West African Power Pool - distribution network
Nigeria distribution network map
Few medium-voltage lines in Nigeria are in public data, so most lines here are predicted (dashed): they follow major roads where night-time lights suggest a line, joined to the nearest substation. Mapped lines are solid. Together they give a first picture of where the distribution network runs.
Click a line, substation or plant for details. Click the map to zoom with the scroll wheel. Lines are indicative, not for engineering or investment decisions.
Lines by voltage and source
Public data on Nigeria's medium-voltage network is scarce, so most of this map is predicted rather than mapped. If the utility publishes its network, those lines would replace the predicted ones. Nigeria's Mission 300 energy compact reports about 12,300 km of medium-voltage lines (page 23). Public maps show about 83% of that length; the rest is not in open data yet. There is no public low-voltage data for Nigeria, so the map shows medium voltage only.
Each line keeps its source. Where two sources map the same line, we keep one, in this order: utility data, the World Bank 2017 map, OpenStreetMap, then predicted lines.
| Voltage | km |
|---|---|
| 30 to 33 kV | 6,994 |
| 11 kV and below | 2,935 |
| Medium voltage, not recorded | 263 |
| Predicted along roads | 60,949 |
| Total | 71,141 |
| Source | km | Share |
|---|---|---|
| World Bank Africa electricity grid (2017) | 9,915 | 14% |
| OpenStreetMap (newer lines not in the 2017 map) | 277 | 0% |
| Predicted along roads (night-time lights, roads and substations) | 60,949 | 86% |
| Total | 71,141 | 100% |
How we built this map
- We start from the World Bank Africa electricity grid (2017), the most complete public medium-voltage map for many countries, and add OpenStreetMap lines below 40 kV and power=minor_line, each only where it runs more than 250 m from a line already on the map.
- Predicted lines follow major roads (motorway to tertiary, from OpenStreetMap), because rural feeders mostly run along roads. A road section is predicted to carry a line where gridfinder (Arderne et al. 2020), a model built on night-time lights, predicts one running along it and no mapped line already explains it. Predicted sections are then joined to the nearest substation or mapped line along the roads, so they form connected feeders, and short gaps along the same road are closed. Smaller (unclassified) roads are used only to reach villages and towns in OpenStreetMap that sit within 1.5 km of a night-time-light prediction. They may be lines that exist but are not mapped, lines at another voltage, or no line at all. We tested the model on Kenya with Kenya Power's own map left out: 85% of the predicted line length lay within 1 km of a real Kenya Power line, and mapped plus predicted lines reached 54% of the real network, against 6% for mapped lines alone.
- OpenStreetMap power lines with no voltage tag are shown as medium voltage with the voltage not recorded, unless they run along a known high-voltage line or link two parts of the high-voltage network over a long distance. A few may still be high-voltage lines.
- The 2017 map does not show lines built since then, and OpenStreetMap coverage depends on volunteers. Low-voltage networks are rarely public.
- Transmission lines (40 kV and above) are left out of this map; see the grid-edge atlas for the wider grid. World Bank lines with no recorded voltage are left out, since some are transmission.
- Geometry is simplified to about 60 m for the web. Lengths are measured before simplifying.
Sources
- Medium-voltage lines: World Bank Group, Africa electricity grids (2017), via energydata.info (CC BY 4.0).
- Lines, substations and small plants: OpenStreetMap contributors (ODbL), downloaded 12 November 2026.
- Predicted lines: our road-based model, using gridfinder (Arderne, Zorn, Nicolas and Koks 2020, Predictive mapping of the global power system using open data, Scientific Data, CC BY 4.0), OpenStreetMap roads and settlements (ODbL) and the substations on this map.
- Reported MV length: Nigeria's Mission 300 national energy compact, page 23.
The map is free to view. The data is available on request: email [email protected] and tell us what you need it for. Last built 12 November 2026.