Start here

Grids and planning

Near the grid, not on it

A screening atlas of 47 African countries. It shows how many people without electric light live close to an existing or planned power line, and where mini-grids could reach them first and join the grid later.

499 million of the 633 million people living without night-time light are within 15 km of a power line.

For: Communities and the public, Project developers and utilities, Governments, funders and researchers

Grids and planning

Screen a site or route

Draw a mini-grid site or a power line route, or load a KML, KMZ or GeoJSON file, and get 25 open-data checks in seconds: protected areas, rivers, homes, forest, slope and more, flag by flag, with no score. The full screen with building footprints is free on request, anywhere in Africa.

A straight 16.6 km line in our Malawi example passes within 10 m of 75 buildings; following the roads trades that for less clearing.

For: Project developers and utilities, Governments, funders and researchers

Grids and planning

Where a new line could go

Draw a transmission line anywhere in the Southern African Power Pool and get a least-cost route, its cost in today's US dollars with the substation works at each end, and the change in power flows on the 2026, 2030 or 2035 grid.

Built lines run within 5 km of our least-cost route for a median 40% of their length, against 19% for a straight line.

For: Project developers and utilities, Governments, funders and researchers

Planned: one search box for a town, district or country that opens the right map, zoomed to that place.

Grid maps

Interactive atlases of the grid, power plants and plans.

Grids and planning

The Africa grid atlas

All five of our grid atlases on one map: 48 countries from Senegal and Sudan to Somalia, the Cape, Madagascar and Mauritius, with the grid, power plants, the pipeline and the regional plans.

359 GW of plants are in the pipeline, more than twice the 147 GW operating today.

For: Communities and the public, Project developers and utilities, Governments, funders and researchers, Software developers and data users

Grids and planning

The SAPP grid atlas

The Southern African Power Pool on one map: today's high-voltage grid, every power plant of 1 MW and above, the project pipeline and its delays, and SAPP's draft master plan to 2045.

Only 75% of the capacity planned for 2012 to 2021 was built.

For: Project developers and utilities, Governments, funders and researchers, Software developers and data users

Grids and planning

The EAPP grid atlas

The Eastern Africa Power Pool core on one map: Ethiopia, Kenya, Uganda, Rwanda and Burundi, with Tanzania and DR Congo. The grid, plants of 1 MW and above, the pipeline with its delays and the 2014 master plan.

The Ethiopia-Kenya link is rated 2,000 MW; about 200 MW is traded.

For: Project developers and utilities, Governments, funders and researchers, Software developers and data users

Grids and planning

The WAPP grid atlas

West Africa on one map: 16 countries from Mauritania and Senegal to Nigeria and Niger. The grid, plants of 1 MW and above, regional lines such as CLSG, OMVG and North Core with their delays, interconnectors and the 2019-2033 master plan.

About 8% of West Africa's electricity is traded across borders.

For: Project developers and utilities, Governments, funders and researchers, Software developers and data users

Grids and planning

The CAPP grid atlas

Central Africa on one map: 8 countries from Chad to the DR Congo. The grid, plants of 1 MW and above, regional lines such as the Cameroon - Chad link and Gabon - Congo 400 kV with their dates, interconnectors and the CAPP priority projects.

Only one power line joins two CAPP members today.

For: Project developers and utilities, Governments, funders and researchers, Software developers and data users

Grids and planning

The Madagascar and Indian Ocean grid atlas

Madagascar's three small grids on one map, with the 220 kV backbone meant to join them, the island grids of Mauritius and Seychelles, plants of 1 MW and above, and the pipeline with every date that was promised.

JIRAMA sells at about 795 Ar per kWh against a cost of about 1,225 Ar.

For: Project developers and utilities, Governments, funders and researchers, Software developers and data users

Grids and planning

What the interconnectors can really carry

A map of every published cross-border link in the Southern African and Eastern Africa power pools, colored by the share of its rating that is usable or in use. 25 SAPP links, 11 EAPP links, with each limit and its source.

SAPP's cross-border links can use about 68% of their 11,400 MW rating.

For: Project developers and utilities, Governments, funders and researchers

Near the grid and country data

Who lives near the grid but off it, when it may arrive, and one page per country.

Grids and planning

Near the grid, not on it

A screening atlas of 47 African countries. It shows how many people without electric light live close to an existing or planned power line, and where mini-grids could reach them first and join the grid later.

499 million of the 633 million people living without night-time light are within 15 km of a power line.

For: Communities and the public, Project developers and utilities, Governments, funders and researchers

Grids and planning

Plan a connection in Zambia

Pick a place in Zambia to see the nearest grid-extension site in the Rural Electrification Master Plan 2025-2030, its planned year and two likely arrival bands.

Of the plan’s 3,438 grid sites, 618 are likely to see the grid before 2030.

For: Communities and the public, Project developers and utilities

Grids and planning

Lit but off the map

Places that show light at night but are missing from OpenStreetMap, each with a chance band and a link to map it. A free download as CSV and GeoJSON (ODbL 1.0).

22,106 places to check and map.

For: Communities and the public, Governments, funders and researchers, Software developers and data users

Country data

One page per country

The grid, power plants and people living near the grid but off it, plus Mission 300 targets and emission factors, for 48 African countries.

For: Communities and the public, Project developers and utilities, Governments, funders and researchers

Site and route screening

A first desk look before a field visit or a feasibility study.

Grids and planning

Screen a site or route

Draw a mini-grid site or a power line route, or load a KML, KMZ or GeoJSON file, and get 25 open-data checks in seconds: protected areas, rivers, homes, forest, slope and more, flag by flag, with no score. The full screen with building footprints is free on request, anywhere in Africa.

A straight 16.6 km line in our Malawi example passes within 10 m of 75 buildings; following the roads trades that for less clearing.

For: Project developers and utilities, Governments, funders and researchers

Grids and planning

Where a new line could go

Draw a transmission line anywhere in the Southern African Power Pool and get a least-cost route, its cost in today's US dollars with the substation works at each end, and the change in power flows on the 2026, 2030 or 2035 grid.

Built lines run within 5 km of our least-cost route for a median 40% of their length, against 19% for a straight line.

For: Project developers and utilities, Governments, funders and researchers

Grids and planning

From power plant to battery site

When Africa's coal, gas and oil plants close, their grid connections can host batteries and solar. 313 sites, when each one frees up, and an hour-by-hour test of what reuse does for emissions in South Africa.

Solar and a full-size battery on South Africa's closing coal sites save 13 to 19 Mt of CO2 a year.

For: Project developers and utilities, Governments, funders and researchers

Water and climate risk

When the river runs low

How much of each grid between the Zambezi and the Nile, and in West Africa, is hydro, what a dry year takes away in megawatts, and whether the interconnectors can carry the difference. 27 countries, two modeled cases and the 2024 drought as it happened.

Zambia lost 37% of its hydro output in 2024; its import lines had room for about 430 MW.

For: Project developers and utilities, Governments, funders and researchers

Prices and policy

Tariffs, signed power prices and what each compact commits to, each with its source.

Power prices and policy

Who supplies the power, what it costs, and when it goes off

The utilities, regulators, tariffs by customer class and load shedding since 2015 for the 17 SAPP and EAPP core countries, every number linked to the regulator or utility document.

A standard household block costs US$0.015 to 0.21 per kWh, from Angola to Rwanda.

For: Communities and the public, Project developers and utilities, Governments, funders and researchers

Power prices and policy

Who uses the power on the grid

Electricity sold to households, businesses, industry and mines in 49 African countries: the utility's or regulator's own split for 16, the UN's national split for 47, household use per connection, peaks and load curves, every number linked to its source.

A household connection uses 41 to 206 kWh a month, from Uganda to Zambia.

For: Communities and the public, Project developers and utilities, Governments, funders and researchers

Power prices and policy

What power really costs

69 signed power prices across Africa's five power pools, each with its source, next to SAPP's day-ahead market, build costs for new and existing plants, fuel price trends and a calculator that compares plant types by the hours they run.

The cheapest solar deal works out at US$22 per MWh in 2025 dollars, against US$80 to 182 for coal.

For: Communities and the public, Project developers and utilities, Governments, funders and researchers

Power prices and policy

Energy compacts, side by side

All 35 published Mission 300 national energy compacts next to each other: access targets, grid and off-grid plans, mini-grid rules, e-waste and progress, each quoted from the compact.

18 of 35 compacts clearly address mini-grids meeting the grid.

For: Governments, funders and researchers, Project developers and utilities

Carbon

Emission factors, certificates and carbon markets, and what they are worth.

Climate and carbon

Grid emission factors

Open, indicative grid emission factors for 38 African countries, from Southern and Eastern to West and Central Africa: average intensity with and without imports, and the operating, build and combined margins carbon projects use.

South Africa's grid emits about 0.82 tCO2 per MWh.

For: Project developers and utilities, Governments, funders and researchers, Software developers and data users

Climate and carbon

Renewable energy certificates

Where I-RECs can be issued across 49 African countries, how many have been issued, and what a megawatt-hour of solar earns as a certificate compared with carbon credits.

5 of 12 countries have issued I-RECs.

For: Project developers and utilities

Climate and carbon

Article 6 carbon markets

Which Southern African countries have signed Paris Agreement carbon deals, with whom, which projects are authorized, and the rules and government shares in each.

3 of 12 countries have signed bilateral deals.

For: Governments, funders and researchers, Project developers and utilities

Climate and carbon

Carbon, certificates and the bottom line

How much carbon credits, I-RECs and D-RECs really change the tariff, returns and bankability of grid solar, rooftop solar and mini-grids, with a report and an interactive model.

