Research

Grows where the grid hasn’t.

Renewable energy certificates in Africa

A renewable energy certificate (REC) proves that one megawatt-hour of electricity came from a renewable source. Companies buy them to back claims that they use clean power. This page maps where the international standard, the I-REC, can be issued across 38 countries in Southern, Eastern, West and Central Africa, how many have been issued, where carbon projects and Article 6 deals already are, and what a megawatt-hour of solar earns as a certificate compared with carbon credits.

14 of 38countries have issued I-RECs; 4 more are approved but have issued none yet
15.9 TWhof I-RECs issued in South Africa since 2016, by far the region's largest market
3.9 TWhissued in Zimbabwe, almost all in 2026 and almost all from Kariba, a hydro plant from 1960. Outside Southern Africa, Nigeria leads with 1.1 TWh
US$0.59per MWh, the latest public price for South African solar and wind I-RECs (Argus, August 2026)
What we found

Certificates go where credits can't

  • In South Africa, carbon credits beat certificates at a carbon price of under US$1, so credits are usually the better deal for new solar and wind.
  • In Zambia, the DR Congo, Malawi, Mozambique, Ethiopia, Uganda and Kenya, a megawatt-hour of grid-connected solar earns very few carbon credits, because the grid is already mostly hydro or geothermal. Certificates pay the same as anywhere.
  • That makes certificates the main way to earn from clean power in hydro countries, and the reason old hydro plants in Zambia, Zimbabwe, Uganda, Nigeria and Côte d'Ivoire now issue them.
  • Outside Southern Africa, Nigeria, Uganda, Kenya and Burkina Faso have issued the most certificates.
  • 20 of the 38 countries cannot issue I-RECs yet: Angola, Eswatini, Malawi, Mozambique and Tanzania in Southern Africa, Rwanda, the Comoros, Madagascar and São Tomé and Príncipe in the east and on the islands, and most of West and Central Africa (Benin, Guinea, Liberia, Niger, Senegal, the Gambia, Togo, Cameroon, the Central African Republic, Gabon and the Republic of the Congo).
A word of care

One megawatt-hour, one claim

Selling a certificate and a carbon credit for the same megawatt-hour counts the same clean power twice. Gold Standard does not allow it. Large volumes of certificates from old hydro plants can also let buyers claim clean power without adding any new supply, which is why some buyers ask for recent plants only.

The GHG Protocol is revising its rules for certificates, with a new standard expected in 2027. It may require hourly matching and certificates from the same grid as the buyer.

