries go to Gauteng (Cwenga Lib, Reclite). PV goes to Gauteng (DESCO) or Cape Town (Ewaste Africa), whichever is nearer. Eastern Africa, the Horn of Africa and the Indian Ocean islands have no capable recycler yet, so their material also goes to South Africa, by road or by sea to Durban; the table also shows the nearest East African collection centre. Lines are drawn town to town; road distances are straight-line ×1.25 and sea legs ×1.15. Each border is a Basel prior-informed-consent step. Ports are where material for ROSI and other overseas recyclers would leave. West and Central Africa are not linked by road to South Africa in this model, so their routes end at the nearest seaport for export, and the table shows the nearest formal collector.
How the numbers are built
Projects
Solar PV: every utility and C&I unit of 1 MW or more in the 49 countries, from the Global Energy Monitor Integrated Power Tracker (September 2026). Solar thermal is excluded. Units that GEM cross-references to TransitionZero records are left out, because that data is licensed CC BY-NC; this removes about a tenth of operating capacity. Ten notable operating plants of 6.5 MW and more that this removed (for example Gorou Banda in Niger, Cuamba in Mozambique, Soroti in Uganda) are added back from other public sources.
Battery storage: 71 entries compiled by hand from public sources. These include BESIPPPP windows 1 to 3, Eskom phases 1 and 2, the World Bank BEST project in Côte d'Ivoire, Mali and Niger, Senegal's Walo and Diass systems, Cabeolica in Cabo Verde, and named IPP, utility and mining projects. Each row links to its source.
Green hydrogen and other projects of 1 GW or more are kept as their own layer, because they would dominate the totals with low certainty.
Pipeline weighting
Chance of reaching operation: operating 100%, construction 90%, financial close 85%, preferred bidder 60%, pre-construction 50%, development 30%, on hold 20%, announced 15%, shelved 5%.
Projects with no date take a default commissioning year: construction 2027, pre-construction 2029, announced 2031.
AC ratings are converted to DC at 1.25. Unknown ratings use 1.15.
Retirement and mass
PV: IRENA and IEA-PVPS Weibull loss model, 30-year mean life. Regular loss uses α 5.38 and early loss uses α 2.49. Module mass runs from 75 t/MWp (2015 and earlier) down to 55 t/MWp (2026 onwards).
BESS (LFP): cells retire at about 70-80% state of health. The Weibull life is 13 years (regular) or 10 years (early), α 4, plus 15% for augmentation cells. Battery modules weigh about 7 t/MWh, with another 4 t/MWh of containers and PCS not counted.
Second-life share: 30% of retired PV at 80% of rated power, and 60% of retired battery MWh at 75% state of health.
Early failures and repowering (assumed)
0.5% of modules lost in transport and installation, then 0.1% a year to hail, wind, fire and hot spots.
10% of each utility fleet repowered at age 15. Half of those modules are fit for reuse at about 85% of rated power.
This stream partly overlaps the IRENA early-loss scenario, so use it with the regular scenario.
EV packs (assumed, low / central / high)
2- and 3-wheelers: assumed yearly motorcycle sales per country (Nigeria 300,000; Tanzania 160,000; Burkina Faso 150,000 and so on). Benin, Togo and Nigeria start from Spiro's reported fleets (8,000 bikes in Benin and Togo by 2023, about 3,500 in Nigeria by 2025). E-shares follow Kenya's path (0.5% in 2021 to about 15% in 2025) a few years later, capped at 40%, 70% or 85%. Each bike has 2 packs of 3 kWh, with a 4-year life in swap fleets.
Buses: Golden Arrow had 120 e-buses by end 2025 and plans 60 a year (324 kWh LFP). MyCiTi has 38 on order. Dakar's BRT runs 121 buses with 560 kWh packs (2024), Accra received 100 e-buses in 2024, and Lagos has 13; other metros and countries are assumed. Minibus taxis: about 20,000 new a year in South Africa, with 80 kWh packs.
Cars: South African plug-in sales from naamsa (2024: 1,231 BEV and 738 PHEV; 2025: about 1,050 BEV and 2,808 PHEV), rising to 60%, 80% or 95% of a 560,000 market. The rest of SAPP adds 6%; cars in Eastern, West and Central Africa are not modeled yet. Packs average 38 kWh with a 13-year life.
Second-life grade: 50-70% of packs pass grading, at 75% state of health. Pack weights are 7-9 kg/kWh.
Under 1 MW
Off-grid lights and solar home systems use IRENA 2025 country stock (no figures for the Central African Republic), replaced every 3 years (lights) or 5 years (SHS), at 160 t per MWp for the whole kit.
Minigrids use IRENA 2025 capacity, with 2 MWh of battery per MWp replaced every 8 years.
South Africa rooftop PV totals 8.3 GW (NTCSA, May 2026), mostly installed 2022-2023, on a 25-year mean life. Home batteries assume 675,000 solar households (StatsSA), 60% with a battery averaging 7 kWh, on a 10-year life.
Kenya captive (C&I) solar: 373 MW by June 2026 (EPRA), with earlier years back-cast at the same 24% a year growth, 25-year life. Rooftop and C&I data for the other countries was not found, so they are undercounted.
Each country's total is spread across its towns by population. Towns stand in for collection points, not for where the kits sit.
What changed in v0.6 (19 November 2026)
Later the same day (v0.6.2): Sudan, South Sudan, Eritrea, Somalia, Mauritius and Seychelles added (49 countries), with their solar plants from the same tracker, six battery systems in Mauritius and the Seychelles, IRENA off-grid stock for Eritrea, Somalia and South Sudan, and road and sea routes for each.
Added 25 countries: 16 in West Africa, 7 in Central Africa, plus Djibouti and Comoros. Use the Region or country menu to filter.
All countries now use the September 2026 release of the GEM Integrated Power Tracker (v0.5 used March 2026), with TransitionZero-linked units left out and ten notable plants added back from other public sources. Operating utility solar in Southern Africa reads about 6.5 GWp instead of 7.2 GWp, mostly because of that exclusion; the pipeline in the six Eastern countries of v0.5 grows from about 6.6 to 8.4 GWp.
23 battery storage entries added from public sources (71 in all), IRENA off-grid stock for 23 more countries, West African e-motorcycle and e-bus streams, 7 recyclers and collectors, and 33 West and Central African corridors and sea links.