Grows where the waste piles up.
The second-life atlas
Southern and Eastern Africa are building solar farms, battery storage and electric motorbike fleets at record pace. In a decade or two, that equipment starts to retire. This atlas maps what will retire, when and where, across 18 countries: the 12 Southern African Power Pool members, the five Eastern Africa Power Pool core countries and Madagascar, so second-life and recycling plans can start before the waste exists.
The small stuff comes first
- Before 2035, most retiring equipment is small: early panel failures and repowering, solar lanterns and home systems, and the home batteries South Africans bought during load-shedding.
- Large solar farms and grid batteries retire in volume from the late 2030s.
- Electric motorbike swap batteries are the near-term EV opportunity, as storage for solar home systems. Car and bus packs will not meet large storage needs before the mid-2040s.
- Recovering materials from panels pays only when silver is recovered too.
A long way to a recycler
All of the region's battery and panel recyclers are in South Africa. Waste from Tanzania, the DR Congo, Angola or Zambia would travel 1,700 to 4,300 km and cross two to four borders to reach one, each crossing a separate permit for hazardous waste.
That makes a strong case for a northern hub, for example around Lusaka or the Copperbelt, for testing, second-life rebuilds and collection.
Enough within reach for a hub?
A recycler or a second-life workshop only works if enough retired equipment can reach it. We drew a 150 km catchment around every town in the region and added up the panels and battery modules retiring inside it each year to 2040. Choose a reach and a year. Bigger circles mean more tonnes within reach; green circles have passed 1,000 tonnes a year, roughly the smallest plant worth building. This section covers the 12 SAPP countries for now; Eastern Africa and Madagascar follow.
1,000 t a year or more within reach500 to 1,000 tunder 500 tExisting battery or panel recycler
The wide case counts everything within 150 km in a straight line. The narrow case keeps the same 150 km but by road, which we take as 120 km in a straight line using the 1.25 detour factor the atlas uses for its corridors. Real road routing is planned for mid 2027. Tonnes count only sources in the town's own country; tonnes within reach across a border are shown separately in each popup.
When does each country have enough for a hub?
The hub-ready year is the first year from which at least 1,000 tonnes of panels and battery modules retire every year within one catchment inside the country. South Africa gets there in 2028, where the recyclers already are. Zambia follows in 2039. Nowhere else in the region holds 1,000 tonnes a year in one catchment before 2040 (Angola touches it for a single year in 2037, when a wave of early solar farms is repowered). Lesotho and Eswatini have almost nothing at home but more than 12,000 tonnes within 150 km across the South African border. For most of the region, the realistic near-term step is collection and consolidation, with one or two northern hubs that pool waste across borders.
| Country | Wide reach (150 km straight line) | Narrow reach (150 km by road) | Tonnes a year in the best catchment, 2040 | Road km from that catchment to the nearest battery recycler | What the Mission 300 compact says |
|---|---|---|---|---|---|
| South Africa | 2028 | 2028 | 13,331 | 5 | No compact |
| Zambia | 2039 | 2039 | 1,412 | 1,448 | Mentions e-waste (no commitment) |
| Mozambique | after 2040 | after 2040 | 717 | 553 | Nothing on e-waste |
| DR Congo | after 2040 | after 2040 | 626 | 2,178 | Nothing on e-waste |
| Angola | after 2040 | after 2040 | 580 | 2,464 | No compact |
| Namibia | after 2040 | after 2040 | 482 | 1,530 | Nothing on e-waste |
| Botswana | after 2040 | after 2040 | 424 | 1,046 | Nothing on e-waste |
| Zimbabwe | after 2040 | after 2040 | 393 | 1,262 | Nothing on e-waste |
| Malawi | after 2040 | after 2040 | 235 | 1,911 | Commits to solar and battery e-waste rules |
| Tanzania | after 2040 | after 2040 | 170 | 3,187 | Nothing on e-waste |
| Lesotho | after 2040 | after 2040 | 55* | 411 | Nothing on e-waste |
| Eswatini | after 2040 | after 2040 | 41* | 472 | No compact |
Tonnes of panels and battery modules from sources inside the country, central (regular loss) case, electric vehicle packs not yet included. * Lesotho and Eswatini each have more than 11,000 tonnes retiring within 150 km across the South African border over 2026-2040, not counted here. Hub towns are not named here; see the method note below. Generated 2026-11-09 from the atlas data.
The road to version 1.0
This atlas is version 0.5. Here is how we plan to improve it over the next months. Every step uses public data and keeps its sources, and each one shows up in the list of changes below when it reaches the map.
