Research

Grows where the grid hasn’t. Yet.

Mission 300 energy compacts, side by side

Mission 300 aims to connect 300 million people in Africa to electricity by 2030. Each country in it has published a national energy compact. This page puts all 35 published compacts next to each other: what each one commits to, quoted from the compact, beside how many people live near the grid but off it.

35published compacts, from Benin to Zimbabwe
23give a split between grid, mini-grids and standalone solar
4make a commitment on e-waste or end of life
12have a published progress report so far
At a glance

What each compact covers

Green means the compact states it clearly, yellow that it is mentioned, planned or not broken down, and gray that we could not find it. This is a reading guide, not a score: compacts count people, households or connections differently, so the numbers are not compared or ranked.

CountryListedGrid / off-grid splitProductive useE-wasteLeast-cost planMini-grids and grid arrivalProgress reportWithout lightWithin 2 km2-15 kmOver 15 km
BeninSep 2025splitmentionedyesexistsyesnone yet8.2 M3.4 M4.5 M0.3 M
BotswanaSep 2025aggregatedmentionednoplannedmentionednone yet1.5 M0.6 M0.6 M0.3 M
Burkina FasoJun 2026splityesnoexistsmentionednone yet17.2 M4.8 M9.5 M3.0 M
BurundiSep 2025splitmentionedyesexistsyesreported10.3 M3.7 M6.4 M0.1 M
CameroonSep 2025not statedmentionedmentionedplannedyesnone yet17.9 M5.0 M8.2 M4.8 M
Central African RepublicJun 2026splitmentionednoexistsmentionednone yet3.9 M0.6 M0.6 M2.8 M
ChadJan 2025splitmentionednoplannedyesreported15.3 M1.9 M4.5 M9.0 M
ComorosSep 2025splitmentionednoexistsmentionednone yet0.5 M0.0 M0.1 M0.3 M
Cote d'IvoireJan 2025splitmentionednoexistsyesreported14.0 M5.2 M8.3 M0.6 M
DR CongoJan 2025splitmentionednoexistsyesreported75.9 M22.6 M25.3 M28.0 M
EthiopiaSep 2025aggregatedyesnoexistsmentionednone yet95.4 M32.0 M52.0 M11.4 M
GabonJun 2026aggregatedmentionednoplannedyesnone yet1.7 M0.3 M0.9 M0.4 M
GambiaSep 2025not statedmentionednoexistsyesnone yet1.4 M0.5 M0.5 M0.4 M
GhanaSep 2025splityesnoexistsyesnone yet13.1 M7.0 M6.0 M0.1 M
GuineaSep 2025splitmentionednoexistsyesnone yet9.7 M2.9 M5.1 M1.7 M
KenyaSep 2025splityesyesexistsmentionednone yet32.7 M15.0 M12.2 M5.5 M
LesothoSep 2025splityesnoexistsmentionedreported1.5 M0.6 M0.8 M0.1 M
LiberiaJan 2025splitnonoexistsmentionednone yet3.6 M1.1 M1.7 M0.8 M
MadagascarJan 2025splityesnoexistsmentionedreported24.7 M2.4 M4.2 M18.1 M
MalawiJan 2025splitmentionedyesexistsmentionedreported13.9 M5.2 M8.5 M0.3 M
MauritaniaJan 2025splitnonoexistsyesnone yet2.9 M0.5 M0.6 M1.8 M
MozambiqueSep 2025aggregatedmentionednoexistsmentionednone yet22.9 M6.5 M10.9 M5.5 M
NamibiaDec 2025aggregatedmentionednoexistsnot statednone yet1.1 M0.5 M0.5 M0.1 M
NigerJan 2025splityesnoexistsmentionedreported22.0 M4.1 M7.8 M10.1 M
NigeriaJan 2025not statedmentionednoexistsyesreported132.6 M55.9 M68.8 M7.8 M
Republic of CongoSep 2025splitmentionednoplannednot statednone yet3.9 M0.7 M1.6 M1.7 M
RwandaJun 2026aggregatedyesnoexistsmentionednone yet9.5 M4.3 M5.1 M0.0 M
Sao Tome and PrincipeSep 2025not statedyesnoexistsmentionednone yet0.1 M0.0 M0.0 M0.0 M
SenegalJan 2025splityesnoplannedyesreported10.7 M4.1 M4.7 M1.8 M
Sierra LeoneSep 2025splitmentionednoexistsyesnone yet5.3 M1.2 M2.3 M1.8 M
TanzaniaJan 2025aggregatedmentionednoexistsmentionedreported40.1 M13.5 M21.2 M5.4 M
TogoSep 2025splityesnoexistsyesnone yet4.8 M2.7 M2.1 M0.0 M
UgandaJun 2026aggregatedmentionednoexistsyesnone yet35.2 M13.8 M19.3 M2.2 M
ZambiaJan 2025splitmentionedmentionedexistsyesnone yet12.2 M3.8 M6.5 M1.9 M
ZimbabweOct 2025splitmentionednoexistsyesreported10.0 M4.1 M4.8 M1.2 M