Zimbabwe: issuing I-RECs, 2 registered plants (1,055 MW), 3.9 TWh issuedZambia: issuing I-RECs, 12 registered plants (2,905 MW), 81 GWh issuedUganda: issuing I-RECs, 41 registered plants (80 MW), 747 GWh issuedTogo: not yet approved for I-RECsTanzania: not yet approved for I-RECsEswatini: not yet approved for I-RECsSouth Africa: issuing I-RECs, 133 registered plants (6,701 MW), 15.9 TWh issuedSierra Leone: approved for I-RECs, nothing issued yet (1 plant registered)Senegal: not yet approved for I-RECsSão Tomé and Príncipe: not yet approved for I-RECsRwanda: not yet approved for I-RECsNigeria: issuing I-RECs, 159 registered plants (2,001 MW), 1.1 TWh issuedNiger: not yet approved for I-RECsNamibia: issuing I-RECs, 4 registered plants (19 MW), 56 GWh issuedMozambique: not yet approved for I-RECsMauritania: issuing I-RECs, 1 registered plants (102 MW), 110 GWh issuedMalawi: not yet approved for I-RECsMadagascar: not yet approved for I-RECsLiberia: not yet approved for I-RECsLesotho: approved for I-RECs, nothing issued yetKenya: issuing I-RECs, 9 registered plants (199 MW), 676 GWh issuedGuinea: not yet approved for I-RECsGhana: issuing I-RECs, 61 registered plants (17 MW), 35 GWh issuedThe Gambia: not yet approved for I-RECsGabon: not yet approved for I-RECsEthiopia: issuing I-RECs, 1 registered plants (0 MW), 529 MWh issuedCôte d'Ivoire: issuing I-RECs, 1 registered plants (275 MW), 94 GWh issuedDR Congo: issuing I-RECs, 4 registered plants (3 MW), 11 GWh issuedRepublic of the Congo: not yet approved for I-RECsComoros: not yet approved for I-RECsChad: issuing I-RECs, 1 registered plants (2 MW), 2.3 GWh issuedCentral African Republic: not yet approved for I-RECsCameroon: not yet approved for I-RECsBurundi: approved for I-RECs, nothing issued yetBurkina Faso: issuing I-RECs, 3 registered plants (99 MW), 450 GWh issuedBotswana: approved for I-RECs, nothing issued yetBenin: not yet approved for I-RECsAngola: not yet approved for I-RECsZimbabwe: issuing I-RECs, 2 registered plants (1,055 MW), 3.9 TWh issuedZambia: issuing I-RECs, 12 registered plants (2,905 MW), 81 GWh issuedUganda: issuing I-RECs, 41 registered plants (80 MW), 747 GWh issuedSouth Africa: issuing I-RECs, 133 registered plants (6,701 MW), 15.9 TWh issuedNigeria: issuing I-RECs, 159 registered plants (2,001 MW), 1.1 TWh issuedNamibia: issuing I-RECs, 4 registered plants (19 MW), 56 GWh issuedMauritania: issuing I-RECs, 1 registered plants (102 MW), 110 GWh issuedKenya: issuing I-RECs, 9 registered plants (199 MW), 676 GWh issuedGhana: issuing I-RECs, 61 registered plants (17 MW), 35 GWh issuedEthiopia: issuing I-RECs, 1 registered plants (0 MW), 529 MWh issuedCôte d'Ivoire: issuing I-RECs, 1 registered plants (275 MW), 94 GWh issuedDR Congo: issuing I-RECs, 4 registered plants (3 MW), 11 GWh issuedChad: issuing I-RECs, 1 registered plants (2 MW), 2.3 GWh issuedBurkina Faso: issuing I-RECs, 3 registered plants (99 MW), 450 GWh issued
IssuingApproved, nothing issued yetNot approvedI-RECs issued (circle size)

Certificates to 1 October 2026; carbon credits to June 2026. Hover or tap a country for details. Countries in plain sand are not covered.

Country by country

Where I-RECs can be issued

CountryStatusPlantsRegistered capacityIssued, all yearsIssued in 2026
Southern Africa (SAPP)
South AfricaIssuing1336,701 MW (solar 2,305, wind 2,238, nuclear 1,940, bioenergy 201, hydro 17)15.9 TWh3.9 TWh
ZimbabweIssuing21,055 MW3.9 TWh3.8 TWh
ZambiaIssuing122,905 MW (hydro 2,858, solar 48)81 GWh22 GWh
NamibiaIssuing419 MW56 GWh22 GWh
DR CongoIssuing43 MW (solar 2, hydro 1)11 GWh315 MWh
BotswanaApproved, nothing issued yet----
LesothoApproved, nothing issued yet----
AngolaNot approved----
EswatiniNot approved----
MalawiNot approved----
MozambiqueNot approved----
TanzaniaNot approved----
Eastern Africa (EAPP)
UgandaIssuing4180 MW (hydro 60, solar 19)747 GWh149 GWh
KenyaIssuing9199 MW (wind 100, solar 100)676 GWh248 GWh
EthiopiaIssuing10.3 MW529 MWh275 MWh
BurundiApproved, nothing issued yet----
RwandaNot approved----
West Africa (WAPP)
NigeriaIssuing1592,001 MW (hydro 1,980, solar 22)1.1 TWh85 GWh
Burkina FasoIssuing399 MW450 GWh130 GWh
MauritaniaIssuing1102 MW110 GWh24 GWh
Côte d'IvoireIssuing1275 MW94 GWh94 GWh
GhanaIssuing6117 MW35 GWh17 GWh
Sierra LeoneApproved, nothing issued yet15 MW--
BeninNot approved----
GuineaNot approved----
LiberiaNot approved----
NigerNot approved----
SenegalNot approved----
The GambiaNot approved----
TogoNot approved----
Central Africa
ChadIssuing12 MW2.3 GWh208 MWh
CameroonNot approved----
Central African RepublicNot approved----
GabonNot approved----
Republic of the CongoNot approved----
Island grids
ComorosNot approved----
MadagascarNot approved----
São Tomé and PríncipeNot approved----

1 I-REC = 1 MWh. Source: Xpansiv I-REC Registry, aggregated monthly statistics, October 2026; country approvals from the International Tracking Standard Foundation. Country names link to each country's page on the I-REC Standard site. The registry does not publish plant names. Energy Peace Partners is the issuer in Burundi, Chad, the DR Congo, Ethiopia and Sierra Leone; the Green Certificate Company in most other countries, and Kenya's energy regulator (EPRA) in Kenya. Approved means an issuer is accredited; Sierra Leone has one plant registered but no certificates issued yet. South Africa also has a national scheme, zaRECs, not counted here.

