About 391,000 people in the Comoros live where satellites see no electric light at night, and 74% of them live within 15 km of a power line. This page brings together what our grid-edge screening and the Comoros's Mission 300 energy compact say about who still needs power, how close the grid is and what the country has committed to.
Open the grid-edge atlas Download the two-page brief (PDF) Fiche en français (PDF)
Lines and access
Gridfinder, which combines OpenStreetMap lines with medium-voltage lines predicted from night-time lights, maps about 57 km of existing and likely power lines in the Comoros. That includes lower-voltage distribution lines, so it is not comparable with the high-voltage totals on our grid-atlas country pages. We have not yet built a detailed grid atlas for this country.
| Commitment | Value |
|---|---|
| Access target | 100% by 2030 |
| Planned split of new access | grid 78%, mini-grids 14%, standalone solar 8% |
| Clean cooking target | from 0% to 30% by 2030 |
| Private investment sought | US$0.273 billion |
| Rules for mini-grids when the grid arrives | Mentioned only |
| E-waste commitment | No |
Who lives near the grid but off it
About 391,000 people in the Comoros, roughly 45% of the population, live where satellites see no electric light at night. Of them, 74% live within 15 km of a mapped or predicted power line: 191,000 within 2 km, 99,000 2 to 15 km away, and 102,000 farther out. The largest group lives within 2 km of a line, so the main gap is last-mile connections and affordability, more than new lines. At its 2016-2023 pace, about 2.1 percentage points a year (World Bank), the Comoros would reach the 100% access target in its Mission 300 compact by 2030: on track.
- Within 2 km: 191,000 (49%)
- 2 to 15 km: 99,000 (25%)
- More than 15 km: 102,000 (26%)
See the numbers as a table
| Distance | Million people | Share |
|---|---|---|
| Within 2 km of a line | 0.19 | 49% |
| 2 to 15 km | 0.10 | 25% |
| More than 15 km | 0.10 | 26% |
| Total | 0.39 | 100% |
How we count this
"Without night-time light" is a satellite proxy, not a measured access rate. Distances are straight lines to mapped or predicted lines. See the grid-edge atlas for the method.
More about Comoros
Open any topic for the full text and tables.
Mission 300What the energy compact commits to
The Comoros's Mission 300 energy compact targets 100% electricity access by 2030. New access is planned as 78% grid, 14% mini-grids and 8% standalone solar. Each value is quoted, with its page, on our compacts page, where compacts sit side by side. Nothing is scored or ranked.
EmissionsGrid emission factor
Each megawatt-hour generated in the Comoros in 2023 came with about 0.76 tonnes of CO2. For carbon projects such as solar mini-grids, the combined margin (the usual basis for crediting) is about 0.38 tCO2/MWh. Looking ahead, our scenarios from the plants in the pipeline put the average at 0.37 to 0.71 tCO2/MWh in 2030 and 0.42 to 0.71 in 2035, depending on how many plants arrive on time (see the scenarios). We have not yet rated the quality of its data. See our grid emission factors for the method and all 38 countries.
Grid mix, 2023.
Oil and diesel 100%
Air in the city
Satellite-based estimates put fine particulate matter (PM2.5) in Moroni, the capital, at about 6 µg/m³ on average in 2023, just above the WHO guideline of 5, about the same as 6 in 2013. The WHO database has no ground measurement for the city. Electric motorbikes and buses cut exhaust where people breathe it; see e-mobility for 71 cities.
| Measure | tCO2/MWh |
|---|---|
| Generated in country | 0.762 |
| Electricity used, with imports | 0.762 |
| Combined margin (for carbon projects) | 0.381 |
Tariffs and load sheddingWhat power costs here
Our utilities, tariffs and load shedding page compares 39 African countries by customer class, with what each tariff includes and load shedding since 2015.
| Measure | Value |
|---|---|
| Load shedding now | Not confirmed for November 2026; load shedding on Grande Comore in 2025 |
Energy charge only, at the central bank rate on 30 October 2026. Check what is included (VAT, levies, fixed charges) on the research page.
Certificates and carbon creditsRenewable energy certificates
the Comoros cannot issue I-RECs, the international renewable energy certificate, yet. On the voluntary carbon registries it has 5 carbon credit projects, 1 of them issuing, with about 0.0 million credits issued; 1 are renewable energy projects. See our certificates page to compare certificates with carbon credits across the region.
| Measure | Value |
|---|---|
| I-REC status | Not approved |
| Registered plants | - |
| I-RECs issued, all years | - |
| Carbon credit projects | 5 |
| Carbon credits issued | 0.0 million |
I-RECs: Xpansiv I-REC Registry statistics, October 2026. Carbon projects: CarbonPlan OffsetsDB (Verra, Gold Standard and other voluntary registries), data to June 2026. Article 6: UNEP Copenhagen Climate Centre Article 6 Pipeline, November 2026.
Neighbors, sources and updates
Sources 4 sources
- People without night-time light and distance to the grid: WorldPop 2020 and gridfinder (Arderne et al. 2020, CC BY 4.0), as screened in our grid-edge atlas.
- City air: Atmospheric Composition Analysis Group, Washington University in St. Louis (PM2.5 V6.GL.02.04); WHO Ambient Air Quality Database 2026.
- Emission factors: our grid emission factors (Ember, 2023).
- Compact commitments: the national Mission 300 energy compact, as quoted page by page on our compacts page.
The maps are free to view. The data behind this page is available on request: email [email protected]. Lines are indicative, not for engineering or investment decisions.
More data
More in the grid-edge atlas, grid emission factors and Mission 300 compacts, or see all countries.
What changed
Our data is checked every month, and this page is rebuilt after each check.
- 16 November 2026 - Latest update to the grid-edge atlas, which this page is generated from.
Common questions about the Comoros
Where can I find a map of the Comoros's electricity grid?
Our free grid-edge atlas shows the Comoros with mapped and predicted power lines and where people without power live. A detailed high-voltage atlas is not built yet.
How many people in the Comoros live without electricity?
About 391,000 people live where satellites see no electric light at night, a proxy for living without power. Of them, 74% are within 15 km of a power line.
What is the grid emission factor for the Comoros?
About 0.76 tCO2/MWh for electricity used in 2023, and 0.38 tCO2/MWh as a combined margin for carbon projects. See our grid emission factors for the method.
What is the Comoros's Mission 300 energy compact target?
The Comoros's Mission 300 energy compact targets 100% electricity access by 2030. New access is planned as 78% grid, 14% mini-grids and 8% standalone solar. See all compacts side by side on our compacts page.
Can I get the data for the Comoros?
Yes, on request. The maps are free to view; email [email protected] and tell us what you need it for.