Up to 10% off a South African solar tariff at US$10 per tonne; almost nothing in Zambia.

For: Project developers and utilities, Governments, funders and researchers

Waste and bioenergy

Power and heat from sugar mills, landfills, sewage works, kilns and crop residues.

Waste to Wealth

Power from waste

Sugar mills, landfills, sewage works, cement kilns, crop residues and city waste in all 54 African countries: 1,321 sites, what each could add in power and heat, what it costs and what it does for CO2.

Upgrading the boilers at 100 sugar mills could add 1.1 GW at about US$47 per MWh.

For: Project developers and utilities, Governments, funders and researchers, Software developers and data users

Second life

Where retired solar panels and batteries will end up, and when.

Batteries and second life

The second-life atlas

Where solar panels, battery storage and electric vehicle batteries across 49 African countries will retire, when, and in what volume, and where they could be reused or recycled.

About 23 GWh of retired batteries could be reused as storage by 2040.

For: Communities and the public, Project developers and utilities, Governments, funders and researchers

Batteries and second life

Where the supply will land

Tonnes of retired solar panels and batteries within reach of 1,105 towns from 2026 to 2040, the distance to the nearest recycler, and the first year each country holds enough for a hub.

South Africa could support a hub from 2028, Zambia from 2039.

For: Project developers and utilities, Governments, funders and researchers

Open data and methods

Files, prints and the methods behind them.

Open data

Open data downloads

The tables we compiled ourselves, as plain CSV files. Free to use for any purpose, including commercial work, with credit. Each release has a version number, so you can cite exactly what you used.

For: Software developers and data users, Governments, funders and researchers, Project developers and utilities

Open data

Free grid posters

A poster pair for every country in our grid atlases, and for EAPP and the whole of Eastern and Southern Africa: the grid and power plants today, and everything planned to 2035 and beyond.

For: Communities and the public

Open data

How the SAPP grid atlas is built

Every source, every processing step, and which lines, substations and plants are confirmed by more than one source. Written so that someone else could check our work, or repeat it.

For: Software developers and data users, Governments, funders and researchers

How we work

Public data, open methods

Our atlases use only openly available data, such as satellite night lights, population grids, mapped power lines and public project registers. Each map lists its sources, and every figure is either sourced or labeled as an assumption.

They are screening tools. They point to where a closer look is worth it, not to final answers, and the numbers will change as the methods are reviewed.

Coming next

  • Power first, grid next: a short paper on planning mini-grids as future parts of the national grid.
  • More than one life: a report on the second-life potential of solar panels and batteries in Southern Africa.
  • Open code and data, published with each report.

The maps are free to view. For the map layers behind them, to review a draft or to hear when the reports are out, email [email protected].

Data and terms

Using the maps and the data

Free to use, with credit. Our maps, charts, reports and the data we compiled ourselves are published under CC BY 4.0: share, quote, embed and build on them for any purpose, with the credit "Aloe Energy, aloeenergy.org" and a link. The embed code and citations are in the "Embed or cite this map" box on each atlas page.

Data from others keeps its own license. Grid lines and substations come from OpenStreetMap contributors (ODbL), power plants from Global Energy Monitor (CC BY 4.0), and each atlas lists the rest in its Sources tab.

Tables are free downloads; map layers are on request. The tables we compiled ourselves are free CSV downloads on the open data page. The geospatial layers behind the maps are on request, apart from the few marked as downloads, such as Lit but off the map. Email [email protected] with the layers and countries you need and what they are for, so we can flag known gaps and send the right version.

Screening tools, not survey data. Lines, plants and dates can be out of date or wrong, and the maps are not for engineering or investment decisions. A monthly check updates each atlas, and its "What changed" list records every correction. Found an error? Email us.

Full terms, licenses and privacy →

Across the industry

Open energy tools and maps for Africa

A lot of good, free tools already map Africa's energy systems, but they are scattered and hard to find. This directory gathers 31 of them in one place: who runs each one, what it is for, and where to open it. Our own maps are in the Aloe tools tab.

Type
Coverage

Showing all 31 tools

Open Infrastructure Map

Volunteer project on OpenStreetMap

A world map of power lines, substations and plants drawn straight from OpenStreetMap. The best first look at any grid, anywhere.

MapGlobalGridsPower plants

MapYourGrid

Open Energy Transition and partners

A community effort to map the world's transmission grids in OpenStreetMap, with training and tools. Kenya, Uganda, Nigeria and Benin are among its country pages.

MapGlobalGrids

Gridfinder

Arderne, Zorn, Nicolas and Koks

A global research dataset that predicts where distribution lines run, using satellite night lights, next to mapped transmission lines. Free to download.

Data and statisticsGlobalGridsEnergy access

Clean Energy Access Tool

European Commission Joint Research Centre

Grid, power plants, night lights, schools and health sites for Sub-Saharan Africa on one map, with country downloads in Excel and shapefile.

MapAfricaGridsEnergy access

Global Integrated Power Tracker

Global Energy Monitor

Every sizeable power plant and project in more than 200 countries, with capacity, owner, status and start year. Latest release September 2026.

TrackerGlobalPower plants

African Energy Information System

African Energy Commission (African Union)

Official energy balances, installed capacity, prices and emissions for African Union member states.

Data and statisticsAfricaPower plantsPolicy and utilities

Ember electricity data

Ember

Yearly and monthly electricity generation and power sector emissions by country, open under CC BY 4.0, with an API.

Data and statisticsGlobalPower plantsCarbon

Global Electrification Platform

ESMAP and the World Bank

Explores least-cost ways to reach universal access, by grid, mini-grid or stand-alone system, for the countries with the largest access gaps.

Planning toolGlobalEnergy access

Distributed Renewable Energy Atlas

World Bank, ESMAP, IFC and VIDA

Settlement-level data in 58 countries to find communities suited to mini-grids, solar and productive uses. Built to support Mission 300.

MapGlobalEnergy access

Energy Access Explorer

World Resources Institute

An open-source platform that layers more than 50 datasets on supply and demand to find priority areas for energy access.

Planning toolGlobalEnergy access

WACEL

World Bank and VIDA

The West Africa access to energy and layered data platform, for planning and monitoring access projects across that region.

Planning toolPart of AfricaEnergy access

Mission 300 national energy compacts

World Bank Group and African Development Bank

The 35 country compacts behind the goal of connecting 300 million people by 2030, each as a PDF, with progress reports for some.

Report or libraryAfricaEnergy accessPolicy and utilities

Tracking SDG 7

IEA, IRENA, UN Statistics Division, World Bank and WHO

The official yearly scorecard on access to electricity and clean cooking, renewables and efficiency, by country.

Data and statisticsGlobalEnergy accessPolicy and utilities

GOGLA market data

GOGLA

Sales, investment and impact data for the off-grid solar industry, from solar lanterns to home systems.

Data and statisticsGlobalEnergy access

Global Solar Atlas

World Bank Group, funded by ESMAP

Solar resource maps and data layers for every country, with poster maps to download.

MapGlobalSun and wind

Global Wind Atlas

Technical University of Denmark and the World Bank

Finds high-wind areas anywhere in the world, with first calculations and free datasets.

MapGlobalSun and wind

Renewable Energy Zoning Tool

ESMAP, with UC Santa Barbara

Finds and ranks the zones best suited to solar, wind and offshore wind, with your own filters and cost inputs.

Planning toolGlobalSun and wind

Rooftop Solar Tool

NEO and the World Bank

Solar potential for each rooftop in 34 partner cities across 15 countries.

MapGlobalSun and wind

UPBEAT

ESMAP

Financial and operating performance of electric utilities across World Bank regions, from 2012 onward.

Data and statisticsGlobalPolicy and utilities

RISE

World Bank and ESMAP

Scores each country's policies and rules for electricity access, clean cooking, renewables and efficiency.

TrackerGlobalPolicy and utilitiesEnergy access

Energypedia

Energypedia, a wiki since 2010

More than 6,000 articles on sustainable energy in developing countries, with country pages, publications and events. Open under CC BY-SA 4.0.

Report or libraryGlobalPolicy and utilitiesEnergy access

energydata.info

World Bank Group

The World Bank's open energy data platform: thousands of datasets and the home of many of the tools listed here.

Data and statisticsGlobalGridsEnergy access

IFI default grid emission factors

International financial institutions working group, hosted by UNFCCC

The common default grid factors development banks use to count project emissions. The current file is labeled 2021 v3.2.

Data and statisticsGlobalCarbon

Article 6 Pipeline

UNEP Copenhagen Climate Centre

Tracks carbon deals and activities under Article 6 of the Paris Agreement worldwide: bilateral agreements, activities and national authorities.

TrackerGlobalCarbon

I-TRACK Foundation

I-TRACK Foundation (I-REC)

The body behind I-REC renewable energy certificates, operating in over 70 countries, with a map of where they can be issued.

TrackerGlobalCarbon

Climate TRACE

Climate TRACE coalition

An open emissions inventory that follows individual sources by satellite, with monthly data, downloads and an API.

Data and statisticsGlobalCarbonPower plants

Electricity Maps

Electricity Maps

Live and historical electricity mix and carbon intensity by grid zone, through a map and an API.

MapGlobalCarbon

Global E-waste Monitor

Global E-waste Statistics Partnership (ITU and UNITAR)

The reference report series on electronic waste worldwide. The latest edition is 2024.

Report or libraryGlobalEnd of life

Clean Cooking Planning Tool

World Bank

Shows pathways for a country to reach universal access to modern cooking by 2030.

