Grows where the grid hasn’t.
Article 6 carbon markets in Africa
Article 6 of the Paris Agreement lets countries trade carbon results: one country pays for emission cuts in another and counts them toward its own target. This page tracks which of 54 African countries have signed deals, with whom, which projects are authorized, and the rules each government has set.
A few countries lead, most have not started
- 29 of 54 countries have some Article 6 activity. 15 have signed deals, and only Ghana and Madagascar have moved carbon results abroad.
- Madagascar, Ghana and Rwanda have the most Article 6.2 projects. In Southern Africa, where we track each project, most are clean cooking and biogas, bought by Switzerland's KliK Foundation.
- Under the UN mechanism, South Africa and Kenya lead on projects approved by the host; 13 projects across Africa are registered so far.
- Zambia's deal with Norway is the first large one for electricity in Southern Africa: payments for verified cuts from new grid solar with batteries, up to 3.5 million tonnes over ten years.
- Governments are taking a share. Tanzania takes 8% of gross revenue, Zimbabwe deducts 33% of credits issued, and Zambia's rules set a share of proceeds.
Power projects need a grid factor
Every power project traded under Article 6 needs a grid emission factor to count its cuts. The UN's new electricity tool lets developers calculate one or use a cautious default, which can cut credits by more than two thirds in coal-heavy grids.
See our grid emission factors for each country's factor under the new rules, our certificates page for how carbon credits compare with renewable energy certificates, and our report Carbon, certificates and the bottom line for what they do to project finance.
Status in November 2026. Hover or tap a country.
Who is trading
Counts from the UNEP Copenhagen Climate Centre's Article 6 Pipeline (country pages updated October and November 2026). For the 12 Southern African Power Pool countries, partners and projects are matched from government and buyer announcements; elsewhere we show the pipeline counts. Article 6.2: deals between countries. Article 6.4: the UN's new crediting mechanism (projects approved by the host country, and those registered by the UN). Transfers: internationally transferred mitigation outcomes (ITMOs), in tonnes of CO2. DR Congo's counts could not be confirmed.
| Country | Status | Bilateral agreements | Cooperative approaches | Article 6.2 projects | Article 6.4 projects approved | Article 6.4 projects registered | Transfers so far |
|---|---|---|---|---|---|---|---|
| Southern Africa (SAPP) | |||||||
| Zambia | Bilateral deals signed | 4 | - | 2 | 3 | - | 0 |
| Malawi | Bilateral deals signed | 2 | - | 4 | 6 | 1 | 0 |
| Tanzania | Bilateral deals signed | 2 | - | 2 | 0 | - | 0 |
| Mozambique | Article 6.4 projects approved | 0 | - | 0 | 1 | - | 0 |
| South Africa | Article 6.4 projects approved | 0 | - | 0 | 17 | - | 0 |
| Zimbabwe | Rules in place, no deals yet | 0 | - | 2 | 0 | - | 0 |
| DR Congo | Rules in place, no deals yet | - | - | - | - | - | - |
| Angola | No activity yet | 0 | - | 0 | 0 | - | 0 |
| Botswana | No activity yet | 0 | - | 0 | 0 | - | 0 |
| Eswatini | No activity yet | 0 | - | 0 | 0 | - | 0 |
| Lesotho | No activity yet | 0 | - | 0 | 0 | - | 0 |
| Namibia | No activity yet | 0 | - | 0 | 0 | - | 0 |
| Eastern Africa (EAPP) | |||||||
| Kenya | Bilateral deals signed | 5 | 1 | 7 | 17 | 1 | 0 |
