Country data

Indian Ocean island state

Mauritius electricity grid and access

This page brings together what our open atlases show for Mauritius: about 154 km of high-voltage lines, 1,078 MW of power plants and the projects still to come.

154km of high-voltage lines, 66 kV and above
1,078MW of operating power plants, 10 MW and above
7power plants and transmission lines planned or under construction
The grid today

Lines, substations and demand

Mauritius' mapped high-voltage network runs to about 154 km of lines at 66 kV and above, with 2 substations. The highest voltage on the map is 66 kV. Installed capacity was about 970 MW (2024), and peak demand about 568 MW (6 Feb 2025 (record)). The latest international tracking report puts access to electricity at 100% of people.

Mapped line length
Voltagekm
66 kV151
Voltage not recorded3
Total154
Generation and pipeline

Power plants and projects

There are 31 operating power plants of 10 MW and above, adding up to about 1,078 MW, 36% of it oil. The largest is Fort George power station (147 MW, oil). Another 7 plants totaling about 340 MW are under construction or planned. Most of the pipeline is solar.

Power plants of 10 MW and above
TypeOperating MWPipeline MW
Hydro40
Coal195
Gas109
Oil388
Solar192240
Wind39100
Biomass54
Other60
Total1,078340
Topics

More about Mauritius

Open any topic for the full text and tables.

Waste to Wealth

Second life for solar and batteries

Between 2026 and 2040, about 2,900 tonnes of solar equipment and stationary batteries are expected to retire in Mauritius, most of it solar panels.

Between 2026 and 2040, about 2,900 tonnes of solar equipment and stationary batteries are expected to retire in Mauritius, most of it solar panels. That is 0.6% of the total for the 49 countries in our second-life atlas. Up to 32 MWh of retired batteries could be tested and reused as storage, for example in solar home systems, shops and mini-grids (0.7% of the atlas total). Eastern Africa has e-waste collection and dismantling, in Kenya and Rwanda, but no recycler for panels or lithium batteries yet, so this waste would have to travel to South Africa, mostly by sea to Durban.

Solar and batteries retiring, 2026-2040 (tonnes)
StreamTonnesShare of country
Solar panels2,42983%
Batteries49217%
Total2,921100%
Mauritius compared with the 49 countries in our second-life atlas, 2026-2040
MauritiusAtlas totalShare
Retiring solar and batteries (tonnes)2,921507,0910.6%
Reusable battery storage (MWh)324,6640.7%
Retiring in 2030 (tonnes)61
Retiring in 2035 (tonnes)177
Retiring in 2040 (tonnes)401

From our second-life atlas, central case, by country. Electric vehicle batteries are modeled for the region as a whole, so they are not in these country figures.

Emissions

Grid emission factor

Each megawatt-hour generated in Mauritius in 2024 came with about 0.71 tonnes of CO2.

Each megawatt-hour generated in Mauritius in 2024 came with about 0.71 tonnes of CO2. For carbon projects such as solar mini-grids, the combined margin (the usual basis for crediting) is about 0.69 tCO2/MWh. Looking ahead, our scenarios from the plants in the pipeline put the average at 0.71 tCO2/MWh in 2030 and 0.72 in 2035, depending on how many plants arrive on time (see the scenarios). We have not yet rated the quality of its data. See our grid emission factors for the method and all 49 countries.

Grid mix, 2024.

Coal 39% Oil and diesel 43% Hydro 3% Solar 5% Bioenergy 9%

Grid emission factor, 2024 (tCO2/MWh)
MeasuretCO2/MWh
Generated in country0.709
Electricity used, with imports0.709
Combined margin (for carbon projects)0.687
Tariffs and load shedding

What power costs here

Central Electricity Board (CEB)'s Domestic Tariff 110/120/140, first tier tariff, in force from 1 May 2026.

Central Electricity Board (CEB)'s Domestic Tariff 110/120/140, first tier tariff, in force from 1 May 2026. Our utilities, tariffs and load shedding page compares 49 African countries by customer class, with what each tariff includes and load shedding since 2015.