Last four columns: people without night-time light from Aloe's grid-edge atlas, in millions, by distance to an existing or predicted power line. Angola, Eswatini and South Africa have no published compact.

Country by country

What each compact says

Short summaries in our words. Every value comes from the compact or its progress report, and the source page for each is shown in the compacts map.

Benin: Mission 300 energy compact

7 of 10 stated

Compact listed Sep 2025 on the World Bank compacts page. Aloe's map: 8.2 M people without night-time light, of whom 3.4 M live within 2 km of a power line, 4.5 M at 2 to 15 km and 0.3 M farther away.

Access target stated
Raise household electricity access from 42.57% (end 2024) to 70% by 2030: about 928,000 additional households (Table 3: 928,228 for 2025-2030), stated average pace about 155,000 households per year.
Grid, mini-grid and standalone solar split
Table 3, planned 2025-2030: grid 777,228; mini-grid 90,000; solar kits 61,000; total 928,228 households (people: 4,313,615 / 499,500 / 338,550; total 5,151,665).
Productive use mentioned
No productive-use target or program figure. The tax-exemption list for the 2026 finance law includes solar dryers and solar pumps; Annex II lists the Dogo bis dam project with irrigation of 15,000 ha (partner project).
E-waste and end of life yes
Annex I commits to an order (arrêté) setting the rules for decommissioning, waste management and rehabilitation of renewable-energy power plant sites (Electricity Code art. 60.8). Covers RE production sites; no measure on off-grid solar products or batteries.
Least-cost or geospatial plan exists
Electricity subsector master plan to 2045 (PDE), National Electrification Strategy (SNE 2021-2026) and an off-grid electrification master plan (PDEHR); DGPER to update PDE and SNE by Q2 2026; geospatial planning listed in the grid digitalization study.
Mini-grids and grid arrival yes
Indicator on a transparent approval process for private mini-grids covering tariffs, licences and their future integration into the national grid (digital concession platform by Q2 2026); existing mechanisms secure EHR investments against progressive grid extension; a prior study will harmonize off-grid plans with grid extension and define concession perimeters. No detailed compensation rules stated.
Clean cooking stated
50% of households using modern clean cooking fuels by 2030 (about 257,000 households per year), from 10.5% in 2021; separate improved-cookstove target of 43% of households by 2030 (from 17.64% in 2015). Commitments: 1,285,000 households with clean cooking solutions and 809,043 with improved stoves by 2030.
Tariffs mentioned
Indicator 'utilities recover at least 100% of operating costs' is addressed through prepaid meters and loss reduction; ARE 2021 tariff methodology cited; last tariff adjustment by decree in 2020; TA study on a cost-adapted tariff model; mini-grid tariff guide planned. No dated cost-reflective tariff commitment.
Private investment stated
Private capital to mobilize: EUR 938.39 million by 2030 (616 billion FCFA), from EUR 167.66 million reference; total financing need EUR 2,362 million (1,550 billion FCFA). Figures are in EUR/FCFA only.
Reported progress none yet
No progress report published yet.

Botswana: Mission 300 energy compact

4 of 10 stated

Compact listed Sep 2025 on the World Bank compacts page. Aloe's map: 1.5 M people without night-time light, of whom 0.6 M live within 2 km of a power line, 0.6 M at 2 to 15 km and 0.3 M farther away.