| Rwanda | Bilateral deals signed | 3 | 2 | 14 | 2 | 0 | 0 |
| Ethiopia | Bilateral deals signed | 2 | 1 | 0 | 5 | 0 | 0 |
| Burundi | Article 6.4 projects approved | 0 | 0 | 0 | 1 | 0 | 0 |
| Uganda | Article 6.4 projects approved | 0 | 0 | 0 | 15 | 6 | 0 |
| Djibouti | No activity yet | 0 | 0 | 0 | 0 | 0 | 0 |
| Eritrea | No activity yet | 0 | 0 | 0 | 0 | 0 | 0 |
| Somalia | No activity yet | 0 | 0 | 0 | 0 | 0 | 0 |
| South Sudan | No activity yet | 0 | 0 | 0 | 0 | 0 | 0 |
| Sudan | No activity yet | 0 | 0 | 0 | 0 | 0 | 0 |
| West Africa (WAPP) | |||||||
| Ghana | Bilateral deals signed | 5 | 1 | 44 | 2 | 2 | 11.7 thousand |
| Senegal | Bilateral deals signed | 4 | 1 | 4 | 7 | 0 | 0 |
| Benin | Bilateral deals signed | 1 | 0 | 0 | 0 | 0 | 0 |
| Sierra Leone | Bilateral deals signed | 0 | 1 | 1 | 0 | 0 | 0 |
| The Gambia | Bilateral deals signed | 0 | 1 | 1 | 0 | 0 | 0 |
| Burkina Faso | Article 6.4 projects approved | 0 | 0 | 0 | 2 | 0 | 0 |
| Cabo Verde | Article 6.4 projects approved | 0 | 0 | 0 | 1 | 0 | 0 |
| Côte d'Ivoire | Article 6.4 projects approved | 0 | 0 | 0 | 1 | 0 | 0 |
| Mali | Article 6.4 projects approved | 0 | 11 | 0 | 2 | 1 | 0 |
| Nigeria | Article 6.4 projects approved | 0 | 0 | 0 | 5 | 0 | 0 |
| Guinea | No activity yet | 0 | 0 | 0 | 0 | 0 | 0 |
| Guinea-Bissau | No activity yet | 0 | 0 | 0 | 0 | 0 | 0 |
| Liberia | No activity yet | 0 | 0 | 0 | 0 | 0 | 0 |
| Mauritania | No activity yet | 0 | 0 | 0 | 0 | 0 | 0 |
| Niger | No activity yet | 0 | 0 | 0 | 0 | 0 | 0 |
| Togo | No activity yet | 0 | 0 | 0 | 0 | 0 | 0 |
| Central Africa | |||||||
| Gabon | Bilateral deals signed | 1 | 0 | 0 | 1 | 0 | 0 |
| Cameroon | Article 6.4 projects approved | 0 | 0 | 0 | 2 | 0 | 0 |
| Central African Republic | No activity yet | 0 | 0 | 0 | 0 | 0 | 0 |
| Chad | No activity yet | 0 | 0 | 0 | 0 | 0 | 0 |
| Equatorial Guinea | No activity yet | 0 | 0 | 0 | 0 | 0 | 0 |
| Republic of the Congo | No activity yet | 0 | 0 | 0 | 0 | 0 | 0 |
| North Africa | |||||||
| Morocco | Bilateral deals signed | 3 | 0 | 2 | 1 | 0 | 0 |
| Tunisia | Bilateral deals signed | 3 | 1 | 0 | 0 | 0 | 0 |
| Egypt | Article 6.4 projects approved | 0 | 0 | 0 | 2 | 1 | 0 |
| Algeria | No activity yet | 0 | 0 | 0 | 0 | 0 | 0 |
| Libya | No activity yet | 0 | 0 | 0 | 0 | 0 | 0 |
| Island grids | |||||||
| Madagascar | Bilateral deals signed | 0 | 4 | 62 | 4 | 1 | 2.72 million |
| Mauritius | Article 6.4 projects approved | 0 | 0 | 0 | 4 | 0 | 0 |
| Comoros | No activity yet | 0 | 0 | 0 | 0 | 0 | 0 |
| Seychelles | No activity yet | 0 | 0 | 0 | 0 | 0 | 0 |
| São Tomé and Príncipe | No activity yet | 0 | 0 | 0 | 0 | 0 | 0 |
What each country has done
Southern Africa, in detail
Zambia
- Sweden (MoU Aug 2024, agreement 18 Nov 2024)
- Singapore (MoU 19 Nov 2024)
- Norway (agreement Nov 2024; purchase agreement 28 Jan 2026 for up to 3.5 Mt CO2e over 10 years from grid solar and batteries)
- Switzerland (agreement 20 Nov 2025)
- BioLite improved cookstoves, about 163,500 stoves, buyer KliK Foundation (authorized Aug 2026)
- Modern Energy Cooking Zambia (SupaMoto pellet stoves), about 200,000 stoves, buyer KliK (authorized Aug 2026)
Rules: Green Economy and Climate Change Act 2024; Carbon Market Framework (Jan 2025); Carbon Market Regulations 2026; national carbon registry run by the Zambia Environmental Management Agency (Aug 2026). Share of proceeds applies; rate not published in our sources.