Planning toolGlobalClean cooking

Every tool was opened and read on 10 November 2026; descriptions follow what each site says about itself. Listing a tool is not an endorsement, and we have no ties to any of them. Know one we missed, or see a line that is out of date? Email us and we will check it and add it.

Where Aloe Energy fits

We work in the spaces between these tools

Aloe Energy is small. We do not try to redo what larger teams do well. We take their open data, join it across borders and topics, add the layers that are missing, and keep it current.

What the field hasWhat we add
Maps of the lines that exist todayThe same lines with what is planned next to them: every transmission project with each date it was promised for, the master plans, and a slider back to 2004. See the SAPP, EAPP and Madagascar grid atlases and the paper Promised vs built.
Regional grid maps as images and reports as PDFsEach power pool as one interactive map: lines, plants, transfer limits and flagged constraints, checked against public sources every month, with a public log of what changed.
Least-cost plans and settlement data for electrificationOne simple question asked the same way in 39 countries: how many people without light live near a line but not on it. See the grid-edge atlas.
35 national energy compacts, one PDF eachAll of them side by side, every value with its page and quote.
Global default emission factors and worldwide trackersFactors for the 12 Southern African countries from 2024 data, with and without imports, and country-by-country pages on certificates and Article 6 deals.
Global e-waste totals and a 2016 solar waste projectionWhen and where solar panels, storage and vehicle batteries will retire in Southern Africa, year by year. See the second-life atlas.
Data spread across many portalsOne page per country that pulls the numbers together, with a country report to download.
What is still missing

Gaps nobody has closed yet, us included

These are the open questions we keep running into. Some are on our own list. All of them would be better solved together.

If you hold public data that helps with any of them, or you are working on one, we would like to hear from you.

  • Mini-grid locations. There is no open, current map of where mini-grids operate in Southern Africa, so nobody can say which ones the grid will reach next.
  • Distribution networks. Medium-voltage lines are mostly unmapped. Satellite predictions help, but utility maps are rarely public.
  • Substation capacity. Transformer sizes and spare capacity are published for only a few utilities.
  • Demand. Where people and businesses would use power, and how much, is modeled far more often than it is measured.
  • Recent regional data. Cross-border trade, transfer and outage figures appear late or only in reports.
  • Recycling capacity. Outside South Africa, public information on who can test, repair or recycle solar panels and batteries is thin.
  • Project delays. Promised dates are announced; slips rarely are. Tracking them takes reading the same sources year after year.
Funding

Grants and finance for energy projects in Africa

Who funds energy access, clean power and productive use in the countries we map: grants and calls for proposals, results-based financing, help to prepare projects, loans and equity, and buyers of renewable energy certificates and carbon credits. Filter by sector, from e-cooking and mini-grids to e-mobility and second-life batteries. 87 programs, from regional funds to country programs such as ZEDSI and ASCENT Zambia, each with its status, who can apply and a link to the funder.

Sector
Country
Type
Status
Who can apply

Showing all 87 programs

Open now: closes 30 November 2026

ASCENT Zambia results-based financing facility

Rural Electrification Authority (REA), Zambia, with the World Bank

Pays energy service providers after independent checks confirm they delivered solar home systems or clean cooking appliances to households in Zambia. The facility also targets mini-grid connections over its five years (2025 to 2030).

Sector
Solar home systems and off-grid solar, clean cooking and e-cooking, mini-grids
Funding
Per-company amounts not stated; ASCENT Zambia is a US$200 million World Bank grant plus about US$250 million from the government
Who can apply
Companies and developers
Where
Zambia
Status
First call for expressions of interest, for solar home system and clean cooking companies, closes 30 November 2026 at 15:00 Lusaka time. Guidelines and the concept note template are at REA's office.

Link: News report (SolarQuarter, 28 October 2026); the full notice and templates are at REA.

Results-based financing
Open now: closes 11 December 2026

Octopus Energy Africa Energy Entrepreneurship Awards 2026

Octopus Energy Generation

Awards for early-stage founders building energy businesses in Sub-Saharan Africa, with prize funding and mentoring.

Sector
Any clean energy
Funding
Prize funding plus mentoring; see the award page for amounts
Who can apply
Companies and developers
Where
Sub-Saharan Africa
Status
Applications close 11 December 2026 at 23:59 GMT.
Grant or call for proposals
Open now: closes 8 January 2027

IKI Small Grants, 8th international call

German International Climate Initiative (IKI), run by GIZ

Funding and capacity building for local, national and regional organizations in ODA-eligible countries that run climate or biodiversity projects, including emission cuts through clean energy.

Sector
Any clean energy
Funding
EUR 60,000 to 200,000 per project, for 1 to 3 years
Who can apply
NGOs and community groups. Organizations with an average yearly revenue of EUR 60,000 to 500,000
Where
All ODA-eligible countries, including all of Sub-Saharan Africa
Status
The 8th call opened 15 November 2026. The first step is an eligibility check on the IKI Small Grants platform, reported to close 8 January 2027: confirm the date there.
Grant or call for proposals
Apply any time

D-REC (Distributed Renewable Energy Certificates)

The D-REC Organization

Certificates for electricity from distributed renewable energy, such as mini-grids and solar home systems, so companies can sell the environmental attribute to corporate buyers as an extra revenue stream.

Sector
Renewable energy certificates and carbon credits, mini-grids, solar home systems and off-grid solar
Funding
Revenue per MWh certified, set by the market
Who can apply
Companies and developers
Where
Africa, Asia and Latin America
Status
Developers can join at any time; revenue depends on certificate sales.
Results-based financing
Apply any time

DARES (Distributed Access through Renewable Energy Scale-up)

Rural Electrification Agency of Nigeria, with the World Bank

Results-based grants for mini-grids, solar home systems, productive use and public institutions in Nigeria. Mini-grids are funded through performance-based grants, or through minimum subsidy tenders where developers bid for the smallest subsidy they need.

Sector
Mini-grids, solar home systems and off-grid solar, productive use and appliances
Funding
US$750 million program
Who can apply
Companies and developers
Where
Nigeria
Status
Developers apply through REA's online portal; grants are paid only after milestones are verified. Check REA for which windows are taking applications.
Results-based financing
Apply any time

Energise Africa

Energise Africa (crowdlending from UK retail investors)

Loans for solar home system, productive use and mini-grid companies in Sub-Saharan Africa, raised from individual investors. A newer product lends working capital against results-based financing payments that are due.

Sector
Mini-grids, solar home systems and off-grid solar, productive use and appliances
Funding
Sized per loan
Who can apply
Companies and developers
Where
Sub-Saharan Africa
Status
Companies start with the pre-qualification questionnaire on the Raise page.
Loans and equity
Apply any time

GET.invest Finance Access Advisory

GET.invest (European Union and member states, run on GIZ's GET.pro platform)

Free advice to get clean energy projects and companies ready for investment and matched with financiers: the Finance Catalyst for later-stage projects, and Finance Readiness Support for early-stage, locally owned companies. It is also the Team Europe one-stop shop for finding EU support for green energy in Africa.

Sector
Any clean energy
Funding
Free advisory; no grants
Who can apply
Companies and developers, NGOs and community groups, researchers and innovators
Where
Sub-Saharan Africa, the Caribbean and the Pacific
Status
Open year-round through its application portal. It gives advice only, not money, and charges no fees.
Project preparation and advice
Apply any time

I-REC Standard (International Renewable Energy Certificates)

I-TRACK Foundation, with national issuers; registry run by Xpansiv

International system for renewable electricity certificates. Generators register with the issuer in their country and earn one certificate per MWh, which buyers use for clean electricity claims.

Sector
Renewable energy certificates and carbon credits, grid-scale, commercial and industrial power, mini-grids
Funding
Revenue per MWh, set by the market
Who can apply
Companies and developers
Where
More than 15 African countries, where an issuer is active
Status
Register as a registrant with your country's I-REC issuer; Nigeria got its first local issuer in 2026.
Results-based financing
Apply any time

Ireme Invest

Rwanda Green Fund and the Development Bank of Rwanda (BRD)

Rwanda's green investment facility. It offers project preparation grants, recoverable grants and equity for green projects, plus a credit facility through BRD; clean energy is one of the eligible areas.

Sector
Any clean energy
Funding
Project preparation grants up to RWF 125 million; recoverable grants and equity up to RWF 300 million
Who can apply
Companies and developers
Where
Rwanda
Status
Applications go through the Rwanda Green Fund's call page; check it for the current window.
Project preparation and adviceGrant or call for proposalsLoans and equity
Apply any time

Nedbank Indalo Energy Resilience Fund

Nedbank and Indalo Inclusive

Interest-free finance for small businesses, NGOs and public benefit organizations in South Africa to buy solar, inverter and backup power systems.

Sector
Grid-scale, commercial and industrial power
Funding
R10 million fund
Who can apply
Companies and developers, NGOs and community groups
Where
South Africa
Status
Apply through Indalo Inclusive while funds last; questions go to [email protected].
Loans and equity
Apply any time

Sustainable Energy Fund for Africa (SEFA)

African Development Bank

Multi-donor fund for green mini-grids, green baseload power and energy efficiency. It gives project preparation grants to private developers, enabling environment grants mainly to public bodies, and concessional results-based finance, loans and equity alongside African Development Bank investments.

