Country data

Southern African Power Pool and Eastern Africa Power Pool

Tanzania electricity grid and access

Tanzania sits in both the Southern African and the Eastern Africa Power Pools, and it is building the lines to prove it: links to Kenya are running, and lines toward Zambia and Uganda are on the way. The Julius Nyerere hydro plant has roughly doubled what the country can generate. About 35 million people still live without night-time light, and 85% of them live within 15 km of a power line, so the next step is reaching homes near the grid.

35 Mpeople live without night-time light, a proxy for no power
85%of them live within 15 km of a power line
9,206km of high-voltage lines, 66 kV and above
3,870MW of operating power plants, 10 MW and above
47power plants and transmission lines planned or under construction
The grid today

Lines, substations and demand

Tanzania's mapped high-voltage network runs to about 9,206 km of lines at 66 kV and above, with 64 substations. The highest voltage on the map is 400 kV, and 69% of the line length runs at 220 kV or more. About 1,631 km come from older World Bank (2017) and TANESCO (2015) maps, used where OpenStreetMap has gaps. Installed capacity was about 3,092 MW (2025), and peak demand about 1,944 MW (2025). The latest international tracking report puts access to electricity at 52% of people.

Mapped line length
Voltagekm
400 kV959
220 kV4,270
132 kV1,769
66 kV395
Voltage not recorded181
Gap-fill from older public maps1,631
Total9,206
Near the grid, not on it

Who lives near the grid but off it

About 35 million people in Tanzania, roughly 52% of the population, live where satellites see no electric light at night. Of them, 85% live within 15 km of a mapped or predicted power line: 9.3 million within 2 km, 21 million 2 to 15 km away, and 5.2 million farther out. The largest group lives 2 to 15 km out: close enough to plan for the grid, too far for a quick connection. That is where mini-grids built to join the grid later can do the most good. At its 2016-2023 pace, about 2.4 percentage points a year (World Bank), Tanzania would reach the 75% access target in its Mission 300 compact around 2034, not 2030; the target needs about 3.8 points a year.

  • Within 2 km: 9.3 million (26%)
  • 2 to 15 km: 21 million (59%)
  • More than 15 km: 5.2 million (15%)
See the numbers as a table
People without night-time light, by distance to a line
DistanceMillion peopleShare
Within 2 km of a line9.3026%
2 to 15 km20.9759%
More than 15 km5.2215%
Total35.48100%
How we count this

"Without night-time light" is a satellite proxy, not a measured access rate. Distances are straight lines to mapped or predicted lines. See the grid-edge atlas for the method.

Generation and pipeline

Power plants and projects

There are 27 operating power plants of 10 MW and above, adding up to about 3,870 MW, 75% of it hydro. The largest is Julius Nyerere (2,115 MW, hydro). Another 42 plants totaling about 8,550 MW are under construction or planned, 402 MW of them under construction. The largest plant under construction is Kinyerezi I extension (185 MW, gas).

Five transmission projects touching Tanzania are in our register. The most delayed is Nyakanazi-Kigoma 400 kV (North West Grid): 3 years later than first promised, now expected in 2026.

  • Nyakanazi-Kigoma 400 kV (North West Grid) (400 kV): line complete, substations finishing, expected 2026, 3 years behind the first date.
  • Tanzania-Zambia interconnector (TAZA), Tanzania section (400 kV): under construction, expected 2026.
  • Mozambique-Tanzania interconnector: studies starting.
  • North West Grid: Kigoma - Mpanda - Sumbawanga 400 kV (400 kV): planned.
  • Uganda-Tanzania 400 kV interconnector (400 kV): planned.
Power plants of 10 MW and above
TypeOperating MWPipeline MW
Hydro2,8941,914
Coal1,200
Gas3601,012
Oil412
Solar1502,105
Wind2,070
Geothermal228
Biomass3021
Other24
Total3,8708,550
Topics

More about Tanzania

Open any topic for the full text and tables.

Mission 300

What the energy compact commits to

Tanzania's Mission 300 energy compact commits to raising electricity access from 46% to 75% by 2030.