Authority: Ministry of Green Economy and Environment. Sources: [1] [2] [3] [4] [5] [6] [7]
Malawi
- Switzerland (agreement 16 Nov 2022; implementation launched 8 Oct 2026)
- Singapore (MoU 21 Nov 2025)
- Malawi Dairy Biogas, 10,000 digesters, buyer KliK (authorized Mar 2026)
- ATEC electric cooking, 76,000 cookstoves, buyer KliK (authorized Oct 2026)
- A cookstove project, up to 1.4 million credits (letter of authorization Aug 2024)
Rules: National carbon market framework (Aug 2025). Share of proceeds not confirmed.
Authority: Ministry of Natural Resources and Climate Change. Sources: [1] [2] [3] [4]
Tanzania
- Japan, Joint Crediting Mechanism (28 May 2025; the only SAPP country in the JCM)
- Singapore (MoU 9 Jun 2026)
- Two activities listed; not named in public sources
Rules: Carbon Trading Regulations 2022, amended 2023: government takes 8% of gross revenue (plus 8% for local governments where they manage a project); letters of authorization for Article 6; Clean Development Mechanism projects move to Article 6.4.
Authority: Vice President's Office (Environment). Sources: [1] [2] [3] [4]
Mozambique
- 1 Article 6.4 activity approved by the host
Rules: Carbon market regulation still in draft (Dec 2025).
Authority: Ministry of Agriculture, Environment and Fisheries. Sources: [1] [2]
South Africa
- 17 Article 6.4 activities approved by the host, none registered yet (most in SAPP)
Rules: Draft Article 6 framework published for comment Nov 2024; adoption not confirmed.
Authority: Department of Electricity and Energy. Sources: [1]
Zimbabwe
- Two activities and one cooperative approach listed; not named in public sources. Government says it is negotiating with several countries.
Rules: Carbon Trading (General) Regulations, SI 48 of 2025: Zimbabwe Carbon Markets Authority; deductions of 1% to the national climate target (NDC), 2% to a national buffer and 30% to a national transaction account; public letters of authorization.
Authority: Zimbabwe Carbon Markets Authority. Sources: [1] [2]
DR Congo
- Pipeline counts not confirmed
Rules: Ordinance-law on the carbon market legal regime reported Sep 2026: national registry, Article 6 in national law.
Authority: Not confirmed. Sources: [1]
The rest of Africa, from the pipeline counts
Show the full list 22 items
- Kenya: 5 bilateral agreements, 1 cooperative approach, 7 Article 6.2 activities and 17 Article 6.4 activities approved by the host, 1 registered.
- Rwanda: 3 bilateral agreements, 2 cooperative approaches, 14 Article 6.2 activities and 2 Article 6.4 activities approved by the host.
- Ethiopia: 2 bilateral agreements, 1 cooperative approach and 5 Article 6.4 activities approved by the host.
- Burundi: 1 Article 6.4 activity approved by the host.
- Uganda: 15 Article 6.4 activities approved by the host, 6 registered.
- Ghana: 5 bilateral agreements, 1 cooperative approach, 44 Article 6.2 activities and 2 Article 6.4 activities approved by the host, 2 registered. Transfers so far: 11.7 thousand ITMOs.
- Senegal: 4 bilateral agreements, 1 cooperative approach, 4 Article 6.2 activities and 7 Article 6.4 activities approved by the host.
- Benin: 1 bilateral agreement.
- Sierra Leone: 1 cooperative approach and 1 Article 6.2 activity.