RECs and carbon credits

What one megawatt-hour of grid-connected solar earns

A solar plant can usually sell each megawatt-hour once: either as a certificate, or as part of a carbon credit, not both. A certificate is worth the same everywhere: one per megawatt-hour. A carbon credit is one tonne of CO2 avoided, so how many credits a megawatt-hour earns depends on how dirty the grid it replaces is. We use our grid emission factors (combined margin for wind and solar). For what this does to a project's tariff and returns, see our report Carbon, certificates and the bottom line.

Set your own prices. Carbon credit prices vary widely by standard, project type and buyer; US$5 is only a starting point.

CountryAs a certificateI-RECs available?As carbon creditsCredits pay more aboveCertificate valueCarbon credit value
Botswana1 RECApproved0.95 tUS$0.62--
South Africa1 RECYes0.89 tUS$0.66--
Madagascar1 RECNot yet0.79 tUS$0.75--
Chad1 RECYes0.74 tUS$0.80--
São Tomé and Príncipe1 RECNot yet0.74 tUS$0.80--
Niger1 RECNot yet0.73 tUS$0.80--
Senegal1 RECNot yet0.73 tUS$0.81--
The Gambia1 RECNot yet0.70 tUS$0.84--
Burkina Faso1 RECYes0.62 tUS$0.96--
Mauritania1 RECYes0.57 tUS$1.03--
Comoros1 RECNot yet0.57 tUS$1.03--
Benin1 RECNot yet0.53 tUS$1.11--
Zimbabwe1 RECYes0.51 tUS$1.15--
Ghana1 RECYes0.49 tUS$1.19--
Gabon1 RECNot yet0.49 tUS$1.19--
Republic of the Congo1 RECNot yet0.48 tUS$1.22--
Togo1 RECNot yet0.48 tUS$1.22--
Tanzania1 RECNot yet0.47 tUS$1.25--
Côte d'Ivoire1 RECYes0.45 tUS$1.31--
Nigeria1 RECYes0.45 tUS$1.32--
Liberia1 RECNot yet0.30 tUS$1.93--
Rwanda1 RECNot yet0.30 tUS$1.95--
Burundi1 RECApproved0.20 tUS$2.89--
Cameroon1 RECNot yet0.18 tUS$3.21--
Guinea1 RECNot yet0.15 tUS$3.81--
Angola1 RECNot yet0.13 tUS$4.50--
Zambia1 RECYes0.11 tUS$5.57--
Sierra Leone1 RECApproved0.10 tUS$5.73--
Mozambique1 RECNot yet0.09 tUS$6.41--
Central African Republic1 RECNot yet0.09 tUS$6.94--
Kenya1 RECYes0.06 tUS$10.00--
Malawi1 RECNot yet0.03 tUS$23.60--
Eswatini1 RECNot yet0.02 tUS$24.58--
Uganda1 RECYes0.02 tUS$36.88--
Namibia1 RECYes0.01 tUS$39.33--
DR Congo1 RECYes0.00 tnever--
Ethiopia1 RECYes0.00 tnever--
Lesotho1 RECApproved----

"Credits pay more above" is the carbon price at which carbon credits beat a certificate at US$0.59. Values are per MWh before costs: registering a carbon project costs far more than registering for certificates, and carbon credits need the project to be additional. Carbon credits use production-based factors; for countries that import much of their power (Namibia, Eswatini, Botswana, Lesotho, Togo, Benin, Niger) a standard may count imports, which would raise the credits. Indicative only, not financial advice.