Access target stated
Universal access: from 76.6% (March 2025) to 100% by 2030, 220,000 new household connections; no annual number stated
Grid, mini-grid and standalone solar aggregated
159,000 grid and 61,000 off-grid household connections by 2030; off-grid total, no mini-grid vs standalone breakdown
Productive use mentioned
Develop a Productive Use Program with financing and business development support for rural entrepreneurs by June 2026; PUE included in the energy access pilot; no quantified target
E-waste and end of life no
No e-waste, battery end-of-life, recycling or take-back measure found
Least-cost or geospatial plan planned
Nationwide geospatial least-cost electrification analysis to be finalized (October 2025) as basis for a National Electrification Action Plan; least-cost generation and transmission plan (IRP, last 2021) to be updated by June 2026
Mini-grids and grid arrival mentioned
Absence of a mini-grid regulatory framework and of a defined grid arrival policy noted as a challenge; commitments cover mini-grid technical standards, not grid arrival
Clean cooking stated
Clean cooking access from 66.6% (2022) to 90% by 2030, 260,000 new households
Tariffs committed
Tariff methodology and performance-based multi-year tariff regime by December 2026, cost of service study, cost-reflective rates for consumers able to pay, social tariff
Private investment stated
Private capital mobilization target given as a range US$646 to 1,570 million (US$0.646-1.57 billion) by 2030, baseline US$54.3 million; total financing need US$2.06-2.98 billion.
Reported progress none yet
No progress report published yet.

Burkina Faso: Mission 300 energy compact

7 of 10 stated

Compact listed Jun 2026 on the World Bank compacts page. Aloe's map: 17.2 M people without night-time light, of whom 4.8 M live within 2 km of a power line, 9.5 M at 2 to 15 km and 3.0 M farther away.

Access target stated
National electrification rate from 34.20% (2024) to 90% by 2030 (Table 5); urban 87.83% to 100%, rural 10.21% to 70.73%; access for 17.9 million new people (6.7 million urban, 11.1 million rural). No annual pace stated.
Grid, mini-grid and standalone solar split
Rural electrification only (Table 5, 2030): grid 70%, mini-grid 25%, SHS 5%; in people: 7.77 million grid, 2.77 million mini-grid type systems, 0.55 million solar systems (individual, collective, semi-collective and street lights). No national split; urban access is grid only.
Productive use yes
More than 3,000 solar systems for productive use of energy to be deployed in rural localities (action plan: 3,000 productive-use solar kits by the private sector); a financial support mechanism for productive uses is planned.
E-waste and end of life no
No e-waste, battery end-of-life or recycling measure found.
Least-cost or geospatial plan exists
Master plan 2022-2040 with a least-cost network development plan, updated in September 2025 (2,643 MW needed by 2030); to be updated annually with a multi-year investment plan; National Rural Electrification Strategy (SNER) 2024-2028; integrated energy GIS platform planned.
Mini-grids and grid arrival mentioned
Rural concession framework (decree 2024-1023 on rural electrification centers), new rural tariff orders (January 2025) including a wholesale tariff for rural network operators, and hybridization of rural mini-grids are discussed; no rules on grid arrival or mini-grid interconnection.
Clean cooking stated
Share of the population using clean cooking fuels and technologies from 10.6% in 2023 to 50% in 2030.
Tariffs committed
Study on electricity sales tariffs along a trajectory toward covering operating costs by 2030; accounting separation of generation, transmission and distribution by end 2025; SONABEL aims to recover 100% of operating costs; Annex 2 states the medium/long-term goal of fully cost-reflective rural tariffs.
Private investment stated
Private financing to mobilize (Table 3, financing needs): USD 5,665,613,651 (= 3,399,368,191 thousand FCFA, the Table 6 target), out of USD 7,785,937,537 total financing need. The summary cites USD 7.4 billion private (Table 1, all projects, total USD 10.39 billion).
Reported progress none yet
No progress report published yet.

Burundi: Mission 300 energy compact

9 of 10 stated

Compact listed Sep 2025 on the World Bank compacts page. Aloe's map: 10.3 M people without night-time light, of whom 3.7 M live within 2 km of a power line, 6.4 M at 2 to 15 km and 0.1 M farther away.

