Grows where the grid hasn’t.
The SAPP grid atlas
One map of the Southern African Power Pool: the high-voltage grid as it stands today, every power plant of 10 MW and above, the lines and plants in the pipeline, and the master plan to 2045. Slide back to 2004 to watch the region build, or forward to see what is promised.
Print the map
Two A0 posters of the SAPP grid, free to download: the grid and power plants today, and everything planned to 2035 and beyond, with the draft master plan.
Free to print and share for non-commercial use with credit to Aloe Energy, unchanged (CC BY-NC-ND 4.0). A0 (841 x 1189 mm); prints well at A1 too.
Promises, and what got built
For every line and plant in the pipeline, the atlas keeps each date that was promised, who promised it and where. That turns a static map into a record of delivery.
- Mphanda Nkuwa in Mozambique has slipped six years, from 2028 in the 2017 regional plan to 2034 today.
- Tanzania's Julius Nyerere hydro arrived 13 years ahead of the 2017 plan, which still penciled it in for 2039.
- Angola and Tanzania are still not connected to the regional grid.
Where power cannot flow
The atlas maps SAPP's own limits on 29 interconnections, showing how much of each line's rating can actually be used, and flags the places where the grid is the constraint: no spare capacity in parts of the Cape, about 1,000 MW between Mozambique and South Africa, single links that a whole country depends on, and the drought risk on the Zambezi.
Our policy brief Wires are not the limit sets out what these limits mean: the 25 cross-border links can use about two thirds of their rating, and stability, not wire size, sets the limit on 24 of them. See every link on one interconnector limits map.
For mini-grids and local generation, these are the places where power close to demand is worth the most.
Sources and updates
Sources
Grid lines, substations and some plants from OpenStreetMap, with gaps filled from TANESCO (2015) and World Bank (2017) maps. Plants from Global Energy Monitor's Global Integrated Power Tracker (September 2026, CC BY 4.0), our own project register, and the WRI database, OpenStreetMap and World Bank AICD where GEM has nothing. Plans, limits and statistics from SAPP annual and monthly reports, the draft SAPP Generation and Transmission Master Plan 2025-2045, NTCSA and IRENA. Line colors follow SAPP's own grid map.
When SAPP publishes its final master plan, expected in December 2026, it will replace the draft on the map.
The data
The project register, with every promised date, and the power plant list are free CSV downloads on the open data page (CC BY 4.0). Lines and substations are available on request: email [email protected].
How it is built, which sources stand behind each feature and what is missing: method and sources.
Routes are indicative, and the map is not for engineering or investment decisions. A printable A1 poster edition is coming soon. Email [email protected] to hear when it is out, or to send a correction.
What changed 7 updates
Every month we check SAPP's reports, utilities, funders and project news for new lines, plants and dates, and update the map. Each change keeps its source.
- 16 November 2026 - Monthly check. The Mozambique-Malawi interconnector was energized on 8 August 2026; it stays in commissioning until a tariff deal lets commercial trading start. Source. The Tanzania section of the Tanzania-Zambia interconnector is 92% complete and now due in December 2026, seven months after its May 2026 target. Source. Angola-Namibia (ANNA): implementation agreement signed in April 2026 added to the project history.
- 13 November 2026 - Every line, substation, plant and project now lists the sources that show it. Click any feature to see them, or switch "Color lines by" to "Number of sources" to see where two or more sources agree. A new method page sets out the sources, steps, limits and known gaps, and the project register and plant list are now free CSV downloads.
- 11 November 2026 - Two free A0 posters: the SAPP grid today, and to 2035 and beyond. Download them from this page or from Publications.
- 9 November 2026 - Substation popups now show transformer capacity (MVA) where utilities publish it: 135 Eskom substations in South Africa from the Generation Connection Capacity Assessment 2025, and six ZESCO substations in Zambia from a JICA study (2006 data). Each popup lists the transformers and links to the source.
- 8 November 2026 - Power plants now come first from Global Energy Monitor's Global Integrated Power Tracker (September 2026): 434 operating plants and 465 in the pipeline, up from 399 in all. A fix to how we remove duplicates brings back Medupi (4,764 MW) and others. We also checked our grid against Open Infrastructure Map: totals agree within about 10% for most countries.
- 8 November 2026 - New voltage slider (66 to 765 kV). Substations are now sized by voltage, and their popups show the lines that end there, the nearest town and links to OpenStreetMap. A new "Source and age" view colors each line by where it comes from, and optional streets or terrain backgrounds help you find your way.
- 7 November 2026 - First edition published: the grid, 399 plants, the project pipeline, the draft master plan to 2045 and a search with 2,527 towns. Monthly checks start on 15 November.
Common questions
Where can I find a map of the SAPP grid?
Right here. The SAPP grid atlas is a free interactive map of the Southern African Power Pool transmission grid. It shows high-voltage lines from 66 to 765 kV, substations, every power plant of 10 MW and above, and the lines and plants in the pipeline. Open it full screen.
Which countries are in the Southern African Power Pool?
SAPP has 12 member countries: Angola, Botswana, DR Congo, Eswatini, Lesotho, Malawi, Mozambique, Namibia, South Africa, Tanzania, Zambia and Zimbabwe. The atlas covers all of them. Angola and Tanzania are not yet connected to the regional grid.
What can I do with the map?
Slide the timeline from 2004 to 2045 to see the grid being built and what is promised next. Filter lines by voltage, search for 2,527 towns, power plants, substations and projects, and view SAPP's own limits on 29 interconnections. Each line and plant keeps its source.
Does it include the SAPP master plan?
Yes. It shows the draft SAPP Generation and Transmission Master Plan 2025-2045, which expects regional peak demand of 84.7 GW by 2045. When SAPP publishes the final plan, expected in December 2026, it will replace the draft on the map.
Where does the data come from?
Public sources only: OpenStreetMap, TANESCO (2015) and World Bank (2017) grid maps, Global Energy Monitor's Global Integrated Power Tracker and the WRI Global Power Plant Database, SAPP annual and monthly reports, NTCSA, IRENA and public project announcements.
Can I download the data?
Partly. The project register and the power plant list, each with its sources, are free CSV downloads on the open data page. Lines and substations are available on request: email [email protected].
How reliable is each line on the map?
Every feature lists the public sources that show it, in its popup. About seven in ten line kilometers are shown by two or more sources, such as OpenStreetMap and the World Bank grid map. The method page gives the rules and the counts by country.
How often is it updated?
Every month. Each change is listed in the changelog on this page with its source.
Can I use it for engineering or investment decisions?
No. Routes are indicative and the atlas is a screening and learning tool. For detailed work, see our studies.