- The Gambia: 1 cooperative approach and 1 Article 6.2 activity.
- Burkina Faso: 2 Article 6.4 activities approved by the host.
- Cabo Verde: 1 Article 6.4 activity approved by the host.
- Côte d'Ivoire: 1 Article 6.4 activity approved by the host.
- Mali: Pipeline page shows 11 cooperative approaches but no agreements or 6.2 activities; PACM participation requirements submitted 6 Sep 2024; 1 registered PACM activity (transitioned CDM, lighting).
- Nigeria: 5 Article 6.4 activities approved by the host.
- Gabon: 1 bilateral agreement and 1 Article 6.4 activity approved by the host.
- Cameroon: 2 Article 6.4 activities approved by the host.
- Morocco: Three bilateral agreements and two Article 6.2 activities; no ITMOs transferred yet.
- Tunisia: Three bilateral agreements and one cooperative approach; no activities yet.
- Egypt: Two activities approved by the host under Article 6.4, one registered; no credits issued yet.
- Madagascar: 4 cooperative approaches, 62 Article 6.2 activities and 4 Article 6.4 activities approved by the host, 1 registered. Transfers so far: 2.72 million ITMOs.
- Mauritius: Four transitioning CDM activities approved by the host (three solar or wind, one landfill gas), none registered yet; participation requirements submitted 26 Jan 2026.
No Article 6 deals or projects yet. Southern Africa (SAPP): Angola, Botswana, Eswatini, Lesotho and Namibia. Eastern Africa (EAPP): Djibouti, Eritrea, Somalia, South Sudan and Sudan. West Africa (WAPP): Guinea, Guinea-Bissau, Liberia, Mauritania, Niger and Togo. Central Africa: Central African Republic, Chad, Equatorial Guinea and Republic of the Congo. North Africa: Algeria and Libya. Island grids: Comoros, Seychelles and São Tomé and Príncipe.
Sources and updates
What changed 2 updates
- 25 November 2026 - Widened from the 12 Southern African Power Pool countries to all 54 countries we cover, with cooperative approaches and registered Article 6.4 projects added to the table. The page moved from /research/article-6-southern-africa, which now redirects here.
- 8 November 2026 - First edition: Article 6 deals, projects and national rules for the 12 SAPP countries.
Indicative only, not legal or carbon market advice. Corrections welcome: email [email protected].
Get these changes by email
Once a month we send one short email with what changed across all our atlases and pages, each change with its source, plus new research and open data.
Common questions
Which African countries have Article 6 agreements?
As of November 2026, 15 countries have signed bilateral agreements or joined a cooperative approach: Benin, Ethiopia, Gabon, Ghana, Kenya, Madagascar, Malawi, Morocco, Rwanda, Senegal, Sierra Leone, Tanzania, The Gambia, Tunisia and Zambia. In Southern Africa, Zambia has deals with Sweden, Singapore, Norway and Switzerland, Malawi with Switzerland and Singapore, and Tanzania with Japan's Joint Crediting Mechanism and Singapore.
What is the difference between Article 6.2 and Article 6.4?
Article 6.2 covers deals agreed directly between countries. Article 6.4 is a UN-run crediting mechanism, the successor to the Clean Development Mechanism, with its own rules and registry.
Has any African country transferred carbon results yet?
Yes, Ghana and Madagascar: Ghana 11.7 thousand ITMOs; Madagascar 2.72 million ITMOs, according to the Article 6 Pipeline. Malawi's first transfer under its Swiss deal is the next expected in Southern Africa.
How much does the government take?
It varies. Tanzania takes 8% of gross revenue, plus 8% for local governments where they manage the project. Zimbabwe deducts 1% for its climate target, 2% for a buffer and 30% to a national account. Zambia applies a share of proceeds before the first transfer.
Can solar and mini-grid projects earn Article 6 credits?
Yes, if they are additional and use an approved method. Zambia's deal with Norway pays for grid solar with batteries. Off-grid projects count their cuts against the diesel and kerosene they replace.
Spotted an error, or something missing on this page? Report an issue or send feedback