Access target stated
Electricity access from 25.9% (2025; 8% grid, 17.9% decentralized) to 70% by 2030, at 7 percentage points per year. Table 1 objectives: 1.9 million households (9 million people) via grid and 1.2 million households (6 million people) off-grid; no combined total stated.
Grid, mini-grid and standalone solar split
Grid 1.9 million households (9 million people, 60%); off-grid 1.2 million households (6 million people, 40%), of which mini-grids for 410,000 households (over 2 million people) and 850,000 SHS units (about 4 million people). SHS figure is in units, treated as households.
Productive use mentioned
Multi-technology DRE approach described as covering access levels from basic lighting to small-business electrification; no productive-use target or program.
E-waste and end of life yes
By June 2026: adopt an ordinance setting the financing arrangements for the management process of electronic and solar waste (implementing text of the electricity law).
Least-cost or geospatial plan exists
Universal Electricity Access Strategy (SAUE, least-cost, approved October 2024) and the updated generation/transmission master plan 2024-2040 (adoption by December 2025, biennial updates); national rural electrification plan (PNER) to be defined and distribution master plan to be updated.
Mini-grids and grid arrival yes
SAUE prescribes modular mini-grids connectable to the interconnected grid (RI); mini-grid site list to be updated considering grid roll-out (by June 2026); ordinance on rules, ownership, use and classification of off-grid assets; mini-grid tariff methodology. No compensation rules stated.
Clean cooking stated
Clean cooking access to at least 40% of the population by 2030 (5 pp per year; current pace 0.1 pp per year). No baseline percentage in the compact table (MTF 2021: 0.1% use clean-fuel stoves, 6% improved stoves; improved stoves count as clean cooking); the progress report gives a 0.2% baseline.
Tariffs committed
By December 2026: adopt an improved tariff structure with tariffs reflecting operating costs for all consumer categories able to pay, plus a social tariff; by June 2026 AREEN incentive-based regulation and revenue-requirement methodology allowing permanent recovery of operating costs; PPP assets under cost-reflective pricing.
Private investment stated
USD 1.54 billion (44%) from the private sector out of USD 3.49 billion total financing; SAUE reference cites about USD 1.5 billion private of USD 3.1 billion; the progress report restates USD 1,535.6 million.
Reported progress reported
Q1 2026 report (data to 31 December 2025): about 900,000 new people with electricity access in 2025 (baseline 2,700,000; 2030 target 7,729,998 people); clean cooking 0.5% (baseline 0.2%); renewables 85% (83% in 2024); USD 137.1 million private capital mobilized in 2025 of USD 1,535.6 million target; 5 of 123 reform actions completed, 91 in progress, 27 delayed (all 10 priority actions delayed). No connection count reported.

Cameroon: Mission 300 energy compact

5 of 10 stated

Compact listed Sep 2025 on the World Bank compacts page. Aloe's map: 17.9 M people without night-time light, of whom 5.0 M live within 2 km of a power line, 8.2 M at 2 to 15 km and 4.8 M farther away.