Renewable energy certificates

  • Prove where electricity came from. One certificate per megawatt-hour, anywhere.
  • Used by companies to report the emissions from the power they buy (the market-based method of the Greenhouse Gas Protocol).
  • Any registered renewable plant qualifies, old or new. Kariba, built in 1960, now issues them.
  • Cheap to register, cheap to buy. Published African prices are around US$0.50 to US$1.50.

Carbon credits

  • Count tonnes of CO2 avoided compared with what would have happened otherwise.
  • Used to offset emissions, or traded between countries under the Paris Agreement (Article 6).
  • The project must be additional: it would not have happened without the carbon revenue. Old hydro plants do not qualify.
  • Worth most where grids burn coal. In hydro countries a megawatt-hour of solar avoids almost nothing on paper.
For project developers

What could your project earn?

Pick a country and a project. The calculator shows which instruments it could use and a rough yearly value for each. A megawatt-hour can only be sold once, so these are alternatives, not a total.

InstrumentCan it use it?Units per yearRough value per year

Grid projects: carbon credits use the new UN tool's combined margin from our grid emission factors (in brackets, what the tool's default would give a project that skips the calculation). Off-grid solar: credits counted against the diesel it replaces, using the UN tool's conservative default for oil-fired units, 0.54 tCO2/MWh. D-RECs are for distributed solar, mostly up to 1 MW, at about US$20-30; P-RECs come from Energy Peace Partners' priority countries at about US$45 on average. All need I-RECs to be available in the country. Before costs: carbon projects cost far more to register and verify. Indicative only, not financial advice.

Other certificates and markets

D-RECs, P-RECs and the rest

The I-REC is the base layer. On top of it sit impact labels for small and hard-to-reach projects, D-RECs and P-RECs, that sell for many times more. Around it sit national and regional schemes. Here is how they compare, and how much one megawatt-hour can earn under each.

Standard certificates (I-REC)Impact labels on I-RECsCarbon credits per MWh of grid-connected solar
US$0.1US$1US$10US$100I-REC, Brazil (2023)US$0.16-0.19I-REC, IndiaUS$0.4-0.5I-REC, South Africa (Aug 2026)US$0.59I-REC, Zimbabwe hydro (2026)US$1-1.5I-REC, Mexico (Dec 2025)US$6.45D-REC, distributed solarUS$20-30P-REC, fragile statesUS$45Carbon credits, 1 MWh grid solar, Zambia, US$5/tUS$0.53Carbon credits, 1 MWh grid solar, South Africa, US$5/tUS$4.45

US$ per MWh, log scale. Ranges shown with a lighter bar. Prices from Argus, S&P Global Platts, Reccessary, the D-REC Organization, Energy Peace Partners and Okra Solar; dates vary, see sources below. Carbon credits use our combined margin for wind and solar at an illustrative US$5 per tonne.

InstrumentWhat it isWho runs itTypical price per MWhIn our 38 countries
I-RECProof that 1 MWh came from a renewable plant, mostly grid-scaleInternational Tracking Standard Foundation; local issuersUS$0.16-6.45 (country dependent)14 of our 38 countries issuing, 4 approved
D-RECAn impact label on I-RECs from distributed solar (mostly up to 1 MW, on- or off-grid), many small systems pooledD-REC Organization (started by South Pole); sold by Powertrust and othersabout US$20-30One deal named: Prosus, 3 GWh from India and South Africa, 2022-2025
P-RECA label on I-RECs from projects in fragile, energy-poor countries; the premium helps fund new projectsEnergy Peace Partners, also the I-REC issuer in the DR Congoabout US$45 on averageEnergy Peace Partners is the I-REC issuer in Burundi, Chad, the DR Congo, Ethiopia and Sierra Leone; P-REC projects in the DR Congo (Goma streetlights, Garamba mini-grids); Angola, Mozambique and Zimbabwe on its priority list
zaRECSouth Africa's national certificate scheme, under European (EECS) ruleszaRECs, with the voluntary association RECSAnot publishedSouth Africa only
TIGRA global certificate registry run by XpansivXpansiv (APX)not publishedNone: issuing countries are in Asia and Latin America
Guarantee of OriginThe EU's certificate, required for green power claims in EuropeNational bodies in Europeabout EUR 0.57 (Feb 2026)None
Carbon creditOne tonne of CO2 avoided by an additional projectGold Standard, Verra, the Paris Agreement mechanismsset by the market per tonne; per MWh it depends on the gridMany projects; value per MWh is high in South Africa, low in hydro countries

What the premium buys

D-RECs and P-RECs carry all the uses of a normal I-REC, plus a story buyers pay for: power for homes, clinics and businesses that had none, often in fragile places. Energy Peace Partners pays part of a project's building costs up front in return for years of certificates. This is not the formal additionality test used for carbon credits, but the money does go to new projects.

