Blog

Southern Africa's grid emission factors were out of date, so we made open ones

How much CO2 comes with a unit of electricity sounds like a number someone keeps up to date. In Southern Africa, nobody did. The official regional factors expired in 2021, and the default set most people use dates from 2019.

Bar chart of grid emission factors for the 12 Southern African Power Pool countries in 2024, generated in country and counting imports
Average grid emission factors, 2024, tCO2/MWh. Aloe Energy, from Ember yearly electricity data (CC BY 4.0), regulator reports and IPCC default factors.

A grid emission factor decides how much carbon a solar farm, a mini-grid or an efficiency project is credited with avoiding. It also sets how companies report the emissions from the power they buy. Old numbers lead to real decisions: the 2019 defaults give the DR Congo, Eswatini, Lesotho and Malawi the same value, the one also used for Iceland and Nepal. Their grids are nothing alike.

So we calculated open factors for all 12 Southern African Power Pool countries, each with its method and a data-quality flag, and we update them when new data comes out.

Two very different grids

South Africa, Botswana and Zimbabwe run mostly on coal, at about 0.4 to 1.0 tonnes of CO2 per megawatt-hour. South Africa, the region's largest grid, sits at 0.82. The DR Congo, Malawi, Mozambique, Zambia and Angola run mostly on hydro, well below 0.2.

Then there are the importers. Eswatini, Lesotho and Namibia buy much of their power from their neighbors. Counted on what they generate at home, their factors are close to zero. Counted on what they actually use, imports included, they rise ten to twenty times: Namibia goes from 0.02 to 0.45. Which number is right depends on the question, so we show both.

Public data is thin

International datasets get some countries badly wrong. For Zambia, US data overstated 2024 hydropower by about 60% in a drought year, so we used the Energy Regulation Board's plant figures instead. For Lesotho, the international data shows no generation at all, although 'Muela hydro runs. Each of these is flagged on the page, and each country gets a data-quality rating.

The UN's new rules

In February 2026 the Paris Agreement's crediting mechanism adopted a new electricity tool for carbon projects, revised in October. A new wind or solar project can either calculate a combined margin, now weighted 25/75 or 75/25, or skip the calculation and use a default of 0.2, 0.1 or 0.03 tCO2/MWh.

In South Africa, that default is 73% lower than the calculated factor. A project that takes the shortcut gives up most of its credits. Doing the calculation with good grid data pays. In the hydro countries, both routes come out close to zero.

For company reporting

Companies that buy renewable energy certificates report a market-based figure, which needs a residual mix: the grid with the certified clean power taken out. Nobody publishes one for Southern Africa, so we estimate it, and the page has a small calculator. In 2024 it only moves South Africa, from 0.82 to 0.83. From 2025 it will matter in Zimbabwe too, where Kariba issued certificates for about a sixth of the country's power.

What it is not

These are indicative factors, not a registered or certified baseline, and not carbon market or legal advice. For a project baseline, check the rules of the standard you use. If you need a factor built for a specific project or company, that is the kind of study we do.

See the factors

Every country, three ways: generated in country, counting imports, and the combined margin carbon developers use. The data is available on request: email [email protected].

Open the grid emission factors

Get the monthly update

One short email a month: what changed in our grid atlases, our new research and new open data. Free, like everything we publish.

One email a month. You confirm by email and can unsubscribe at any time. What you get · Privacy. Protected by reCAPTCHA (Google Privacy and Terms).

← All posts · More: the SAPP grid atlas