Access target stated
Universal access (100%) by 2030 from 74% in 2025, at 5% per year; about 8 million additional people (commitment, p. 6); target table gives 33 million people in total with an average of 1.7 million per year (as stated).
Grid, mini-grid and standalone solar not stated
No connection split by technology; only the financing table splits investment (distribution USD 1,551 million; off-grid mini-grids USD 1,592 million; solar home kits USD 45 million).
Productive use mentioned
Commitment to promote productive uses of energy from 2026 through programs combining access and local development; action plan: consultant in 2026 for a rural productive-use promotion program, developer agreements 2027-2028, construction by 2030. No quantified productive-use target (a 10% increase target covers women-headed households and women-led enterprises with access to energy, clean cooking and productive uses).
E-waste and end of life mentioned
Declaration commits by end 2026 to an incentive regulatory framework for local production and recycling of electrical equipment; the action-plan entry for the same item covers local production and consumption of grid equipment (cables, insulators, poles, transformers) without recycling detail.
Least-cost or geospatial plan planned
Commitment to adopt by end 2026 a least-cost generation, transmission and distribution master plan and a national electrification strategy, building on the PRSEC recovery plan and priority investment plan (2023); existing PDSE and PDER to be updated; geospatial access planning in the digitalization strategy (2028).
Mini-grids and grid arrival yes
Mini-grid code to be adopted by end 2026, including compensation measures for private mini-grid developers when the grid arrives in their area; incentive framework for grid-connected and off-grid private mini-grid infrastructure (titles, tariffs) by 2027.
Clean cooking stated
Clean cooking access to 40% by 2030 from 23.4% in 2022 (ECAM 5); target table: 19.8 million people in total, 2.4 million per year, pace 12.5% per year.
Tariffs committed
Finalize the sector tariff model by end 2025; tariff policy by end 2027; reduce tariff compensation by 6% per year; align MV customer billing to cost of service in 2026 (10% per year adjustments since 2023); sector financial equilibrium by 2028. Tariffs for regulated LV and MV customers frozen since 2012.
Private investment stated
Target table: USD 5.924 billion additional private capital by 2030 (USD 1.185 billion per year), from USD 1.04 billion cumulative 2017-2023. Elsewhere: USD 6.5 billion private of USD 12.5 billion total (preamble, Annex II), USD 6.4 billion private (declaration), and USD 6,372 million private in the financing table (total USD 12,554 million).
Reported progress none yet
No progress report published yet.

Central African Republic: Mission 300 energy compact

6 of 10 stated

Compact listed Jun 2026 on the World Bank compacts page. Aloe's map: 3.9 M people without night-time light, of whom 0.6 M live within 2 km of a power line, 0.6 M at 2 to 15 km and 2.8 M farther away.

Access target stated
Raise national access from 16.8% (2024) to 50% by 2030: gap of about 393,000 households (2,358,000 inhabitants); target pace about 65,491 new households (392,943 people) per year 2025-2030. Headline commitment: about 2.4 million additional people.
Grid, mini-grid and standalone solar split
Table 3, households with access in 2030 (cumulative stock, not new connections): grid extension and densification 247,265; mini-grids 180,000; standalone solar kits and systems 130,000; total 557,265. In inhabitants: 1,483,590 (44%), 1,080,000 (32%), 780,000 (23%).
Productive use mentioned
No productive-use-specific target. Productive use appears inside a combined women-focused indicator (0 to 30% increase in women-led households or enterprises with access to electricity, clean cooking and productive-use technologies) and in a combined USD 59 million off-grid line for household kits and standalone systems for productive activities.
E-waste and end of life no
No e-waste, battery end-of-life, recycling or take-back measure found.
Least-cost or geospatial plan exists
Plan Directeur et Programme d'Investissement pour l'Électrification de la RCA à l'horizon 2040 (finalized 2022); commitment to strengthen planning with geospatial least-cost scenarios (grid, mini-grids, standalone solar); action plan includes updating the generation and transmission master plan and adopting a rural electrification master plan.
Mini-grids and grid arrival mentioned
Mini-grid regulation is a reform axis (revision of the 2005 Electricity Code; regulation on mini-grids planned with a renewable energy law); no provision on grid arrival, interconnection or compensation.
Clean cooking stated
Improved cookstove access from 17% (2024) to 30% by 2030, about 100,000 additional households; Annex I also projects population using modern cooking fuels at 10% by 2030.
Tariffs committed
Action plan includes adoption of a sustainable tariff structure meeting investment and operating needs, with compensation mechanisms for vulnerable households; no date. Tariffs have not been adjusted for three decades.
Private investment stated
Private capital to mobilize by 2030: 314.025 bn FCFA (USD 523 million), 30% of the total financing need of 1,051 bn FCFA (about USD 1.753 bn).
Reported progress none yet
No progress report published yet.

Chad: Mission 300 energy compact

6 of 10 stated

Compact listed Jan 2025 on the World Bank compacts page. Aloe's map: 15.3 M people without night-time light, of whom 1.9 M live within 2 km of a power line, 4.5 M at 2 to 15 km and 9.0 M farther away.