What it means here

Grid-connected solar in Zambia, Malawi, Mozambique, the DR Congo, Ethiopia, Uganda and Kenya earns very few carbon credits, because the grid is mostly hydro or geothermal, so certificates matter most there. Off-grid mini-grids and solar home systems are different: their carbon credits are counted against the diesel and kerosene they replace, so they can earn far more, and many already sell carbon credits. For them a D-REC or P-REC is an alternative to carbon credits, not an extra, since the same megawatt-hour cannot be sold twice. Either way, labels need I-RECs, and 20 of our 38 countries cannot issue them yet, including Malawi, Mozambique, Rwanda, Senegal and Madagascar. Powertrust, the main D-REC seller, has published no projects in Southern Africa so far.

Carbon credits on the ground

Where carbon projects already are

The comparison above is about solar. In practice, most carbon credits from these countries come from forests and cookstoves. Renewable energy projects that sell carbon credits are few outside South Africa, Namibia, Senegal, Mauritania and Côte d'Ivoire, which fits the grid factors: credits pay where grids burn coal, gas or oil, or where solar replaces diesel. For carbon deals between governments, see Article 6 below.

CountryProjectsIssuingCredits issuedForest projectsCookstove and efficiencyRenewable energy
Southern Africa (SAPP)
DR Congo601246.9 M20 (94% of credits)20 (4% of credits)5 (1% of credits)
Zimbabwe301233.8 M2 (86% of credits)19 (5% of credits)1
Zambia903425.1 M15 (64% of credits)35 (19% of credits)4
South Africa1736323.8 M1633 (54% of credits)42 (21% of credits)
Malawi1589520.0 M7 (17% of credits)108 (75% of credits)6 (under 1% of credits)
Tanzania94198.7 M14 (68% of credits)24 (19% of credits)3
Mozambique96474.1 M3 (under 1% of credits)39 (27% of credits)3
Namibia750.5 M014 (98% of credits)
Lesotho510.3 M000
Angola630.2 M05 (100% of credits)1
Botswana40-100
Eswatini00-000
Eastern Africa (EAPP)
Kenya34615985.4 M20 (34% of credits)127 (18% of credits)21 (1% of credits)
Uganda29617534.8 M24 (11% of credits)153 (14% of credits)14 (3% of credits)
Rwanda22514021.4 M3113 (35% of credits)5 (under 1% of credits)
Ethiopia894413.0 M10 (81% of credits)25 (5% of credits)7 (under 1% of credits)
Burundi1454.8 M06 (82% of credits)3 (18% of credits)
West Africa (WAPP)
Ghana701815.9 M13 (12% of credits)23 (61% of credits)0
Nigeria1297313.5 M418 (36% of credits)6
Côte d'Ivoire1555.7 M3 (8% of credits)6 (1% of credits)1 (88% of credits)
Sierra Leone33164.7 M5 (67% of credits)11 (27% of credits)0
Senegal31132.9 M9 (17% of credits)6 (2% of credits)5 (56% of credits)
Burkina Faso102451.5 M255 (19% of credits)2 (9% of credits)
Togo38161.0 M326 (67% of credits)1 (11% of credits)
Mauritania221.0 M002 (100% of credits)
The Gambia1170.9 M14 (2% of credits)0
Benin1760.9 M3 (33% of credits)8 (66% of credits)1 (2% of credits)
Guinea12266,77954 (100% of credits)0
Niger2138,7692 (100% of credits)00
Liberia3122,906110
Central Africa
Central African Republic611.3 M3 (100% of credits)30
Cameroon1961.0 M5 (85% of credits)6 (5% of credits)1 (1% of credits)
Republic of the Congo1860.7 M10 (95% of credits)4 (5% of credits)0
Chad520.1 M030
Gabon70-400
Island grids
Madagascar1385913.6 M9 (42% of credits)90 (28% of credits)12 (4% of credits)
Comoros5117,454131 (100% of credits)
São Tomé and Príncipe00-000

Projects on the Verra, Gold Standard and other voluntary registries, as compiled by CarbonPlan's OffsetsDB (data to June 2026). Credits in millions of tonnes of CO2e. Projects without a clear category are counted in the totals only. Projects under the UN's Clean Development Mechanism are not included. Eswatini and São Tomé and Príncipe have none listed.