Sector
Mini-grids, grid-scale, commercial and industrial power, clean cooking and e-cooking
Funding
Varies by request
Who can apply
Companies and developers, governments and agencies
Where
All of Africa
Status
Funding requests can be sent at any time with SEFA's application form. Grants are not available to individuals.
Project preparation and adviceLoans and equity
Apply any time

Uganda Electricity Access Scale-up Project (EASP): subsidies and credit

Uganda Energy Credit Capitalisation Company (UECCC), with the World Bank

Price subsidies, paid through energy service companies, that lower what households and enterprises pay for off-grid solar, productive use equipment and clean cooking. A credit support facility adds credit lines and guarantees through partner financial institutions.

Sector
Solar home systems and off-grid solar, productive use and appliances, clean cooking and e-cooking
Funding
Part of a US$608 million World Bank project
Who can apply
Companies and developers
Where
Uganda
Status
The price subsidy program started in December 2024. Energy service companies and lenders take part through UECCC.
Results-based financingLoans and equity
Opening soon

ASCENT-GREEN

World Bank, with the Green Climate Fund

Regional facility offering affordable loans, results-based financing and technical assistance for private delivery of distributed renewable energy, clean cooking and productive use across Eastern and Southern Africa.

Sector
Mini-grids, solar home systems and off-grid solar, clean cooking and e-cooking, productive use and appliances
Funding
US$250 million from GCF; US$695 million in total
Who can apply
Companies and developers, governments and agencies
Where
21 countries in Eastern and Southern Africa
Status
Approved by the GCF Board on 28 March 2026; support reaches companies through national ASCENT programs.
Loans and equityResults-based financingProject preparation and advice
Opening soon

Benin rural electrification and renewable energy fund (FERER)

Fonds d'électrification rurale et des énergies renouvelables

Government of Benin

National fund that, under Benin's energy compact, co-finances private mini-grids (up to 50%) and solar kits (up to 35%), and can secure payments to independent power producers and pre-finance household wiring.

Sector
Mini-grids, solar home systems and off-grid solar, clean cooking and e-cooking
Funding
Up to 50% of mini-grid and 35% of solar kit costs
Who can apply
Companies and developers
Where
Benin
Status
The compact plans a dedicated team for the mini-grid and solar kit program from the second quarter of 2026. Contact the energy ministry or ABERME.

Link: Benin's Mission 300 national energy compact.

Grant or call for proposalsLoans and equity
Opening soon

Energy for Growth in Africa (E4G)

UNDP

Free technical assistance and investment-readiness support that helps clean energy projects of at least US$2 million reach financing.

Sector
Any clean energy
Funding
Technical assistance, not cash; for projects of US$2 million or more
Who can apply
Companies and developers, governments and agencies
Where
Congo, Côte d'Ivoire, Ethiopia, Kenya, Mauritania, Mozambique, Rwanda, Tanzania and Zambia (plus Tunisia)
Status
Expression of interest guidelines were published in July 2026, with the online form marked as coming soon. Questions go to [email protected].
Project preparation and advice
Opening soon

P-REC Aggregation Facility

Peace Renewable Energy Certificates

Energy Peace Partners, with the African Development Bank (SEFA) and the Nordic Development Fund

Pays mini-grid developers upfront in exchange for the rights to the renewable energy certificates their projects will generate, then sells those certificates to corporate buyers. Aimed at fragile and energy-poor countries.

Sector
Renewable energy certificates and carbon credits, mini-grids
Funding
US$11.3 million pilot
Who can apply
Companies and developers
Where
Central African Republic, Chad, DR Congo, Nigeria, Sierra Leone, Uganda
Status
SEFA approved a US$5.65 million reimbursable grant in March 2026, matched by the Nordic Development Fund. Contact Energy Peace Partners.

Link: News report (Green Building Africa, March 2026); P-REC details at energypeacepartners.com.

Loans and equityResults-based financing
Opening soon

PURE Rural Mozambique Climate Project

FUNAE (Mozambique's energy fund) and Enabel, with the Green Climate Fund

Competitive concessions for private mini-grid developers, plus results-based incentives for income-generating, climate-smart equipment that runs on renewable power, in rural Mozambique.

Sector
Mini-grids, productive use and appliances
Funding
About US$43.6 million from the Green Climate Fund
Who can apply
Companies and developers
Where
Mozambique
Status
Approved by the Green Climate Fund Board in March 2026; calls are expected through FUNAE.
Results-based financing
Opening soon

Regional DARES for West and Central Africa

Regional Program for Distributed Access through Renewable Energy Solutions

World Bank, with the governments of Benin, the Central African Republic, Liberia and Sierra Leone

Finances electricity for rural and underserved areas through solar home systems, mini-grids and other off-grid solutions, delivered with private companies.

Sector
Solar home systems and off-grid solar, mini-grids
Funding
US$200 million for phase 1 of an US$853 million program
Who can apply
Companies and developers
Where
Benin, Central African Republic, Liberia, Sierra Leone
Status
Phase 1 was approved 22 June 2026; watch each country's energy agency for calls to companies.
Results-based financingGrant or call for proposals
Calls by country

Africa Minigrids Program (AMP)

UNDP, funded by the Global Environment Facility, with each country's energy agency

Country-led technical assistance to build national markets for solar-battery mini-grids: delivery models, business model innovation with the private sector, financing and digital tools. In Zambia, REA launched its four-year AMP project in July 2026.

Sector
Mini-grids
Funding
Zambia: US$15 million project, including US$13.45 million from REA
Who can apply
Governments and agencies, companies and developers
Where
21 African countries
Status
Support and any calls are run by each country's project team.
Project preparation and advice
Calls by country

Energising Development (EnDev)

Germany, the Netherlands, Norway and Switzerland; run by GIZ and RVO

Long-running energy access program in about 20 countries. It publishes results-based financing calls for companies selling solar, clean cooking and other modern energy products.

Sector
Solar home systems and off-grid solar, clean cooking and e-cooking, mini-grids, productive use and appliances
Funding
Set per country call
Who can apply
Companies and developers
Where
About 20 countries in Africa, Asia and Latin America
Status
Calls are published on the EnDev website, country by country; RVO can be reached at [email protected].
Results-based financing
Calls by country

GEF Small Grants Programme

Global Environment Facility, run by UNDP

Grants for civil society and community-based organizations working on the environment, including low-carbon energy access that improves livelihoods. A CSO Challenge Program funds groups ready to scale up a proven solution.

Sector
Any clean energy
Funding
Usually up to US$50,000 per project; the CSO Challenge Program goes up to US$300,000
Who can apply
NGOs and community groups
Where
Most countries in Africa, through national programs
Status
Each UNDP country office runs its own calls, so dates differ by country. The link is the standard proposal template.
Grant or call for proposals
Calls by country

SUNREF green credit lines

AFD Group (Agence française de développement and Proparco), through partner banks

Green loans offered by local partner banks for renewable energy and energy efficiency investments by companies, often with technical help to prepare the project.

Sector
Any clean energy
Funding
Loans sized per project, set by the partner bank
Who can apply
Companies and developers
Where
Countries with a SUNREF program
Status
Available where AFD has a SUNREF partner bank; ask the participating banks in your country.
Loans and equityProject preparation and advice
Between rounds

ADELE results-based financing grant facility

Development Bank of Ethiopia (DBE), with the World Bank; administered by IDCOL

Results-based grants for off-grid solar companies that expand sales of stand-alone solar systems into rural and deep-rural Ethiopia, alongside DBE credit lines for the sector.

Sector
Solar home systems and off-grid solar
Funding
US$10 million RBF facility
Who can apply
Companies and developers
Where
Ethiopia
Status
The first round of calls ran in May 2024; no new round found on 19 November 2026.
Results-based financingLoans and equity
Between rounds

ADER calls for private mini-grid projects

Appels à projets de l'ADER

Agence de développement de l'électrification rurale (ADER), Madagascar, with AFD

Calls for private operators to electrify rural localities in Madagascar with mini-grids under public-private partnerships, with donor support.

Sector
Mini-grids
Funding
Set per call
Who can apply
Companies and developers
Where
Madagascar
Status
A call for 21 localities in the Anosy region opened in July 2025; check ADER for new calls.

Link: News report in French (L'Express de Madagascar via AllAfrica, July 2025).

Grant or call for proposalsResults-based financing
Between rounds

AECF Digital Innovation Fund for Energy and Climate (DIFEC)

Africa Enterprise Challenge Fund (AECF), funded by Sida

Milestone-based grants for digital solutions in distributed renewable energy, clean cooking, productive use, e-mobility, digital agriculture and the circular economy.

Sector
Solar home systems and off-grid solar, mini-grids, clean cooking and e-cooking, productive use and appliances, e-mobility, e-waste, recycling and second-life batteries
Funding
US$150,000 to 300,000 (early stage) or US$250,000 to 400,000 (scaling), with 1:1 matching
Who can apply
Companies and developers
Where
Sub-Saharan Africa
Status
The 2026 windows closed in April 2026; the program runs to 2028.
Grant or call for proposals
Between rounds

AECF REACT Kenya and REACT 2.0 Ethiopia

Africa Enterprise Challenge Fund (AECF), funded by Sida

Challenge funds for companies: results-based finance and milestone grants for solar, productive use, e-mobility and circular economy businesses in Kenya, and grants for solar and productive use companies in Ethiopia's Oromia, Somali and Amhara regions.

Sector
Solar home systems and off-grid solar, clean cooking and e-cooking, productive use and appliances
Funding
Ethiopia: US$250,000 to 400,000 with 1:1 matching; Kenya: set by the term sheet, with company matching
Who can apply
Companies and developers
Where
Kenya, Ethiopia
Status
The 2026 rounds closed in August 2026. AECF never charges application fees.
Results-based financingGrant or call for proposals
Between rounds

Africa Prize for Engineering Innovation

Royal Academy of Engineering

Training, mentoring and prize money for African engineers developing an innovation, including energy innovations.