Access target stated
Provide access to more than 14 million additional people by 2030, raising national access from 11% (current) to 90%; target table gives an annual pace of 10-15 for 2025-2030 (unit not printed).
Grid, mini-grid and standalone solar split
National planned access shares (percent of population): grid 50, mini-grids 20, SHS 20, total 90; existing: grid 9, mini-grid/SHS 2.
Productive use mentioned
Productive uses (solar irrigation, cold storage) cited only within the description of the regional ROGEP partner project in Annex I; no compact target.
E-waste and end of life no
No e-waste, battery end-of-life, recycling or take-back measure found.
Least-cost or geospatial plan planned
Comprehensive least-cost power development plan to be prepared and adopted by 2026 (action table: finalized in H1 2026, prepared under World Bank budget support); the Priority Investment Plan (PIP) already identified least-cost generation expansion; electricity master plan (2012) and renewable energy master plan (2018) to be updated, validation in 2026.
Mini-grids and grid arrival yes
Commitment to establish by end-2025, under Law 036/19, a clearly defined regulatory approval process for private mini-grids including licensing, tariffs and grid integration (indicator wording: arrival/integration of the grid).
Clean cooking stated
Accelerate clean cooking access at 5% per year to reach 46% in 2030, about 5.5 million additional households; baseline not stated in the compact.
Tariffs mentioned
Tariff policy dates from 2012 and a study for a new tariff is under way; absence of cost-reflective pricing listed as a SNE weakness; SNE targets 100% bill collection by 2028. No dated tariff adjustment commitment.
Private investment stated
Target table: private capital to mobilize by 2030 of USD 378 million for national electrification and USD 946 million for generation; Annex II states total private investment need of USD 1,324 million. The financing table and commitments state USD 650.3 million (650,256,000) of private investment within a total need of USD 1.95 bn.
Reported progress reported
806,257 additional people connected in 2025 (2023 baseline 2,010,642 people; target +14,000,000); clean cooking extended to 24,274 additional people (no percentage yet); renewable share 31% in 2025 (baseline 9%, target 30%); no private capital mobilized to date vs USD 1.324 bn target; of 14 reform actions, 2 completed, 11 in progress, 1 delayed.

Comoros: Mission 300 energy compact

6 of 10 stated

Compact listed Sep 2025 on the World Bank compacts page. Aloe's map: 0.5 M people without night-time light, of whom 0.0 M live within 2 km of a power line, 0.1 M at 2 to 15 km and 0.3 M farther away.

Access target stated
100% access by 2030 on all 3 islands; 12,462 new connections/year 2025-2030 (62,310 households; Table 1: 311,550 people); no national baseline, island rates 95% Grande Comore, 49% Anjouan, 87% Moheli
Grid, mini-grid and standalone solar split
Table 1 (people to connect 2025-2030): SONELEC extension/densification 243,009, mini-grids 43,617, solar kits 24,924; target table: 78% SONELEC grid (9,720/yr), 14% mini-grids (1,745/yr), 8% off-grid (997/yr)
Productive use mentioned
Commitment to integrate productive use planning into the national electrification strategy and plan; no quantified target
E-waste and end of life no
No e-waste, battery end-of-life, recycling or take-back measure found
Least-cost or geospatial plan exists
Least-cost development plan (PDMC, 2024, covering 2024-2043); geospatial least-cost electrification analysis in preparation; national electrification plan and strategy to be prepared by December 2025
Mini-grids and grid arrival mentioned
Draft decree on self-generation and mini-grids, Electricity Code article 50 on mini-grids in areas without grid access, standard concession contract for large mini-grids by end 2026; no rules on grid arrival or interconnection found
Clean cooking stated
30% access to improved and clean cooking by 2030 from about 0.5%, at 6% per year
Tariffs committed
Progressive tariff reform from 2026; tariff methodology (multi-year regime) by June 2026; roadmap to phase out subsidies by June 2026 and fully cost-covering tariffs by 2030
Private investment stated
USD 273 million from the private sector (70%) within a total financing need of USD 390 million (USD 117 million from development partners and government); baseline USD 21 million (2019-2021)
Reported progress none yet
No progress report published yet.

