Mauritius

Indian Ocean islands - distribution network

Mauritius distribution network - mostly predicted

Data quality: mostly predicted - Only 0% of the line length here comes from public maps; 100% is predicted by our model, so read this as a likely picture, not a map of real lines.

Few medium-voltage lines in Mauritius are in public data, so most lines here are predicted (dotted): they follow major roads where night-time lights suggest a line, joined to the nearest substation. Mapped lines are solid. Predicted lines fade with distance from the mapped network, and those more than 30 km out are hidden at first, because in our tests they were mostly wrong.

5km of mapped medium-voltage lines, 11 to 33 kV
1,736km more predicted along roads within 30 km of a mapped line, substation or plant
100%of the network on this map is predicted, not mapped
9substations in public data

Click a line, substation or plant for details. Click the map to zoom with the scroll wheel. Lines are indicative, not for engineering or investment decisions.

What the map shows

Lines by voltage and source

Public data on Mauritius' medium-voltage network is scarce, so most of this map is predicted rather than mapped. If the utility publishes its network, those lines would replace the predicted ones. There is no public low-voltage data for Mauritius, so the map shows medium voltage only.

Each line keeps its source. Where two sources map the same line, we keep one, in this order: utility data, the World Bank 2017 map, OpenStreetMap, then predicted lines.

Line length by voltage
Voltagekm
Medium voltage, not recorded5
Predicted along roads1,736
Total1,741

Line length by source
SourcekmShare
OpenStreetMap (newer lines not in the 2017 map)50%
Predicted along roads (night-time lights, roads and substations)1,736100%
Total1,741100%
Method and caveats

How we built this map

  • We start from the World Bank Africa electricity grid (2017), the most complete public medium-voltage map for many countries, and add OpenStreetMap lines below 40 kV and power=minor_line, each only where it runs more than 250 m from a line already on the map.
  • Predicted lines follow major roads (motorway to tertiary, from OpenStreetMap), because rural feeders mostly run along roads. A road section is predicted to carry a line where satellites see electric light along it at night (VIIRS, lit in at least two of 2022-2024), because gridfinder has no lines on the islands, and no mapped line already explains it. Predicted sections are then joined to the nearest substation or mapped line along the roads, so they form connected feeders, and short gaps along the same road are closed. Smaller (unclassified) roads are used only to reach villages and towns in OpenStreetMap that sit within 1.5 km of a lit area. They may be lines that exist but are not mapped, lines at another voltage, or no line at all. We tested the model in seven countries where the real network is public (Eswatini, Kenya, Zambia, Uganda, Namibia, Mauritania and Liberia), each time hiding that network first. The share of predicted line length within 1 km of a real line ranged from 87% in Eswatini and 86% in Kenya to 18% in Namibia and 7% in Liberia; a line drawn along every road away from mapped lines scored 82% and 59% in the first two and 13% and 9% in the last two, so the model helps most where the grid is sparse but is far from certain anywhere. Distance matters most: predicted lines within 15 km of a mapped line, substation or power plant were real about 70% of the time, 55% at 15 to 30 km and 25% beyond 30 km. That is why the map shades predicted lines by distance and hides those beyond 30 km at first. Lights from gas flares, mines and known mini-grids barely changed the results, so they are not treated separately yet.
  • The 2017 map does not show lines built since then, and OpenStreetMap coverage depends on volunteers. Low-voltage networks are rarely public.
  • This map stops below 40 kV. Lines of 66 kV and above are on the Madagascar and Indian Ocean grid atlas; lines from 40 to 65 kV (sub-transmission, such as 44, 45 or 63 kV) are not on either map yet. World Bank lines with no recorded voltage are left out, since some are transmission.
  • Geometry is simplified to about 30 m for the web. Lengths are measured before simplifying.

Sources

  • Lines, substations and small plants: OpenStreetMap contributors (ODbL), downloaded 22 November 2026.
  • Predicted lines: our road-based model, using VIIRS annual night-time lights 2022-2024 (Earth Observation Group, via OpenGeoHub on Zenodo, CC BY 4.0) in place of gridfinder, which has no lines on the islands, OpenStreetMap roads and settlements (ODbL) and the substations on this map.
  • Power plants of 10 MW and above: our Madagascar and Indian Ocean grid atlas (Global Energy Monitor, CC BY 4.0, and curated public sources).

The map is free to view. The data is available on request: email [email protected] and tell us what you need it for. Last built 22 November 2026.