Sector
Any clean energy
Funding
£85,000 in total; £5,000 to £50,000 per prize
Who can apply
Researchers and innovators, companies and developers
Where
Africa
Status
Applications for the current round closed 8 September 2026.
Grant or call for proposalsProject preparation and advice
Between rounds

All On Off-Grid Energy Challenge

All On

Yearly competition for Nigerian-owned clean energy companies, with grant and commercial funding plus technical help and investment-readiness support.

Sector
Mini-grids, solar home systems and off-grid solar, productive use and appliances
Funding
US$200,000 to US$1 million per company
Who can apply
Companies and developers. Nigerian-owned companies
Where
Nigeria
Status
2026 applications ran 2 to 31 July 2026. All On also offers debt and equity outside the challenge.
Grant or call for proposalsLoans and equity
Between rounds

ARE Francophone Investment Academy

Académie des investissements ARE francophone

Alliance for Rural Electrification (ARE), with the REPP 2 Technical Assistance Facility (Camco)

Investment-readiness training in French for distributed renewable energy companies in French-speaking Africa, with up to 15 companies per cohort.

Sector
Mini-grids, solar home systems and off-grid solar, productive use and appliances
Funding
Training and support, not cash
Who can apply
Companies and developers
Where
French-speaking countries in West, Central, East and Southern Africa
Status
The 2026 cohort ran from April to November 2026; ARE also runs English-language academies.
Project preparation and advice
Between rounds

ASCENT Project Preparation Facility: private sector window

COMESA with the World Bank, managed by Cygnum Capital

Technical assistance and grants that help distributed renewable energy and clean cooking companies get projects ready for investment, including environmental and social due diligence, carbon finance and productive use.

Sector
Mini-grids, solar home systems and off-grid solar, clean cooking and e-cooking, productive use and appliances
Funding
US$50,000 to 200,000; expert help is offered before grants where the roster has it
Who can apply
Companies and developers. At least three years operating; yearly revenue of at least US$250,000 (solar home systems) or US$150,000 (mini-grids, clean cooking, productive use)
Where
16 ASCENT countries (also Somalia and South Sudan)
Status
The first call closed 31 August 2026. Windows for public agencies and for industry associations and investors are planned.
Project preparation and adviceGrant or call for proposals
Between rounds

Beyond the Grid Fund for Africa (BGFA)

Nefco, the Nordic Green Bank, with REEEP

Competitive results-based financing that pays off-grid energy companies per connection, to close the viability gap for solar home systems, mini-grids and productive use in rural areas.

Sector
Solar home systems and off-grid solar, mini-grids, productive use and appliances
Funding
EUR 110 million program
Who can apply
Companies and developers
Where
Burkina Faso, DR Congo, Liberia, Mozambique, Uganda, Zambia
Status
Calls run country by country (five so far). No open call found on 19 November 2026.
Results-based financing
Between rounds

CCAC Challenge Programme: accelerating eCooking in Africa

Climate and Clean Air Coalition (CCAC)

Grants for projects that speed up electric cooking in Africa: access, affordability, infrastructure, and social and cultural acceptance. Companies can take part as partners but cannot receive the funds.

Sector
Clean cooking and e-cooking
Funding
Projects of up to about US$2 million, under 24 months
Who can apply
NGOs and community groups, governments and agencies. Non-profits, intergovernmental bodies and government entities only
Where
ODA-eligible countries in Africa
Status
The eCooking call closed 12 December 2025. CCAC runs new challenge calls most years; check its calls page.
Grant or call for proposals
Between rounds

CEI Africa

Stichting Clean Energy and Energy Inclusion for Africa, funded by KfW and SDC

Results-based grants and forgivable loans for green mini-grid developers, outcome-based grants for productive use equipment, and loans for off-grid companies through European crowdlending platforms.

Sector
Mini-grids, solar home systems and off-grid solar
Funding
Varies by window
Who can apply
Companies and developers
Where
Sub-Saharan Africa; results-based calls by country
Status
Results-based calls name their countries; the July 2025 call covered Benin, Kenya, Mali and Sierra Leone.
Results-based financingLoans and equity
Between rounds

CLASP Productive Use Financing Facility

CLASP

Support for distributors and financial institutions that offer customer financing for productive use appliances, such as solar water pumps and refrigerators.

Sector
Productive use and appliances
Funding
Set per window
Who can apply
Companies and developers
Where
Sub-Saharan Africa and other regions
Status
The 2026 window ran 30 January to 13 February 2026.
Results-based financingLoans and equity
Between rounds

ClimaFii Alliance

Climate and Finance Innovations Alliance

BFA Global and Accion, with Shell Foundation and the UK government (FCDO)

Venture building, grants and credit pilots for early-stage companies that bring clean energy, productive use equipment and electric mobility to microenterprises.

Sector
Productive use and appliances, e-mobility, solar home systems and off-grid solar
Funding
Up to US$85,000 per business in cash grants and in-kind support
Who can apply
Companies and developers
Where
Sub-Saharan Africa (and South Asia)
Status
The second cohort was selected in April 2026 (applications closed in January 2026).
Grant or call for proposalsProject preparation and advice
Between rounds

DECIM Fund

Digital and Energy Connectivity for Inclusion in Madagascar; follows the Off-Grid Market Development Fund (OMDF)

Government of Madagascar, with the World Bank; managed by BCP (Palladium)

Grants and results-based financing for mini-grids, solar home systems and digital connectivity in Madagascar.

Sector
Mini-grids, solar home systems and off-grid solar
Funding
Set per window
Who can apply
Companies and developers
Where
Madagascar
Status
The first grant was signed in August 2025, and the window for new mini-grids was later reopened. Check the fund for open windows.

Link: News report (Palladium, August 2025).

Grant or call for proposalsResults-based financing
Between rounds

develoPPP Ventures

German Federal Ministry for Economic Cooperation and Development (BMZ), run by GIZ and DEG

Funding and support for start-ups in selected countries that want to scale an innovative business with development impact; energy businesses are eligible.

Sector
Any clean energy
Funding
See the program page
Who can apply
Companies and developers
Where
Ghana, Kenya, Rwanda, South Africa, Tanzania
Status
The 2026 call ran 15 May to 30 June 2026.
Grant or call for proposals
Between rounds

Digital Energy Challenge

Agence française de développement (AFD), co-funded by the European Union

Yearly challenge for SMEs with digital solutions that widen energy access, integrate renewables or improve utility performance, tested with African energy operators. Winners get funding, a bootcamp and mentoring.

Sector
Any clean energy
Funding
Up to EUR 150,000 per start-up
Who can apply
Companies and developers. Fewer than 250 staff and under EUR 50 million turnover
Where
Eligible African countries
Status
2026 applications closed 17 June 2026; results due in autumn 2026.
Grant or call for proposals
Between rounds

EEP Africa calls for proposals

Energy and Environment Partnership Trust Fund, hosted by the Nordic Development Fund

Early-stage grant financing for innovative clean energy projects, technologies and business models in active development. Companies, start-ups and social enterprises can apply.

Sector
Any clean energy
Funding
EUR 200,000 to 500,000 as grants or repayable grants, with co-financing
Who can apply
Companies and developers
Where
17 countries in Southern and East Africa (also Mauritius)
Status
Calls usually open in February. The 2026 expression of interest closed 16 March 2026.
Grant or call for proposals
Between rounds

Energy Catalyst

Innovate UK

Innovation grants for clean energy access projects in ODA-eligible countries, from feasibility studies to late-stage development. Each project needs a UK-registered lead.

Sector
Any clean energy
Funding
Round 11: up to £7 million in total, for projects of £50,000 to £5 million
Who can apply
Companies and developers, researchers and innovators
Where
Sub-Saharan Africa, South Asia, the Indo-Pacific and Latin America
Status
Round 11 closed 25 March 2026.
Grant or call for proposals
Between rounds

Environmental Investment Fund of Namibia grants and green loans

Environmental Investment Fund of Namibia (EIF)

Grants for individuals, community groups, small businesses and non-profits working on renewable energy and other green projects, plus concessional green loans.

Sector
Any clean energy
Funding
Institutional grants from N$50,000; green loans up to N$2 million
Who can apply
Companies and developers, NGOs and community groups
Where
Namibia
Status
The 2026 grant calls closed in August 2026; green loans are assessed on application.
Grant or call for proposalsLoans and equity
Between rounds

Future of Energy Conference Innovation Challenge

Africa Centre for Energy Policy (ACEP) and Africa Change Lab, with UNDP's Timbuktoo initiative

Innovation challenge for young Africans with clean energy solutions, including clean cooking, circular economy and lithium-ion battery innovation; finalists pitch at the conference in Accra.

Sector
Any clean energy
Funding
Prize and support for finalists
Who can apply
Researchers and innovators, companies and developers. African nationals aged 15 to 35
Where
Africa
Status
2026 applications closed 31 May 2026; the finals were in Accra in August 2026.
Grant or call for proposals
Between rounds

LEAP-SE joint call for sustainable energy research

LEAP-SE consortium of African and European research funders, with the European Commission

Africa-EU call for collaborative research and innovation on sustainable energy, funding basic research, applied research and experimental development projects of 12 to 36 months.