Cote d'Ivoire: Mission 300 energy compact

8 of 10 stated

Compact listed Jan 2025 on the World Bank compacts page. Aloe's map: 14.0 M people without night-time light, of whom 5.2 M live within 2 km of a power line, 8.3 M at 2 to 15 km and 0.6 M farther away.

Access target stated
Service coverage rate (households connected / total households) from 64% at end-2023 (4,040,965 households, about 20 million people) to 100% in 2030 (7,107,077 households, about 37 million people): about 17 million additional people; pace about 550,000 households per year 2025-2027 and 400,000 per year 2028-2030.
Grid, mini-grid and standalone solar split
Table 3, planned additional inhabitants by 2030: grid 11.2 million; mini-grids 3.2 million; solar kits 2.6 million; total 37 million in 2030 including 20 million existing grid (2023). Existing mini-grid 26,198 (2023); existing kits NA. Projections subject to ongoing studies.
Productive use mentioned
No productive-use target or program in the compact commitments; only partner-project details in Annex I (PROSER Phase I installing 1,088 mills for women's and youth organizations; PEPT professional connections, 25% for women farmer organizations).
E-waste and end of life no
No e-waste, battery end-of-life, recycling or take-back measure found.
Least-cost or geospatial plan exists
Five new master plans for 2022-2040: Production and Transmission (PDPT), Grand Abidjan distribution (PDDGA) and interior towns distribution (PDDVI) finalized in 2023; Automation/Smart Grid (PDAT-SG) and Rural Network Extension (PDELR) to be finalized end-2025; Off-Grid Electrification Master Plan (PDEHR) by end-2025.
Mini-grids and grid arrival yes
Commitment to develop by end-2025 a streamlined review and approval process for private mini-grid developers including licenses, tariffs and grid integration; mini-grid regulatory texts to be revised in 2025. Progress report lists the mini-grid regulation action (deadline 31 Dec 2025) as delayed.
Clean cooking stated
Households using modern cooking fuels (butane, biogas, biochar) from about 20% (butane, 2023) to 50% by 2030, about 2.4 million additional households; improved cookstoves 16% of population by 2030 (9% in 2021).
Tariffs committed
Commitment to adopt by end of H1 2025 a comprehensive plan for the sector's financial recovery, continuing convergence of tariffs toward real costs (tariff structure optimization, regular tariff adjustments). Progress report lists both related priority actions as delayed.
Private investment stated
Private capital to mobilize 2024-2030: 1,177 bn FCFA (USD 1,940 million) for generation and off-grid electrification (headline about USD 2 bn). Total financing need USD 15.02 bn, of which USD 6.56 bn remains to be financed.
Reported progress reported
684,735 new household connections in 2025 (about 3,560,622 people at 5.2 per household; 2024 baseline 23,857,350 people; target +17,000,000); clean cooking estimated at 41% (pending MTF survey); renewables 34% of installed capacity (32.8% in table); private capital USD 882 million in 2024 and about USD 270 million in 2025 (preliminary) vs USD 1.940 bn target; of 23 reform actions, 4 completed, 13 in progress, 6 delayed.

DR Congo: Mission 300 energy compact

8 of 10 stated

Compact listed Jan 2025 on the World Bank compacts page. Aloe's map: 75.9 M people without night-time light, of whom 22.6 M live within 2 km of a power line, 25.3 M at 2 to 15 km and 28.0 M farther away.

