The medium-voltage lines that carry power from substations to towns, farms and villages, mapped from public data. Real lines are solid; where no mapped line exists, dashed lines show where one is predicted along the roads.

21,523km of mapped medium-voltage lines, 11 to 33 kV
5,635km more predicted along roads, where no line is mapped
21%of the network on this map is predicted, not mapped
17,841MV transformers in public utility data

Click a line, substation or plant for details. Click the map to zoom with the scroll wheel. Lines are indicative, not for engineering or investment decisions.

What the map shows

Lines by voltage and source

There is no public low-voltage data for Zambia, so the map shows medium voltage only.

Each line keeps its source. Where two sources map the same line, we keep one, in this order: utility data, the World Bank 2017 map, OpenStreetMap, then predicted lines.

Line length by voltage
Voltagekm
30 to 33 kV7,748
11 kV and below13,568
Medium voltage, not recorded208
Predicted along roads5,635
Total27,158

Line length by source
SourcekmShare
ZESCO medium-voltage overhead lines (2023)20,50075%
World Bank Africa electricity grid (2017)7493%
OpenStreetMap (newer lines not in the 2017 map)2741%
Predicted along roads (night-time lights, roads and substations)5,63521%
Total27,158100%
Method and caveats

How we built this map

  • We start from utility data where it is public (for Zambia, ZESCO medium-voltage overhead lines from 2023), then add the World Bank Africa electricity grid (2017) and OpenStreetMap lines below 40 kV and power=minor_line, each only where it runs more than 250 m from a line already on the map.
  • Predicted lines follow major roads (motorway to tertiary, from OpenStreetMap), because rural feeders mostly run along roads. A road section is predicted to carry a line where gridfinder (Arderne et al. 2020), a model built on night-time lights, predicts one running along it and no mapped line already explains it. Predicted sections are then joined to the nearest substation or mapped line along the roads, so they form connected feeders, and short gaps along the same road are closed. Smaller (unclassified) roads are used only to reach villages and towns in OpenStreetMap that sit within 1.5 km of a night-time-light prediction. They may be lines that exist but are not mapped, lines at another voltage, or no line at all. We tested the model on Kenya with Kenya Power's own map left out: 85% of the predicted line length lay within 1 km of a real Kenya Power line, and mapped plus predicted lines reached 54% of the real network, against 6% for mapped lines alone.
  • OpenStreetMap power lines with no voltage tag are shown as medium voltage with the voltage not recorded, unless they run along a known high-voltage line or link two parts of the high-voltage network over a long distance. A few may still be high-voltage lines.
  • The 2017 map does not show lines built since then, and OpenStreetMap coverage depends on volunteers. Low-voltage networks are rarely public.
  • Transmission lines (40 kV and above) are on the SAPP grid atlas, not here. World Bank lines with no recorded voltage are left out, since some are transmission.
  • Geometry is simplified to about 30 m for the web. Lengths are measured before simplifying.

Sources

  • Medium-voltage lines: ZESCO medium-voltage overhead lines (2023), published by the World Bank on energydata.info (CC0).
  • Other medium-voltage lines: World Bank Group, Africa electricity grids (2017), via energydata.info (CC BY 4.0).
  • Lines, substations and small plants: OpenStreetMap contributors (ODbL), downloaded 12 November 2026.
  • MV transformers and distribution substations: ZESCO, published by the World Bank on energydata.info (CC BY 4.0).
  • Predicted lines: our road-based model, using gridfinder (Arderne, Zorn, Nicolas and Koks 2020, Predictive mapping of the global power system using open data, Scientific Data, CC BY 4.0), OpenStreetMap roads and settlements (ODbL) and the substations on this map.
  • Power plants of 10 MW and above: our SAPP grid atlas (Global Energy Monitor, CC BY 4.0, and curated public sources).

The map is free to view. The data is available on request: email [email protected] and tell us what you need it for. Last built 12 November 2026.

Back to Zambia grid and access data