The EAPP grid atlas

One map of the Eastern Africa Power Pool core: Ethiopia, Kenya, Uganda, Rwanda and Burundi, with Tanzania and DR Congo, which also belong to the Southern African Power Pool. The high-voltage grid today, every power plant of 10 MW and above, the lines and plants in the pipeline, and what the 2014 master plan promised.

7countries, from Ethiopia and Djibouti's border to Lake Tanganyika
2,000 MWEthiopia-Kenya HVDC rating; about 200 MW is contracted today
5,150 MWat the Grand Ethiopian Renaissance Dam, inaugurated in September 2025
24transmission projects tracked, each with every date that was promised

Country pagesOpen the atlas full screen

Free posters

Print the map

Two A0 posters of the EAPP grid, free to download: the grid and power plants today, and everything planned to 2035 and beyond. There is also an A2 pair for each member country.

Free to print and share for non-commercial use with credit to Aloe Energy, unchanged (CC BY-NC-ND 4.0). A0 (841 x 1189 mm); prints well at A1 too.

What the map shows

Promises, and what got built

For every line and plant in the pipeline, the atlas keeps each date that was promised, who promised it and where.

  • The Kenya-Tanzania 400 kV line was promised for 2017 and switched on in December 2024.
  • Uganda-South Sudan was in the 2014 master plan for 2020; its funding arrived in 2025 and the target is now 2028.
  • Karuma's 600 MW came online in September 2024, six years after the first target.
The bottlenecks

Wires are not the limit

Most interconnectors carry a small share of their rating. The Ethiopia-Kenya link is rated 2,000 MW, but Kenya's own grid caps flows below 500 MW. Sudan's war has cut Ethiopia-Sudan trade to 10-20 MW, and the regional day-ahead market has been tested but is not yet trading.

More in our policy brief Wires are not the limit, which sets these links beside the limits on every SAPP interconnection, and on our interconnector limits map.

Where long single lines carry a country's imports, power close to demand makes the whole system safer.

Reference

Sources and updates

Sources

Grid lines, substations and some plants from OpenStreetMap, with gaps filled from TANESCO (2015) and World Bank (2017) maps. Plants from Global Energy Monitor's Global Integrated Power Tracker (September 2026, CC BY 4.0), our own project register, and the WRI database, OpenStreetMap and World Bank AICD where GEM has nothing. Trade, capacity and access from national regulators, utilities, the Nile Basin Initiative and Tracking SDG7. Line colors match our SAPP atlas.

When EAPP publishes its updated master plan, it will replace the 2014 plan on the map.

The data

The map is free to view. For the underlying data, email [email protected].

Routes are indicative, and the map is not for engineering or investment decisions. Email [email protected] to send a correction.

Sources behind each feature

Every line, substation, plant and project on the map lists the public sources that show it. Click a feature to see them, or set "Color lines by" to "Number of sources". Of 51,713 km of line in the EAPP grid atlas, 52% is confirmed by two or more sources (7,141 km by three or more) and 48% rests on one. Of 348 power plants, 64 appear in two or more sources. Counts as of 13 November 2026.

OpenStreetMap lines also shown in:

  • World Bank Africa grid map (2017): 25,138 km
  • TANESCO power system (World Bank, 2015): 4,487 km
  • Kenya Power network (World Bank, 2014): 4,156 km

The rules are the same for all our grid atlases: what counts as a source.

What changed 4 updates

Every month we check utilities, regulators, funders and project news for new lines, plants and dates, and update the map. Each change keeps its source.

  • 13 November 2026 - Every line, substation, plant and project now lists the public sources that show it. Click any feature to see them, or switch "Color lines by" to "Number of sources" to see where two or more sources agree. See the counts.
  • 11 November 2026 - Free posters: two A0 sheets of the EAPP grid, today and to 2035 and beyond, plus an A2 pair for each country. Download them from this page or from Posters.
  • 8 November 2026 - Power plants now come first from Global Energy Monitor (September 2026): 348 plants, up from 197, including many planned solar, wind and hydro projects. Grid checked against Open Infrastructure Map.
  • 8 November 2026 - First edition published: the grid from OpenStreetMap with gap-fill, 197 power plants, 24 transmission projects with their date history, the EAPP master plan 2014, interconnector trade and country statistics. Same tools as the SAPP atlas: voltage slider, source view, backgrounds and search.

Common questions

Where can I find a map of the Eastern Africa Power Pool grid?

Right here. The EAPP grid atlas is a free interactive map of the Eastern Africa Power Pool core: transmission lines, power plants of 10 MW and above, the project pipeline and the EAPP master plan. Open it full screen.

Which countries does it cover?

Seven: Ethiopia, Kenya, Uganda, Rwanda and Burundi, plus Tanzania and DR Congo, which belong to both EAPP and the Southern African Power Pool.

What does it show about the Ethiopia-Kenya link?

The Ethiopia-Kenya HVDC line is rated 2,000 MW, but only about 200 MW is contracted today and Kenya's own grid caps flows below 500 MW. The atlas maps interconnector trade like this across the region.

Which projects are tracked?

24 transmission projects, each with every date that was promised, who promised it and where. Examples include the Kenya-Tanzania 400 kV line and Uganda-South Sudan.

Can I download the data?

The map is free to view. The underlying data is available on request: email [email protected].

How often is it updated?

Every month, with each change and its source listed in the changelog on this page.