Sector
Any clean energy
Funding
About EUR 16.5 million in total for the 2026 call
Who can apply
Researchers and innovators
Where
Countries of the participating funding agencies
Status
The 2026 call ran from November 2025 (pre-proposals 5 February 2026, full proposals June 2026).
Grant or call for proposals
Between rounds

Mitigation Action Facility

Formerly the NAMA Facility

Germany, the UK, Denmark and other donors

Grants for large climate mitigation projects in energy, industry and transport that help countries deliver their climate targets, combining technical and financial cooperation.

Sector
Any clean energy
Funding
€5 million to €25 million per project
Who can apply
Governments and agencies, NGOs and community groups. Partner countries or organizations acting on their behalf
Where
ODA-eligible countries worldwide
Status
The 2026 call closed 25 February 2026. A new call is usually launched each November at the UN climate conference.
Grant or call for proposals
Between rounds

Modern Cooking Facility for Africa (MCFA)

Nefco

Results-based financing for companies selling higher-tier clean cooking, such as electric, biogas and ethanol stoves, in Sub-Saharan Africa.

Sector
Clean cooking and e-cooking
Funding
€16 million in the second round
Who can apply
Companies and developers
Where
DR Congo, Kenya, Malawi, Mozambique, Tanzania, Zambia and Zimbabwe (rounds so far)
Status
The second round closed 31 January 2024; no new round found on 19 November 2026.
Results-based financing
Between rounds

Mwinda Fund

ANSER and the Ministry of Water Resources and Electricity, DR Congo

National fund for off-grid access in DR Congo. It gives grants for solar home systems, mini-grids and clean cooking, with GreenMax Capital Group managing the fund.

Sector
Solar home systems and off-grid solar, mini-grids, clean cooking and e-cooking
Funding
US$500 million target
Who can apply
Companies and developers
Where
DR Congo
Status
ANSER issued a first call for project proposals; check ANSER for the next call.

Link: News report (Green Building Africa); calls are published by ANSER.

Grant or call for proposalsResults-based financing
Between rounds

Ngwee Ngwee Ngwee Fund (Off-Grid Market Development Fund)

Ministry of Energy, Malawi, under ASCENT Malawi

Results-based grants and working-capital loans for companies selling solar home systems, and from 2026 clean cooking, in Malawi.

Sector
Solar home systems and off-grid solar, clean cooking and e-cooking
Funding
Varies by window
Who can apply
Companies and developers
Where
Malawi
Status
Requests for business plans went out in October 2025 (solar home systems) and March 2026 (clean cooking).
Results-based financingLoans and equity
Between rounds

Renewable Lesotho: Access to Affordable Renewable Energy (AARE)

UNDP, with the European Union and Ireland

Results-based finance for energy service providers that bring off-grid renewable energy to households, public services and productive users in Lesotho.

Sector
Solar home systems and off-grid solar, mini-grids
Funding
€3.7 million from the EU for AARE, plus Ireland and UNDP
Who can apply
Companies and developers
Where
Lesotho
Status
UNDP called for expressions of interest from energy service providers for year 3 in September 2026; watch UNGM for the next notice.
Results-based financing
Between rounds

SOGREA (Salone Off-Grid Renewable Energy Acceleration)

European Union and Denmark, run through the Universal Energy Facility with Sierra Leone's Ministry of Energy

Performance-based capital support for licensed, for-profit green mini-grid developers in Sierra Leone, paid against independently verified milestones. Pre-qualified companies submit site proposals, funded first come, first served.

Sector
Mini-grids
Funding
EUR 24 million program
Who can apply
Companies and developers
Where
Sierra Leone
Status
Pre-qualification closed in March 2026.
Results-based financing
Between rounds

Sustainable and Inclusive E-Mobility Catalyser

Siemens Stiftung, with GIZ

Awards and a growth program for e-mobility companies with validated products: electric two- and three-wheelers for transport entrepreneurs, second-life and end-of-life battery solutions, and local component production.

Sector
E-mobility, e-waste, recycling and second-life batteries
Funding
Award plus growth program
Who can apply
Companies and developers
Where
Kenya, Uganda
Status
The 2026 call closed 30 April 2026.
Grant or call for proposalsProject preparation and advice
Between rounds

Universal Energy Facility (UEF)

Sustainable Energy for All (SEforALL)

Multi-donor results-based fund that pays grants for verified electricity connections from mini-grids and stand-alone solar, and for clean cooking. It opens funding windows country by country; ZEDSI in Zambia and SOGREA in Sierra Leone run through it.

Sector
Mini-grids, solar home systems and off-grid solar, clean cooking and e-cooking
Funding
Incentives per verified connection; set for each window
Who can apply
Companies and developers
Where
Sub-Saharan Africa, one country window at a time
Status
Windows have run in Benin, DR Congo, Madagascar, Nigeria, Sierra Leone and Zambia. Watch SEforALL for new ones.
Results-based financing
Between rounds

Zambia Energy Demand Stimulation Incentive (ZEDSI)

SEforALL's Universal Energy Facility, with REA and The Rockefeller Foundation

Performance-based grants for mini-grid developers that grow electricity use by businesses and public institutions, such as mills, cold storage and irrigation pumps. Payments follow verified increases in consumption.

Sector
Mini-grids, productive use and appliances
Funding
First round: over US$1.1 million
Who can apply
Companies and developers
Where
Zambia
Status
Launched November 2024; the first agreements (over US$1.1 million to three developers for 43 mini-grids) were signed in June 2025. No open window found on 19 November 2026.
Results-based financing
Between rounds

Zayed Sustainability Prize (Energy category)

Zayed Sustainability Prize, United Arab Emirates

Global prize for small businesses and non-profits with clean energy and energy access solutions, alongside other categories.

Sector
Any clean energy
Funding
US$1 million per winner; US$100,000 per finalist
Who can apply
Companies and developers, NGOs and community groups
Where
Global, including Africa
Status
The 2027 cycle closed in June 2026; the next cycle is expected to open around January 2027.
Grant or call for proposals
No public call

Acumen Hardest-to-Reach (H2R)

Acumen Capital Partners

Impact-linked loans and receivables financing for established off-grid solar companies working in some of Sub-Saharan Africa's least electrified countries.

Sector
Solar home systems and off-grid solar
Funding
Sized per deal
Who can apply
Companies and developers
Where
About 16 low-access countries in Sub-Saharan Africa
Status
Lends deal by deal; contact Acumen.
Loans and equity
No public call

Africa Go Green Fund

Cygnum Capital

Climate debt fund for Africa. One of its models lends to carbon projects such as clean cooking and is repaid from future carbon revenue under a purchase agreement.

Sector
Renewable energy certificates and carbon credits, clean cooking and e-cooking
Funding
Sized per deal
Who can apply
Companies and developers
Where
Africa
Status
Lends deal by deal; contact Cygnum Capital.

Link: News report (LaunchBase Africa, July 2026).

Loans and equity
No public call

Arzikin Haské Fund

Government of Niger, under the World Bank-financed HASKÉ program

Results-based financing for companies that sell off-grid solar and clean cooking products in Niger.

Sector
Solar home systems and off-grid solar, clean cooking and e-cooking
Funding
Part of the US$317.5 million first phase of HASKÉ
Who can apply
Companies and developers
Where
Niger
Status
Presented at an ESMAP learning session in April 2026; contact the HASKÉ project unit about calls.
Results-based financing
No public call

ASCENT Regional Energy Access Financing Facility (REAF)

TDB Group and its Trade and Development Fund, with the World Bank

Loans for distributed renewable energy and clean cooking companies, plus results-based grants for verified off-grid solar and clean cooking sales in underserved and frontier markets.

Sector
Solar home systems and off-grid solar, clean cooking and e-cooking, mini-grids
Funding
Debt and results-based grants
Who can apply
Companies and developers
Where
ASCENT countries in Eastern and Southern Africa
Status
No public call found; companies approach TDB Group. Over US$50 million disbursed by April 2026.
Results-based financingLoans and equity
No public call

ASCENT Rwanda off-grid, clean cooking and productive use financing

Development Bank of Rwanda (BRD), with the World Bank and AIIB

Results-based financing for energy service companies selling solar home systems, clean cooking products and productive use equipment in 30 districts, with credit lines through participating banks and microfinance institutions.

Sector
Solar home systems and off-grid solar, clean cooking and e-cooking, productive use and appliances
Funding
US$27.5 million through BRD, within the US$400 million ASCENT Rwanda program
Who can apply
Companies and developers
Where
Rwanda
Status
BRD contracts companies under its productive use RBF operations manual (updated January 2026); contact BRD's ASCENT unit for the current window.

Link: News report (The New Times); the operations manual is published by BRD and REG.

Results-based financingLoans and equity
No public call

CIZO program

Togolese Agency for Rural Electrification and Renewable Energy (AT2ER)

Togo's national off-grid solar program. Partner companies sell solar home systems on pay-as-you-go, and the CIZO cheque pays part of each eligible household's monthly bill.

Sector
Solar home systems and off-grid solar
Funding
Monthly subsidy per household (2,000 CFA francs at launch)
Who can apply
Companies and developers
Where
Togo
Status
Companies take part through AT2ER tenders; contact AT2ER.
Results-based financing
No public call

Clean Cooking Alliance Venture Catalyst

Clean Cooking Alliance

Tailored support for clean cooking companies to become investment-ready and reach growth capital, from business planning to investor introductions.

Sector
Clean cooking and e-cooking
Funding
Support, not cash
Who can apply
Companies and developers
Where
Sub-Saharan Africa and other regions
Status
Companies are selected by the Alliance; contact it about joining. The portfolio had 29 companies in 19 countries.
Project preparation and advice
No public call

CrossBoundary Access

CrossBoundary

Builds and buys portfolios of mini-grids and other distributed renewable assets using long-term project finance, rather than investing in single developers.