Tanzania's Mission 300 energy compact commits to raising electricity access from 46% to 75% by 2030. Each value is quoted, with its page, on our compacts page, where compacts sit side by side. Nothing is scored or ranked.

Mission 300 energy compact
CommitmentValue
Electricity access now46% (2022)
Access target75% by 2030
Clean cooking targetfrom 7% to 75% by 2030
Private investment soughtUS$4.039 billion
Rules for mini-grids when the grid arrivesMentioned only
E-waste commitmentNo
Waste to Wealth

Second life for solar and batteries

Between 2026 and 2040, about 6,500 tonnes of solar equipment and stationary batteries are expected to retire in Tanzania, most of it off-grid solar kits and mini-grids.

Between 2026 and 2040, about 6,500 tonnes of solar equipment and stationary batteries are expected to retire in Tanzania, most of it off-grid solar kits and mini-grids. That is 1.6% of the total for the 18 countries in our second-life atlas. Today the nearest recyclers for panels and lithium batteries are in Gauteng and Cape Town, so most of this waste would travel far and cross borders.

Solar and batteries retiring, 2026-2040 (tonnes)
StreamTonnesShare of country
Solar panels2,09132%
Off-grid solar kits and mini-grids4,45768%
Total6,548100%
Tanzania compared with the 18 countries in our second-life atlas, 2026-2040
TanzaniaAtlas totalShare
Retiring solar and batteries (tonnes)6,548412,6681.6%
Reusable battery storage (MWh)04,3220.0%
Retiring in 2030 (tonnes)316
Retiring in 2035 (tonnes)367
Retiring in 2040 (tonnes)542

From our second-life atlas, central case, by country. Electric vehicle batteries are modeled for the region as a whole, so they are not in these country figures.

Emissions

Grid emission factor

Each megawatt-hour generated in Tanzania in 2024 came with about 0.35 tonnes of CO2.

Each megawatt-hour generated in Tanzania in 2024 came with about 0.35 tonnes of CO2. For carbon projects such as solar mini-grids, the combined margin (the usual basis for crediting) is about 0.43 tCO2/MWh. Looking ahead, our scenarios from the plants in the pipeline put the average at 0.00 to 0.23 tCO2/MWh in 2030 and 0.00 to 0.23 in 2035, depending on how many plants arrive on time (see the scenarios). Data quality is rated low. See our grid emission factors for the method and all 38 countries.

Grid mix, 2024. 2% of the electricity used is imported.

Gas 63% Oil and diesel 4% Hydro 32% Bioenergy 1%

Air in the city

Satellite-based estimates put fine particulate matter (PM2.5) in Dodoma, the capital, at about 22 µg/m³ on average in 2023, about 4 times the WHO guideline of 5, up from 17 in 2013. In Dar es Salaam, the largest city, it was about 20. The WHO database has no ground measurement for the city. Electric motorbikes and buses cut exhaust where people breathe it; see e-mobility for 71 cities.

Grid emission factor, 2024 (tCO2/MWh)
MeasuretCO2/MWh
Generated in country0.350
Electricity used, with imports0.358
Combined margin (for carbon projects)0.429
Tariffs and load shedding

What power costs here

TANESCO's T1 General usage tariff, in force from 1 April 2016.

TANESCO's T1 General usage tariff, in force from 1 April 2016. Our utilities, tariffs and load shedding page compares 39 African countries by customer class, with what each tariff includes and load shedding since 2015.

Tariff and load shedding
MeasureValue
Lifeline or first block (0-75 kWh/month)100 TZS/kWh, about US$0.038
Household (single rate)292 TZS/kWh, about US$0.111
Load shedding nowNone (per parliamentary committee chair, Feb 2026)

Energy charge only, at the central bank rate on 30 October 2026. Check what is included (VAT, levies, fixed charges) on the research page.

Certificates and carbon credits

Renewable energy certificates

Tanzania cannot issue I-RECs, the international renewable energy certificate, yet.

Tanzania cannot issue I-RECs, the international renewable energy certificate, yet. On the voluntary carbon registries it has 94 carbon credit projects, 19 of them issuing, with about 8.7 million credits issued; 3 are renewable energy projects. Under the Paris Agreement it has 2 bilateral Article 6 agreements and 2 Article 6.2 activities. See our certificates page to compare certificates with carbon credits across the region.