Renewable energy projects with carbon credits

Outside South Africa, where 42 renewable projects have issued about 5.0 million credits, mostly from two wind farms at De Aar, these renewable energy projects have issued credits (30 more are listed with none issued yet):

Show the full list 32 items

What this tells us

Namibia's solar and wind farms sell carbon credits even though the country's own power plants are mostly hydro. Carbon standards have used the regional SAPP factor, about 0.95 tCO2/MWh and driven by South African coal, and Namibia imports much of its power. Malawi's new solar farms at Salima, Golomoti and Nkhotakota are registered for carbon credits too. Zambia's grid-scale solar has issued no carbon credits yet; Bangweulu is registered for certificates instead. In West Africa, Senegal's Taiba N'Diaye wind farm and Mauritania's Nouakchott wind and solar plants sell carbon credits, and Côte d'Ivoire's Soubré hydro dam has issued about 5 million.

The same plant should not sell both for the same megawatt-hour. When a project is on a carbon registry and an I-REC registry, buyers should ask which one each megawatt-hour was sold under. Côte d'Ivoire's only I-REC plant, registered in 2025, is a 275 MW hydro plant commissioned in May 2017, the size and date of Soubré.

Deals between governments

Article 6: who is trading carbon

Under Article 6 of the Paris Agreement, countries can sell emission reductions to other countries (Article 6.2) or host projects under the new UN crediting mechanism (Article 6.4). 13 of our 38 countries have signed deals or listed activities; Madagascar, Ghana and Rwanda have the most Article 6.2 activities. For the Southern African detail, partners and national rules, see our Article 6 tracker for Southern Africa.

CountryStatusBilateral agreementsArticle 6.2 activitiesActivities approved for the UN mechanismCredits transferred (ITMOs)
Southern Africa (SAPP)
MalawiDeals signed246-
TanzaniaDeals signed22--
ZambiaDeals signed423-
DR CongoRules in place----
ZimbabweRules in place-2--
MozambiqueUN mechanism only--1-
South AfricaUN mechanism only--17-
AngolaNo activity yet----
BotswanaNo activity yet----
EswatiniNo activity yet----
LesothoNo activity yet----
NamibiaNo activity yet----
Eastern Africa (EAPP)
EthiopiaDeals signed2-5-
KenyaDeals signed5717-
RwandaDeals signed3142-
BurundiUN mechanism only--1-
UgandaUN mechanism only--15-
West Africa (WAPP)
BeninDeals signed1---
GhanaDeals signed544211.7 thousand
SenegalDeals signed447-
Sierra LeoneDeals signed-1--
The GambiaDeals signed-1--
Burkina FasoUN mechanism only--2-
Côte d'IvoireUN mechanism only--1-
NigeriaUN mechanism only--5-
GuineaNo activity yet----
LiberiaNo activity yet----
MauritaniaNo activity yet----
NigerNo activity yet----
TogoNo activity yet----
Central Africa
GabonDeals signed1-1-
CameroonUN mechanism only--2-
Central African RepublicNo activity yet----
ChadNo activity yet----
Republic of the CongoNo activity yet----
Island grids
MadagascarDeals signed-6242.72 million
ComorosNo activity yet----
São Tomé and PríncipeNo activity yet----

Counts from the UNEP Copenhagen Climate Centre's Article 6 Pipeline country pages (updated 5 November 2026); Southern African countries checked against national sources in our tracker. "Rules in place" means a national framework or authority but no deals yet. Country names link to the Pipeline page. ITMOs are internationally transferred mitigation outcomes, in tonnes of CO2e.

Look it up yourself

Registries and sources

Every certificate and carbon credit lives in a public registry. These are the places to check a project, a country or a claim.