Sector
Mini-grids
Funding
Project finance per portfolio
Who can apply
Companies and developers
Where
Sub-Saharan Africa
Status
Works through partnerships with developers; contact CrossBoundary.
Loans and equity
No public call

Desert to Power G5 Sahel Financing Facility

African Development Bank, with the Green Climate Fund

Blends concessional finance and technical help to bring private solar power producers and grid investments to five Sahel countries, as part of the wider Desert to Power initiative.

Sector
Grid-scale, commercial and industrial power, mini-grids
Funding
Up to US$379.6 million from the AfDB over seven years, plus US$150 million from the Green Climate Fund
Who can apply
Companies and developers, governments and agencies
Where
Burkina Faso, Chad, Mali, Mauritania, Niger
Status
Deals go through the African Development Bank and the countries' power sector bodies.
Loans and equityProject preparation and advice
No public call

EBID clean energy credit line

Ligne de crédit énergie propre de la BIDC

ECOWAS Bank for Investment and Development (EBID)

Long-term credit line that EBID deploys in new clean power projects in West Africa, mainly solar and hydropower, serving underserved people and businesses.

Sector
Grid-scale, commercial and industrial power, mini-grids
Funding
US$70 million credit line, expected to mobilize about US$230 million
Who can apply
Companies and developers
Where
ECOWAS countries
Status
Approved in June 2026; project sponsors approach EBID directly.

Link: News report in French (AllAfrica, June 2026).

Loans and equity
No public call

EDFI ElectriFI

EDFI Management Company, funded by the European Union and others

Invests early-stage debt and equity in private companies and projects that add electricity connections or sustainable generation in emerging markets, focused on rural and underserved areas.

Sector
Any clean energy
Funding
Debt or equity sized per deal
Who can apply
Companies and developers
Where
Emerging markets, mostly Sub-Saharan Africa
Status
Earlier rounds used calls for investment proposals; check the site for the current process.
Loans and equity
No public call

Facility for Energy Inclusion (FEI)

African Development Bank and partners

Debt platform for small-scale energy access. Its Off-Grid Energy Access Fund lends in local and hard currency to off-grid companies; FEI On-Grid lends long-term to small independent power producers, mini-grids and captive plants below 25 MW.

Sector
Solar home systems and off-grid solar, mini-grids, grid-scale, commercial and industrial power
Funding
Debt sized per deal
Who can apply
Companies and developers
Where
Sub-Saharan Africa
Status
Lends deal by deal; contact the fund managers.
Loans and equity
No public call

InfraCo Africa

Private Infrastructure Development Group (PIDG)

Co-develops and invests in early-stage infrastructure projects in Africa, including renewable energy and distributed power, alongside project sponsors.

Sector
Grid-scale, commercial and industrial power, mini-grids
Funding
Development capital sized per project
Who can apply
Companies and developers
Where
Sub-Saharan Africa
Status
Approach InfraCo Africa with a project.
Project preparation and adviceLoans and equity
No public call

KliK Foundation: Article 6 carbon purchases

KliK Foundation (Switzerland)

Buys emission reductions (ITMOs) under Article 6 of the Paris Agreement from activities in countries with a bilateral deal with Switzerland, including electric and improved cooking, biogas and e-mobility.

Sector
Renewable energy certificates and carbon credits, clean cooking and e-cooking, e-mobility
Funding
Set per purchase agreement
Who can apply
Companies and developers
Where
Ghana, Malawi, Senegal, Zambia
Status
Activities need authorization by both governments; KliK signs purchase agreements with activity owners. Contact KliK.
Results-based financing
No public call

LESSAP II results-based financing

Rural and Renewable Energy Agency (RREA), Liberia, with the World Bank

Results-based financing for off-grid companies installing solar home systems, stand-alone rooftop systems and isolated mini-grids in Liberia.

Sector
Solar home systems and off-grid solar, mini-grids
Funding
Part of the World Bank's LESSAP program
Who can apply
Companies and developers
Where
Liberia
Status
RREA runs the facility; earlier solar home system calls ran in 2023 and 2024 with EnDev and BRAC Liberia.

Link: News report (pv magazine, May 2025).

Results-based financing
No public call

Modern Energy Cooking Services (MECS) funding

MECS, with UK government funding

Grants and venture support for electric cooking businesses and research; calls are announced on its site.

Sector
Clean cooking and e-cooking
Funding
Grants of up to about US$50,000 for e-cooking ventures
Who can apply
Companies and developers, researchers and innovators
Where
Africa and Asia
Status
In May 2026 MECS and CLASP backed three African e-cooking companies (EcoBora, PowerUp and Sun-Power Box). Watch MECS for new calls.
Grant or call for proposals
No public call

Nigeria Distributed Renewable Energy (DRE) Fund

NSIA and Africa50, with SEforALL and the World Bank

Investment fund for mini-grids, stand-alone solar and other distributed renewable energy projects in Nigeria.

Sector
Mini-grids, solar home systems and off-grid solar
Funding
US$300 million target, with a US$25 million World Bank anchor
Who can apply
Companies and developers
Where
Nigeria
Status
Commercially launched 20 September 2026; contact the fund managers.
Loans and equity
No public call

Regional Off-Grid Electricity Access Project (ROGEAP)

ECOWAS and the West African Development Bank (BOAD), with the World Bank

Builds one regional market for stand-alone solar: business training and entrepreneurship support for solar SMEs, and credit lines for solar companies through commercial banks.

Sector
Solar home systems and off-grid solar
Funding
Grants of US$15,000 to US$250,000 in the latest call; credit lines vary
Who can apply
Companies and developers
Where
19 countries in West Africa and the Sahel
Status
The fifth grant call (grants of US$15,000 to US$250,000) closed 30 May 2026, and the business plan competition closed in March 2026. Follow ECOWAS for new calls.
Grant or call for proposalsProject preparation and adviceLoans and equity
No public call

Renewable Energy Fund Zimbabwe (ZimREF)

Old Mutual Renewable Energy Fund

Old Mutual Investment Group, with UNCDF and the UN Joint SDG Fund

Blended finance for small and early-stage renewable energy projects in Zimbabwe: concessional loans, blended equity and debt, and lease-to-own structures, plus enterprise incubation.

Sector
Grid-scale, commercial and industrial power, mini-grids
Funding
US$16 million to start, aiming for US$100 million
Who can apply
Companies and developers
Where
Zimbabwe
Status
Invests deal by deal; contact Old Mutual Investment Group Zimbabwe.
Loans and equity
No public call

Renewable Energy Performance Platform 2 (REPP 2)

Camco

Debt fund for small-scale renewable energy projects and companies, such as commercial and industrial solar, with support for developers on environmental, social and financial structuring.

Sector
Grid-scale, commercial and industrial power, mini-grids
Funding
Senior debt sized per deal
Who can apply
Companies and developers
Where
Cameroon, DR Congo, Lesotho, Madagascar, Malawi, Niger, Nigeria, Sierra Leone and Zambia
Status
Lends deal by deal; contact Camco. The first REPP closed to new investments in 2023.
Loans and equity
No public call

Rwanda e-mobility financing

Rwanda Green Fund and the Development Bank of Rwanda (BRD), with the Mitigation Action Facility

Two financing windows that make electric motorcycles easier to supply and buy in Rwanda, through lenders and businesses in the e-moto market.

Sector
E-mobility
Funding
Expected to mobilize €40 million by end-2026
Who can apply
Companies and developers
Where
Rwanda
Status
Contact the Rwanda Green Fund or BRD.
Loans and equity
No public call

SOLEER: large-scale solar and rural electrification project

Projet de déploiement du solaire à large échelle et d'électrification rurale

Government of Burkina Faso, with the World Bank

Mobilizes private investment in rural electrification in Burkina Faso, including support for private operators that build solar mini-grids with storage and distribute solar kits.

Sector
Mini-grids, solar home systems and off-grid solar
Funding
US$168.7 million project
Who can apply
Companies and developers
Where
Burkina Faso
Status
Reviewed at mid-term in March 2026; private operators are selected through the project's calls. Contact the project unit.

Link: World Bank mid-term review aide-memoire (March 2026).

Results-based financingGrant or call for proposals
No public call

Spark+ Africa Fund

Enabling Qapital and Stichting Modern Cooking, with the African Development Bank (SEFA) as anchor investor

Impact debt fund for clean cooking in Sub-Saharan Africa. It lends to manufacturers, distributors, fuel businesses and microfinance lenders across the clean cooking value chain, including electric cooking.

Sector
Clean cooking and e-cooking
Funding
About US$64 million under management; senior debt, mezzanine and some equity
Who can apply
Companies and developers
Where
Sub-Saharan Africa
Status
Invests deal by deal; contact the fund manager, Enabling Qapital.

Link: Press release (Spark+ GP, via NextBillion).

Loans and equity
No public call

Swedish Energy Agency: Article 6 cooperation

Swedish Energy Agency

Buys emission reductions under Article 6 of the Paris Agreement through government-to-government agreements; Kenya is its first African partner, with projects to follow.

Sector
Renewable energy certificates and carbon credits
Funding
Set per purchase agreement
Who can apply
Companies and developers, governments and agencies
Where
Kenya
Status
The agreement with Kenya was signed in 2025; the next step is selecting emission reduction projects.
Results-based financing
No public call

USTDA feasibility studies and technical assistance

US Trade and Development Agency

Grants for feasibility studies, pilot projects and technical assistance on infrastructure projects, including energy, that could use US goods and services.