Certificates and carbon credits
MeasureValue
I-REC statusNot approved
Registered plants-
I-RECs issued, all years-
Carbon credit projects94
Carbon credits issued8.7 million

I-RECs: Xpansiv I-REC Registry statistics, October 2026. Carbon projects: CarbonPlan OffsetsDB (Verra, Gold Standard and other voluntary registries), data to June 2026. Article 6: UNEP Copenhagen Climate Centre Article 6 Pipeline, November 2026.

Reference

Neighbors, sources and updates

Sources 8 sources
  • Grid lines: OpenStreetMap contributors (ODbL), with gap-fill from the World Bank Africa electricity grid (2017) and TANESCO (2015).
  • Power plants: Global Energy Monitor, Global Integrated Power Tracker (September 2026), with WRI and curated public project sources.
  • Capacity and access: national regulators and utilities, and the Tracking SDG7 Energy Progress Report 2026.
  • People without night-time light and distance to the grid: WorldPop 2020 and gridfinder (Arderne et al. 2020, CC BY 4.0), as screened in our grid-edge atlas.
  • Retiring solar and batteries: our second-life atlas model (central case, regular losses), from public project registers and IRENA lifetimes.
  • City air: Atmospheric Composition Analysis Group, Washington University in St. Louis (PM2.5 V6.GL.02.04); WHO Ambient Air Quality Database 2026.
  • Emission factors: our grid emission factors (Ember, 2024).
  • Compact commitments: the national Mission 300 energy compact, as quoted page by page on our compacts page.

The maps are free to view. The data behind this page is available on request: email [email protected]. Lines are indicative, not for engineering or investment decisions.

What changed 6 updates

Our data is checked every month, and this page is rebuilt after each check.

  • 16 November 2026 - Latest update to the SAPP grid atlas, which this page is generated from.
  • 16 November 2026 - Monthly check. The Mozambique-Malawi interconnector was energized on 8 August 2026; it stays in commissioning until a tariff deal lets commercial trading start. Source. The Tanzania section of the Tanzania-Zambia interconnector is 92% complete and now due in December 2026, seven months after its May 2026 target. Source. Angola-Namibia (ANNA): implementation agreement signed in April 2026 added to the project history.
  • 13 November 2026 - Latest update to the EAPP grid atlas, which this page is generated from.
  • Mar 2026 - Nyakanazi-Kigoma 400 kV (North West Grid): TANESCO, now expected 2026, line done, substations finishing.
  • Aug 2026 - Tanzania-Zambia interconnector (TAZA), Tanzania section: Due to finish this year, now expected 2026.
  • Oct 2026 - Tanzania-Zambia interconnector (TAZA), Tanzania section: Deputy Minister of Energy, 92% complete, now expected Dec 2026.

Common questions about Tanzania

Where can I find a map of Tanzania's electricity grid?

The free SAPP grid atlas maps Tanzania's high-voltage lines, substations, power plants of 10 MW and above and planned projects. Open it zoomed to Tanzania.

How many people in Tanzania live without electricity?

About 35 million people live where satellites see no electric light at night, a proxy for living without power. Of them, 85% are within 15 km of a power line.

How long is Tanzania's transmission network?

About 9,206 km of mapped lines at 66 kV and above, mostly from OpenStreetMap, with older public maps filling gaps.

How much power generation does Tanzania have?

Operating plants of 10 MW and above add up to about 3,870 MW in our atlas, with about 8,550 MW more under construction or planned.

What is the grid emission factor for Tanzania?

About 0.36 tCO2/MWh for electricity used in 2024, and 0.43 tCO2/MWh as a combined margin for carbon projects. See our grid emission factors for the method.

What is Tanzania's Mission 300 energy compact target?

Tanzania's Mission 300 energy compact commits to raising electricity access from 46% to 75% by 2030. See all compacts side by side on our compacts page.

Can I get the data for Tanzania?

Yes, on request. The maps are free to view; email [email protected] and tell us what you need it for.