The lines that tie Africa's national grids together are rated for far more power than they can safely move. This map shows every published cross-border link in the Southern African Power Pool and the Eastern Africa Power Pool, colored by the share of its rating that is usable or in use today.

68%of the rated capacity on SAPP's 25 cross-border links can be used: 7,764 MW of 11,400 MW
24 of 25SAPP links are held back by grid stability, not by the size of the wires
5links can use less than half their rating. Beitbridge - Messina carries 15 of 70 MW
10%of the 2,000 MW Ethiopia-Kenya HVDC line is contracted today; Kenya's grid caps it below 500 MW
The map

Rated against usable, link by link

Thicker lines are rated for more power. The color shows how much of that rating can be used. Click a line for its limits, or a row in the table below to find it on the map. Megawatt labels appear as you zoom in.

Show
under 50% of rating 50-79% 80% or more EAPP: share of rating in use EAPP: rating not published SAPP internal corridor

The two pools are measured differently. SAPP publishes a usable transfer limit for each link, so a SAPP color says what the link can carry. EAPP publishes no limits, so an EAPP color says how much of the rating is contracted or flowing today, which can be low for reasons other than the line. Endpoints sit at the named substations and the straight lines are schematic, not routes.

Why the gap

Three limits on every line

A line's rating is its thermal limit: how much current the wires carry before they overheat and sag. The usable limit is the lowest of three, and in Southern Africa it is almost never the wires.

ThermalThe conductor and the transformers at each end. Binds on one SAPP link, Bulawayo-Francistown.
VoltageHow far voltage sags along a long, lightly supported line under load. Often close behind stability.
StabilityWhether the two grids stay in step after a fault. Binds on 24 of 25 SAPP cross-border links. Compensation (SVC, STATCOM), stronger substations and generation near the load raise it.
The table

Every link

All 40 links: SAPP transfer limits and EAPP use of rating
LinkPoolUtilitieskVRated MWUsable MW (SAPP) or in use (EAPP)Share of ratingBinding limit
SAPPZESA - Eskom132701521%stability
SAPPBPC - Eskom40065019029%stability
SAPPHCB - ZESA33070022031%stability
SAPPZESA - BPC40070022031%stability
SAPPEskom - NamPower22050019539%stability
SAPPZESA - EDM110703854%stability
SAPPEskom - NamPower40063038060%stability
SAPPBPC - Eskom1321157061%stability
SAPPZESCO - ZESA33070042861%stability
SAPPEskom - LEC1321409064%stability
SAPPSNEL - ZESCO33050033367%stability
SAPPEskom - EEC1321007676%stability
SAPPEEC - EDM4001,3001,00077%stability
SAPPSNEL - CEC22031024780%stability
SAPPSNEL - ZESCO22031024780%stability
SAPPEEC - EDM27516513381%stability
SAPPBPC - Eskom13230024582%stability
SAPPEskom - EDM4001,3001,10085%stability
SAPPEskom - EEC4001,3001,10085%stability
SAPPEskom - EDM110756789%stability
SAPPZESCO - NamPower22020018090%stability
SAPPZESCO - NamPower (Caprivi link)22020018090%stability
SAPPHCB - Eskom53375070093%stability
SAPPBPC - Eskom13211511096%stability
SAPPZESA - BPC220200200100%thermal
SAPPZESA internal33070022031%stability (internal corridor)
SAPPCEC - ZESCO internaln/a50032565%stability (internal corridor)
SAPPEskom/NTCSA internal corridor7652,6001,71066%stability (internal corridor)
SAPPEskom/NTCSA internal corridor7652,6001,80569%stability (internal corridor)
EAPPEAPP4001,250 or 2,400504%in use, not a limit
EAPPEAPP132350309%in use, not a limit
EAPPEAPP5002,00020010%in use, not a limit
EAPPEAPP2301508355%in use, not a limit
EAPPEAPP230n/a15n/ain use, not a limit
EAPPEAPP220n/a27n/ain use, not a limit
EAPPEAPP220n/a27n/ain use, not a limit
EAPPEAPP220n/a27n/ain use, not a limit
EAPPEAPP220n/a27n/ain use, not a limit
EAPPEAPP110n/an/an/ain use, not a limit
EAPPEAPP110n/a10n/ain use, not a limit

SAPP: thermal rating and applicable (usable) limit from SAPP's published transfer-limit table (undated; read 11 November 2026). Some links appear twice, once in each direction. EAPP: ratings and contracted or traded MW from I-TRACK (2025), Capital Ethiopia, AfDB, KETRACO, AREEN and the Nile Basin Initiative; the source is in each popup. Kenya-Tanzania has two ratings in the AfDB document (1,250 MW and 2,400 MW); the share uses the lower one.

What it means

Plan for the limit, not the rating

  • Imports are smaller than the map suggests. A country at the end of one long line, like Zimbabwe at Beitbridge or Namibia at Kokerboom, can count on a fraction of the rated megawatts.
  • The fix is often at the ends. Where stability binds, compensation and stronger nodes raise the limit for much less than a new line.
  • Power close to demand helps twice. Generation near the load supports voltage and stability on the line, and it covers the gap when imports fall short. See our work on grid-ready mini-grids.
Go further

Related

Reference

Sources and updates

What changed

The map is rebuilt from the same data as the SAPP and EAPP grid atlases, so it changes when their monthly refreshes find a new limit or a new trade figure.

  • November 2026 - First edition: 25 SAPP cross-border links and 4 internal corridors from SAPP's transfer-limit table, 11 EAPP links with rating and use.

Common questions

What is an interconnector transfer limit?

The most power that can safely flow across a link between two grids. It is the lowest of the thermal, voltage and stability limits. SAPP publishes it for each cross-border link alongside the thermal rating.

How much of SAPP's interconnector capacity can be used?

About 68%. The 25 cross-border links are rated 11,400 MW together and their usable limits add up to about 7,760 MW. Stability sets the limit on 24 of them.

Which interconnector is tightest?

Beitbridge-Messina, between Zimbabwe and South Africa, can carry 15 MW of its 70 MW rating. Four other links can use less than half their rating: Phokoje-Matimba, Songo-Bindura, Insukamini-Phokoje and Aggeneis-Kokerboom.

Why does the Ethiopia-Kenya line carry so little?

The HVDC line is rated 2,000 MW, but about 200 MW is contracted today, rising to 400 MW from December 2026. Congestion inside Kenya's grid caps flows below 500 MW, so the limit is in the receiving grid, not the line.

Can I get the data?

The map is free to view and cite. The compiled table is available on request by email at [email protected].