Sector
Grid-scale, commercial and industrial power
Funding
Set per project
Who can apply
Companies and developers, governments and agencies
Where
Sub-Saharan Africa and other regions
Status
Project sponsors approach USTDA directly.
Project preparation and advice
No public call

Yeleen Rural Electrification Project

Government of Burkina Faso, with the African Development Bank and the Green Climate Fund

Supports solar mini-grids in rural Burkina Faso, including results-based capital grants for private operators of about 100 mini-grids.

Sector
Mini-grids
Funding
See the GCF project page
Who can apply
Companies and developers
Where
Burkina Faso
Status
Calls are run through the national program; contact the rural electrification agency.
Results-based financing
No public call

Zafiri

Inspired Evolution (manager); founded under Mission 300 by IFC and the African Development Bank

Long-term equity for distributed renewable energy companies in Sub-Saharan Africa, including mini-grids, solar home systems, productive use and clean cooking.

Sector
Mini-grids, solar home systems and off-grid solar, productive use and appliances, clean cooking and e-cooking
Funding
US$176 million committed, target US$1 billion
Who can apply
Companies and developers
Where
Sub-Saharan Africa
Status
Commercially launched in June 2026; contact Inspired Evolution.
Loans and equity
Closed

Education Cannot Wait: clean cooking and carbon finance pilot in schools

Education Cannot Wait

Request for proposals for a partner to design and run a two-year pilot of clean cooking in Ethiopian schools that generates high-quality carbon credits, with a monitoring, reporting and verification system.

Sector
Clean cooking and e-cooking, renewable energy certificates and carbon credits
Funding
Set in the request for proposals
Who can apply
Companies and developers, NGOs and community groups
Where
Ethiopia
Status
Request for proposals issued in August 2026 (questions were due 21 August 2026). ECW may scale the pilot to more schools.

Link: Listing of the request for proposals (Opportunities for Youth, August 2026).

Grant or call for proposals
Closed

Increased Access to Electricity and Renewable Energy Production (IAEREP)

Often written IAREP

European Union, through Zambia's National Authorising Office

EU-funded program for renewable energy and energy efficiency in Zambia. Its calls for proposals gave seed grants to business models that bring energy services to rural areas, alongside support for laws and regulations and for capacity building.

Sector
Grid-scale, commercial and industrial power, mini-grids
Funding
Seed grants; see the call guidelines
Who can apply
Companies and developers, NGOs and community groups. Lead applicants established in an EU member state or a country eligible under the 11th European Development Fund
Where
Zambia
Status
Concept notes for the last call were due 2 May 2024. No new call found on 19 November 2026.
Grant or call for proposals
Closed

Milken-Motsepe Prize in Circular Economy

Milken Institute and the Motsepe Foundation

Prize competition for technology-enabled circular economy companies operating in Africa, such as recycling, reuse and e-waste businesses.

Sector
E-waste, recycling and second-life batteries
Funding
US$2 million in total prizes
Who can apply
Companies and developers
Where
Africa
Status
Applications closed 13 August 2026.
Grant or call for proposals
Closed

SWITCH to Circular Economy in East and Southern Africa (SWITCH-2-CE)

European Union, implemented by Expertise France

Grants and technical assistance for circular economy start-ups and small businesses in plastic packaging and e-waste, delivered through entrepreneurial support organizations.

Sector
E-waste, recycling and second-life batteries
Funding
€10,000 to €150,000 per business, through support organizations
Who can apply
NGOs and community groups, companies and developers
Where
East and Southern Africa
Status
The call for support organizations closed 16 March 2026; the selected organizations then run their own calls for businesses.
Grant or call for proposalsProject preparation and advice
Closed

Universal Access Clusters pilot, Zambia

Global Energy Alliance for People and Planet (GEAPP) and SEforALL, with REA and The Rockefeller Foundation

Pilot to electrify every household and business in a defined area of 1,000 to 10,000 households, with any mix of mini-grids and solar home systems. Capital costs split 50% grant and 50% developer equity, with a five-year operating subsidy.

Sector
Mini-grids, solar home systems and off-grid solar
Funding
50% capital grant plus an operating subsidy
Who can apply
Companies and developers
Where
Zambia
Status
Expressions of interest closed 24 July 2026; up to two developers were to be shortlisted.
Grant or call for proposals
Ended

Power Africa

US government, under USAID

US initiative that supported new power generation and electricity connections across Sub-Saharan Africa from 2013.

Sector
Any clean energy
Funding
None available
Who can apply
Companies and developers, governments and agencies
Where
Sub-Saharan Africa
Status
Ended in February 2025 with the closure of USAID. Listed so that people looking for it know.

Link: News report (Africanews, February 2025).

Grant or call for proposalsProject preparation and advice

Every program was checked against its own page or a recent report on 19 November 2026. We scan for new calls every week and re-check the whole list every month, but deadlines and rules change: always confirm on the funder's page before you apply. Listing a program is not an endorsement, nobody pays to be listed, and we have no ties to any of them. Know one we missed, or see a line that is out of date? Email us.

Before you apply

What most of these programs ask for

The badges show where each program stands: open now, open any time, opening soon, between rounds, closed or ended. "No public call" means the fund lends or invests deal by deal, so you contact it directly.

  • A registered organization. Most calls fund registered companies, and many ask for years of operation and a minimum revenue. Programs for NGOs and community groups are fewer: filter by "NGOs and community groups".
  • Your own share. Co-financing or matching funds are common, often from 30% up to an equal share.
  • Cash to start. Results-based financing pays after results are verified, so the work has to be financed first.
  • Never pay to apply. Real funders do not charge application fees. Anyone asking for payment to get you funded is not part of the program.
  • Check the date. Calls open and close fast. Confirm the deadline and the rules on the funder's own page.
Kept current

What changed

Our maps are checked against public sources every month; each atlas page has its own "What changed" list. We open every link in the directory of other tools four times a year, update the descriptions and add new tools. Last full check: 10 November 2026. The funding list is checked every month; last check: 19 November 2026.

  • 19 November 2026 - Funding tab added: 87 grant, results-based financing, project preparation and finance programs, each checked against its own page or a recent report.
  • 19 November 2026 - Sector filter added (e-cooking, mini-grids, solar home systems, productive use, e-mobility, second life, certificates and carbon, grid), plus 17 programs for e-cooking, renewable energy certificates, carbon finance and e-mobility.
  • 19 November 2026 - French-language search: 7 programs for French-speaking Africa, including SOLEER (Burkina Faso), Benin's FERER, ADER calls in Madagascar, SUNREF, the EBID clean energy credit line, the ARE Francophone Investment Academy and ClimaFii.
  • 18 November 2026 - Research and Resources became this Tools page: our own tools grouped by task, with a filter for who you are, and the directory of other open tools as a second tab. Reports moved to their own menu item.
  • 10 November 2026 - First edition: 37 tools, each opened and read. Suggest one by email.
Questions

Common questions

Where can I find a map of the Southern African power grid?

The SAPP grid atlas maps the Southern African Power Pool grid across 12 countries: transmission lines, substations, power plants, the project pipeline and the draft master plan to 2045.

Is there a map of the East African power grid?

Yes. The EAPP grid atlas covers Ethiopia, Kenya, Uganda, Rwanda, Burundi, Tanzania and DR Congo.

Is there a map of Madagascar's power grid?

Yes. The Madagascar grid atlas maps the three JIRAMA grids, power plants and the transmission pipeline.

Are the maps free?

Yes, all of them are free to view and updated monthly. The tables we compiled are free CSV downloads on the open data page, and the geospatial layers behind the maps are available on request by email to [email protected].

How should I cite a map?

Aloe Energy, followed by the atlas name, the web address of its page and the date you viewed it. For example: Aloe Energy, SAPP grid atlas, aloeenergy.org/research/sapp-grid.

Where can I find open energy data for Africa?

Start with energydata.info for World Bank datasets and tools, Open Infrastructure Map for the grid, Global Energy Monitor for power plants, Ember for generation and emissions, and Tracking SDG 7 for access figures. The directory in the Across the industry tab lists 31 tools and maps you can filter by topic.

Which tool should I use to plan electrification for a country?

For a least-cost plan, the Global Electrification Platform and the Energy Access Explorer are built for that. For settlement-level screening, the Distributed Renewable Energy Atlas. For a quick, comparable picture of how many unlit people sit close to existing lines, our grid-edge atlas and country pages.

Is there an open map of Africa's power grid?

Yes, several. Open Infrastructure Map shows everything mapped in OpenStreetMap, Gridfinder predicts distribution lines from night lights, and the Clean Energy Access Tool covers Sub-Saharan Africa. Our grid atlases add planned lines and their dates for Eastern and Southern Africa.

What gets a tool listed in the directory?

It is free to use, covers many countries, is about energy in Africa or includes Africa, and we were able to open and read it. We do not list single-utility or single-country sites, and nobody can pay to be listed.

Where can I find grants for energy projects in Africa?

The Funding tab lists 87 programs you can filter by country, type of funding, status and who can apply. Examples: EEP Africa for early-stage clean energy in Southern and East Africa, the Universal Energy Facility and its country windows such as ZEDSI in Zambia, ASCENT programs in Eastern and Southern Africa, and GEF and IKI small grants for NGOs and community groups.

Does Aloe Energy give grants?

No. We do not fund projects, and listing a program is not an endorsement. We gather them in one place so they are easier to find; always confirm the details with the funder.

How do I suggest a tool or a correction?

Email [email protected] with the link. We open it, check it and add it at the next update.

Spotted an error, or something missing on this page? Report an issue or send feedback