- Cited numbers (by early 2027): replace our remaining assumptions, such as jobs, emissions avoided, freight costs and early panel failures, with published figures.
- Filling the gaps (early 2027): rooftop and business solar outside South Africa, recyclers in other countries, electric motorcycle sales and battery types by country.
- Real routes and a northern hub (mid 2027): real roads and railways instead of straight lines, border times, and where a recycling hub in the north would make most sense. First step done: the "Where the supply will land" section above.
- The report (mid 2027): "More than one life", our full report on second-life potential, reviewed by others and free to download.
- Eastern Africa (first step done, November 2026): Kenya, Uganda, Rwanda, Burundi, Ethiopia and Madagascar are now on the map. Next: the hub analysis and Mission 300 compacts for these six, cars, and rooftop and business solar outside Kenya.
Data checks every month, a full rebuild every quarter and a review once a year. Know a project, recycler or dataset we should add? Email [email protected].
Method, sources and updates
How it works
Every solar and battery project in the regional pipeline is weighted by its chance of being built, then aged with standard retirement curves from IRENA and the IEA. Smaller streams, from home systems to electric vehicles, are added from national statistics and clearly labeled assumptions. Each load of waste is routed along the main road and rail corridors to the nearest recycler.
These are estimates with stated assumptions, not forecasts. Select any project on the map to see its sources.
Sources
Global Energy Monitor, Global Integrated Power Tracker (March 2026, CC BY 4.0); a battery storage register built from public announcements; World Bank Africa electricity grid (2017); Natural Earth; IRENA and IEA PVPS end-of-life studies; IRENA off-grid statistics.
Draft, November 2026. The full report, “More than one life”, is in preparation. Email [email protected] to review it, share data or hear when it is out.
What changed 3 updates
Every month we check for new solar and battery projects, recyclers and electric vehicle figures across Southern and Eastern Africa, and update the map. Each change keeps its source.
- 16 November 2026 - Version 0.5: Eastern Africa and Madagascar added (Ethiopia, Kenya, Uganda, Rwanda, Burundi, Madagascar). New: 104 solar and 7 battery projects with sources, off-grid stock (IRENA 2025), Kenya business solar (EPRA, 373 MW), Kenya electric motorbike registrations and Rwanda's electric-only rule, East African collection centers, and the Northern, Central, Djibouti and Madagascar corridors with sea routes to Durban. Southern African figures are unchanged.
- 9 November 2026 - New section "Where the supply will land": tonnes of panels and batteries retiring within 150 km of each of 438 towns, 2026-2040, with wide and narrow reach cases and a hub-ready year per country.
- 6 November 2026 - First edition published: solar, battery storage and EV battery retirements across SAPP to 2040, second-life potential and the region's recyclers. Monthly checks start on 22 November.
Common questions
How much solar and battery waste will Southern and Eastern Africa have?
About 46 thousand tonnes of solar panels and batteries, including electric vehicle packs, retire in 2035 alone across the 18 countries, rising to about 106 thousand tonnes in 2040. The 12 SAPP countries account for about 36 and 86 thousand tonnes of that; Kenya leads the six eastern countries, mostly electric motorbike batteries and solar home systems.
Can old batteries get a second life?
Yes. About 14 GWh of retired batteries from 2026 to 2040 should be good enough for second-life storage, worth roughly US$0.6-1.1 billion. Electric motorbike swap batteries are the nearest opportunity, as storage for solar home systems.
Where are the solar panel and battery recyclers in Southern Africa?
All of them are in South Africa, around Gauteng and Cape Town. Waste from Tanzania, DR Congo, Angola or Zambia would travel 1,700 to 4,300 km and cross two to four borders to reach one, which makes the case for a northern hub around Lusaka or the Copperbelt. Eastern Africa has collection and dismantling centers in Kenya and Rwanda but no working panel or lithium battery recycler yet (one is planned in Kenya), so its material also has to reach South Africa, by road or by sea to Durban.
Which Southern African countries have enough solar and battery waste for a recycling hub?
Counting panels and battery modules retiring within 150 km of one town, South Africa holds 1,000 tonnes a year from 2028 (Gauteng and the Vaal) and Zambia from 2039. No other SAPP country reaches that in one catchment before 2040, which points to collection and consolidation first, and one or two northern hubs that pool waste across borders.
How were the estimates made?
Every solar and battery project in the regional pipeline is weighted by its chance of being built, then aged with standard retirement curves from IRENA and the IEA. These are estimates with stated assumptions, not forecasts.
Can I get the data or the report?
The map is free to view, and the data is available on request. The full report, "More than one life", is in preparation. Email [email protected].