Tariff and load shedding
MeasureValue
Lifeline or first block (0-25 kWh/month)2.18 MUR/kWh, about US$0.045
Household (0-25 kWh/month)3.63 MUR/kWh, about US$0.076
Load shedding nowNo load shedding; record peak demand of 567.9 MW on 6 Feb 2025

Energy charge only, at the central bank rate on 30 October 2026. Check what is included (VAT, levies, fixed charges) on the research page.

Grid consumption

Who uses the power on the grid

Households bought 38% of the electricity sold, by the latest official figures.

Households bought 38% of the electricity sold, by the latest official figures. A household connection used about 202 kWh a month. Our grid consumption page compares sales by customer class, power use per customer and peak demand across 49 African countries.

Grid consumption
MeasureValue
Households38%
Commercial and public38%
Industry22%
Agriculture and other1%
Sold to customers (official)3,070 GWh
National use, UN 20233,012 GWh *
Use per household connectionabout 202 kWh a month
Peak demand568 MW
Load factor71%

Sales and peak: CEB (sole grid supplier), from Statistics Mauritius, Economic and Social Indicators No. 1929: Energy and Water Statistics 2025 (Jun 2026) (calendar 2025). UN: UN Energy Statistics Database (UNdata). * UN estimate or a single figure from a news report.

Certificates and carbon credits

Renewable energy certificates

Mauritius can issue I-RECs, the international renewable energy certificate. 5 plants are registered (64 MW) and 646 GWh of certificates have been issued.

Mauritius can issue I-RECs, the international renewable energy certificate. 5 plants are registered (64 MW) and 646 GWh of certificates have been issued. On the voluntary carbon registries it has 4 carbon credit projects, 4 of them issuing, with about 0.6 million credits issued; 3 are renewable energy projects. Under the Paris Agreement it has 4 activities approved for the UN's new crediting mechanism. See our certificates page to compare certificates with carbon credits across the region.

Certificates and carbon credits
MeasureValue
I-REC statusIssuing
Registered plants5 (64 MW)
I-RECs issued, all years646 GWh
Carbon credit projects4
Carbon credits issued0.6 million

I-RECs: Xpansiv I-REC Registry statistics, October 2026. Carbon projects: CarbonPlan OffsetsDB (Verra, Gold Standard and other voluntary registries), data to June 2026. Article 6: UNEP Copenhagen Climate Centre Article 6 Pipeline, November 2026.

From power plant to battery site

When the thermal plants close

Mauritius has 6 coal, gas or oil plant sites of 50 MW or more, with 616 MW of grid connection. 346 MW of it frees up by 2030 in our central case.

Mauritius has 6 coal, gas or oil plant sites of 50 MW or more, with 616 MW of grid connection. 346 MW of it frees up by 2030 in our central case.

Putting solar and batteries on those connections when they free up would save about 4.4 Mt of CO2 between 2026 and 2050, worth about 2.5 times what they cost to build at the US EPA's social cost of carbon.

Largest sites
PlantFuelConnection (MW)Frees upCO2 saved 2026-2050 (Mt)
Fort George power stationOil14720302.1
Saint Louis (Mauritius) power stationOil11020410.3
Nicolay power stationGas10920301.4
Fort Victoria power stationOil9020300.6
Savannah power stationCoal9020570.0
Terragen power stationCoal7020500.1

Timings, cases and every site: power plant to battery site.

Waste to Wealth

Power from waste

Mauritius' sugar mills, landfills, sewage works, factories and crop residues could make about 19 MW of power that is not built yet (central case), avoiding about 143,913 t of CO2e a year.

Mauritius' sugar mills, landfills, sewage works, factories and crop residues could make about 19 MW of power that is not built yet (central case), avoiding about 143,913 t of CO2e a year.

Power from waste by source (MW, central case)
SourceMW
Landfill gas and biogas1.0
City waste18.4
Largest sites
SiteWhatMW
Port LouisCity waste incineration16.7
Port LouisFood and garden waste biogas1.7
WWTP near Port LouisSewage works biogas0.6

Every site, costs and the method: power from waste.