Reference

Method, sources and updates

How we made this

Country status from the International Tracking Standard Foundation's issuer list, country pages and approval notices (checked 11 November 2026). Registered plants, capacity and volumes issued from the Xpansiv I-REC Registry's aggregated monthly statistics (October 2026), summed by country. Carbon credits per megawatt-hour use the combined margin for wind and solar from our grid emission factors. Carbon projects from CarbonPlan's OffsetsDB; Article 6 counts from the UNEP Copenhagen Climate Centre's Article 6 Pipeline.

Prices come from public market reports and are thin: only South Africa and Zimbabwe have published prices.

Sources

Xpansiv I-REC Registry, aggregated monthly statistics, October 2026; International Tracking Standard Foundation (issuers and country approvals); Argus Media, 1 September 2026 (prices and the Zim-REC platform); S&P Global Platts (Mexico I-RECs, December 2025); Reccessary (Brazil and India I-RECs); D-REC Organization and Okra Solar (D-RECs); Energy Peace Partners (P-RECs); Veyt (European Guarantees of Origin, February 2026); Gold Standard Renewable Energy Activity Requirements v1.4; GHG Protocol Scope 2 Guidance; Aloe Energy grid emission factors; CarbonPlan OffsetsDB (carbon projects, data to June 2026); UNEP Copenhagen Climate Centre Article 6 Pipeline (November 2026).

Indicative only, not financial, legal or carbon market advice. The summary data is available on request: email [email protected].

What changed 3 updates

The registry publishes new statistics every month. We update the map when countries are approved or volumes change.

  • November 2026 - Widened from the 12 SAPP countries to 38 countries in Southern, Eastern, West and Central Africa: I-REC status and volumes, carbon projects and a new Article 6 table for each.
  • November 2026 - Added carbon credit projects by country (Verra, Gold Standard and other voluntary registries), links to the public registries, and a certificates section on each SAPP country page.
  • November 2026 - First edition: I-REC status, registered plants and issuance for the 12 SAPP countries to October 2026, with a comparison against carbon credits and other certificate types.

Common questions

Which Southern African countries can issue I-RECs?

As of October 2026, South Africa, Zambia, Zimbabwe, Namibia and the DR Congo have issued I-RECs. Botswana and Lesotho are approved but have no plants registered yet. Angola, Eswatini, Malawi, Mozambique and Tanzania are not yet approved.

Which West, East and Central African countries can issue I-RECs?

Of the countries we cover outside Southern Africa, Burkina Faso, Chad, Côte d'Ivoire, Ethiopia, Ghana, Kenya, Mauritania, Nigeria and Uganda have issued I-RECs, and Burundi and Sierra Leone are approved. The rest, Benin, Cameroon, the Central African Republic, the Comoros, Gabon, Guinea, Liberia, Madagascar, Niger, the Republic of the Congo, Rwanda, Senegal, São Tomé and Príncipe, the Gambia and Togo, are not yet approved.

What is the difference between a REC and a carbon credit?

A REC proves that one megawatt-hour came from a renewable source and is used to report the emissions from electricity a company buys. A carbon credit is one tonne of CO2 avoided compared with a baseline, and the project must be additional. The same megawatt-hour should not be sold as both.

Should a solar project sell RECs or carbon credits?

It depends on the grid. Where the grid burns coal, as in South Africa, carbon credits usually earn more. Where the grid is mostly hydro, as in Zambia or the DR Congo, a megawatt-hour of grid-connected solar earns few carbon credits, so certificates are often the better option. Off-grid systems that replace diesel or kerosene are counted differently and can earn more carbon credits. Use the calculator above with your own prices.

What are D-RECs and P-RECs?

Both are labels on I-RECs. D-RECs come from distributed solar, such as rooftop systems and mini-grids, pooled together, and sell for about US$20 to US$30 per megawatt-hour. P-RECs, from Energy Peace Partners, come from projects in fragile, energy-poor countries and have averaged about US$45. In Southern Africa, P-RECs have been issued in the DR Congo. Energy Peace Partners is also the certificate issuer in Burundi, Chad, Ethiopia and Sierra Leone.

How much is an I-REC worth in South Africa?

Argus assessed current-year South African solar and wind I-RECs at US$0.59 per MWh in August 2026. Zimbabwe hydro I-RECs have traded at about US$1 to US$1.50, in small volumes.

Can Aloe Energy help with certificates or carbon credits?

We prepare grid emission factors and GHG studies for specific projects as a paid service. Email [email protected].