Central African Power Pool grid atlas

Cameroon, Central African Republic, Chad, DR Congo, Republic of the Congo, Equatorial Guinea, Gabon and Sao Tome and Principe: the grid today, every power plant of 1 MW and above, the pipeline and the CAPP priority projects. Public data.

Grows where the grid hasn’t.

    2026Network and projects expected in service by this year

    Voltage

    50132330765 kV

    Showing 50 kV and up

    Color lines by

    Background

    Choose power plants

    SmallestLargest

    Showing 10 MW to 12,000 MW (all)

    Type
    Status
    Circle size

    Move the year above to look back to 2004 or ahead to the 2030s. Tap anything on the map for details.

    More options

    Transmission today (OpenStreetMap, Nov 2026)

    Pipeline transmission

    Power plants: filled circle is operating, ring is under construction or planned, circle area shows MW.

    Constraints

    Color: share of rating usable (SAPP) or in use (EAPP, WAPP and CAPP, dashed) under 50% 50-79% 80%+. Width: rated MW. All links on one map

    The MW label shows power actually traded or contracted; its color compares it with the rating where one is published: 80%+, 40-80%, under 40%.

    Resources

    Filters

    What is on the map

    Existing lines and substations: OpenStreetMap contributors (ODbL), extracted 17-18 November 2026 (openstreetmap.fr and Geofabrik extracts). All power lines tagged 66 kV and above plus lines with no voltage tag. Coverage is uneven: the DR Congo, Cameroon, Congo and Equatorial Guinea have their main lines mapped; Chad, the Central African Republic and Sao Tome and Principe have few mapped lines. Gaps filled from the World Bank Africa grid map 2017.

    Gap-fill: where a line in TANESCO's 2015 network, the World Bank 2017 DRC grid or the World Bank 2017 Africa grid is more than 3 km from any OSM line, the missing stretch is drawn dotted with its source and year. These can be out of date. Line lengths are mapped segment lengths, so a double circuit counts once.

    Generation, 1 MW and above, merged without duplicates in this order: our curated register (projects we track with their date history), Global Energy Monitor's Global Integrated Power Tracker (September 2026 release, CC BY 4.0; units rolled up into one plant per status, cancelled, shelved, mothballed and retired units left out, and records GEM took from TransitionZero left out because their license is non-commercial), then the WRI Global Power Plant Database (2021), OpenStreetMap plants with a tagged capacity and the World Bank AICD inventory (about 2011), each only where nothing is already mapped nearby. Smaller plants (added 17 Nov 2026) come last, from Global Energy Monitor and then OpenStreetMap, only where no plant is mapped within 2 km, so they never replace a larger plant. Each plant says which source it came from. Pipeline generation and transmission: utilities, regulators, funders (World Bank, AfDB, EU), the Nile Basin Initiative and press. Each feature links its source.

    Pipeline routes are drawn substation to substation and are indicative, not surveyed alignments. Where no public in-service date exists, the year is our estimate and is marked as such.

    Constraints are qualitative flags from published reports, not a load-flow study.

    World Bank 2017 planned lines are kept as a record of the 2017 plan: many have since been built or dropped.

    Towns in the search: GeoNames (CC BY 4.0), places with 1,000 or more people plus capitals and district seats. Distances from a town to the grid are straight-line distances to the nearest mapped line of 66 kV and above.

    Map colors

    Line colors follow the Southern African Power Pool's grid map (2021, version 2), so every Aloe Energy grid atlas reads the same way: solid for existing lines, broken for proposed ones. The interface uses Aloe Energy's palette.

    Regional statistics

    Installed capacity: Mission 300 compact figures for Cameroon, Chad and the Republic of the Congo (Africa Energy Portal compact brief, 2026), DR Congo peak demand from the SAPP monthly report (August 2026), and for the other countries the sum of operating units in Global Energy Monitor (Sep 2026). Electricity access: World Bank WDI (2024 data). Interconnector ratings and trade: Africa Energy Portal Central Africa compact brief (2026). CAPP publishes no transfer-limit table; the only operating line between CAPP members is Congo - DR Congo (150 MW). The DRC's lines to Zambia (SAPP limits) and to Rwanda and Burundi (EAPP) are shown for context.

    History and the master plan

    Looking back with the year slider, plants appear in the year they were commissioned (WRI database and the project register); plants with no known year stay faint. The transmission network is today's, because line build years are not in the open data. Priority projects: CEEAC/CAPP priority investment programme as presented by CEEAC in March 2017, with status from 2026 sources. CAPP has no published master plan with dates; the years on the map are the latest public targets or our placeholders. Routes are drawn town to town and are indicative.

    Comments

    Use the comment control on this page. Every pipeline project has a short tag at the bottom of its popup (for example #moma or #caculo-cabaca); quote it so the thread points at the right project. Opening the page with that tag after the address jumps straight to it.

    Deal stage and slippage

    Stages run from concept to operating in eight steps. The slippage score compares the latest in-service year with the first one found in public sources; each date links to where it was said. Our own estimates are never scored.

    Coming next

    Demand and grid-arrival layer (settlements, mines, distance to grid), then quantified constraints (interconnector limits, hosting capacity, price spreads).