Second life

Who could use a second-life panel

Places in Mauritius that could use a second-life solar panel add up to about 72 MWp (range 32 to 164): 72 MWp to cut generator use in towns, 0 MWp for mini-grids, 0 MWp for household systems and 0.0 MWp for 0 health facilities and 0 schools with no light at night.

Places in Mauritius that could use a second-life solar panel add up to about 72 MWp (range 32 to 164): 72 MWp to cut generator use in towns, 0 MWp for mini-grids, 0 MWp for household systems and 0.0 MWp for 0 health facilities and 0 schools with no light at night.

Mapped by half-degree cell, with years to 2040: where the panels are needed.

E-mobility

Electric transport, per km

On Mauritius' grid, an electric motorbike emits about 49 g of CO2 per km from the power it charges with, against 48 g for a petrol one (3% more, because of how this grid makes its power).

On Mauritius' grid, an electric motorbike emits about 49 g of CO2 per km from the power it charges with, against 48 g for a petrol one (3% more, because of how this grid makes its power).

CO2 per km from use (g)
VehicleElectricPetrol or dieselDifference
Motorbike4948+3%
Bus9181,673-45%
Small car (newer petrol car)147125+18%

Life-cycle figures, a cost calculator and city air: e-mobility.

Reference

Neighbors, sources and updates

Sources 9 sources
  • Grid lines: OpenStreetMap contributors (ODbL), with gap-fill from the World Bank Africa electricity grid (2017).
  • Power plants: Global Energy Monitor, Global Integrated Power Tracker (September 2026), with WRI and curated public project sources.
  • Capacity and access: national regulators and utilities, and the Tracking SDG7 Energy Progress Report 2026.
  • Retiring solar and batteries: our second-life atlas model (central case, regular losses), from public project registers and IRENA lifetimes.
  • Emission factors: our grid emission factors (Ember, 2024).
  • Thermal plant sites: Global Energy Monitor, Global Integrated Power Tracker (September 2026), and our thermal-to-storage model.
  • Power from waste: FAOSTAT, Global Energy Monitor and OpenStreetMap sites, in our waste-to-energy model.
  • Second-life demand: grid-edge screening, compact targets, World Bank Enterprise Surveys and health and school facility lists, in our second-life atlas.
  • Transport per km: our grid emission factors and vehicle energy use; running costs from national pump prices and tariffs.

The maps are free to view. The data behind this page is available on request: email [email protected]. Lines are indicative, not for engineering or investment decisions.

More data
What changed 3 updates

Our data is checked every month, and this page is rebuilt after each check.

  • 19 November 2026 - Latest update to the Madagascar grid atlas, which this page is generated from.
  • 19 November 2026 - Mauritius and Seychelles added: their lines and substations from OpenStreetMap, power plants from Global Energy Monitor and WRI, towns, and installed capacity and peak demand on the Region tab.
  • 19 November 2026 - Latest update to the grid-edge atlas, which this page is generated from.

Common questions about Mauritius

Where can I find a map of Mauritius's electricity grid?

The free Madagascar and Indian Ocean grid atlas maps Mauritius' high-voltage lines, substations, power plants of 10 MW and above and planned projects. Open it zoomed to Mauritius.

How long is Mauritius's transmission network?

About 154 km of mapped lines at 66 kV and above, mostly from OpenStreetMap.

How much power generation does Mauritius have?

Operating plants of 10 MW and above add up to about 1,078 MW in our atlas, with about 340 MW more under construction or planned.

What is the grid emission factor for Mauritius?

About 0.71 tCO2/MWh for electricity used in 2024, and 0.69 tCO2/MWh as a combined margin for carbon projects. See our grid emission factors for the method.

Can I get the data for Mauritius?

Yes, on request. The maps are free to view; email [email protected] and tell us what you need it for.

Spotted an error, or something missing on this page? Report an issue or send feedback