Access target stated
Raise access from 21.5% (2024) to at least 62% by 2030: 60 million additional people, average 12 million per year (as stated in the target table).
Grid, mini-grid and standalone solar split
Table of existing (2022) and planned connections to 2030, national row: planned grid 15,499,000; planned mini-grids 19,919,000; SHS 79,000; total (planned) 57,325,000 (62%). Labeled 'connexions' though figures are at population scale. Unit recorded as people: the national figures match population shares (existing grid 21,219,000 = 20.5%), though the table is labeled connexions. The planned SHS figure is printed as 79,000.
Productive use mentioned
Productive uses of energy (UPE) listed among eligible uses of an expanded RBF/Mwinda Fund (USD 500 million to 1 billion) and USD 200 million revolving credit line; no productive-use-specific target.
E-waste and end of life no
No e-waste, battery end-of-life or recycling provisions found.
Least-cost or geospatial plan exists
National geospatial electrification plan (2022, MRHE) exists; an integrated least-cost resource development plan and power system master plan to be adopted by end-2025.
Mini-grids and grid arrival yes
Revision of the 2014 Electricity Law and rural electrification tariff policy to cover licensing, tariffs and grid arrival/integration for mini-grids (by end-2025).
Clean cooking stated
Clean cooking access from 1% to 30% by 2030 (5% per year), 40 million people (5 million households).
Tariffs committed
Cost-covering tariff regime for SNEL by January 2026; 100% operational cost recovery by 2029 through gradual tariff adjustments.
Private investment stated
USD 20 billion private investment to mobilize (generation, networks, DRE, clean cooking), out of about USD 37 billion total financing (about USD 17 billion public).
Reported progress reported
2025: 652,000 additional people gained access (2024 baseline 23,415,650 people); about USD 650 million private capital mobilized; clean cooking about 1%; renewables 95%; of 44 reform actions, 0 completed, 30 in progress, 14 delayed.

Ethiopia: Mission 300 energy compact

6 of 10 stated

Compact listed Sep 2025 on the World Bank compacts page. Aloe's map: 95.4 M people without night-time light, of whom 32.0 M live within 2 km of a power line, 52.0 M at 2 to 15 km and 11.4 M farther away.

Access target stated
Basic electricity access (Tier 1 and above) from 44% to 75% of the population by 2030 (70% grid, 30% off-grid); more than 9.23 million additional households, about 9.23 million new and regularized connections over 2026-2030. Per-year figure computed (9.23 million / 5 years); stated financing-gap pace is roughly 1.25 million per year.
Grid, mini-grid and standalone solar aggregated
Annex IV target table 2026-2030: 6,460,000 new grid connections and 2,770,000 off-grid connections (mini-grid + SHS combined), total 9,230,000. Share split stated as 70% grid / 30% off-grid. Only the compact-financed gap is broken down by technology: mini-grids 870,000 and SHS 990,000 households.
Productive use yes
Productive Use of Energy penetration target from below 2% (2025) to at least 50% by 2030, transitioning small-scale irrigation from diesel to solar pumps; PUE pilots for irrigation 2026-2028, national scale-up 2028-2030.
E-waste and end of life no
No reference to e-waste, battery or solar end-of-life management, recycling, take-back or EPR found.
Least-cost or geospatial plan exists
National Electrification Program (NEP) guides access implementation; Integrated Resource Plan (IRP) for least-cost power system planning to be finalized by mid-2025 and updated every 4 years; National Electrification Strategy and NEP 3.0 to be developed (2025).
Mini-grids and grid arrival mentioned
Mini-grid licensing, quality standards and subsidy mechanisms described as still under development; commitment to reform off-grid policies, standards and subsidies. No grid-arrival or interconnection rules for mini-grids.
Clean cooking stated
Clean cooking access from 8% to at least 57.74% of the population by 2030 under the National Clean Cooking Roadmap.
Tariffs committed
EEP and EEU to reach full cost recovery (OPEX + debt service) by 2028 through phased tariff adjustments; baseline below 60% cost recovery; PSO-based targeted subsidy for vulnerable households.
Private investment stated
At least USD 3.06 billion private capital to be mobilized by 2030 (baseline about USD 0.5 billion), out of USD 9.646 billion indicative total funding needs 2026-2030.
Reported progress none yet
No progress report published yet.

Gabon: Mission 300 energy compact

5 of 10 stated

Compact listed Jun 2026 on the World Bank compacts page. Aloe's map: 1.7 M people without night-time light, of whom 0.3 M live within 2 km of a power line, 0.9 M at 2 to 15 km and 0.4 M farther away.

Access target stated
Access above 95% by 2030 from 92.7% (EDSG-III 2019-2021, shown as 2023 existing in the target table), via about 87,500 new households (~347,000 people) plus regularization of about 500,000 uncounted users; no annual targets stated.
Grid, mini-grid and standalone solar aggregated
Target table combines grid and mini-grids (national 95%, rural 54% by 2030) and gives SHS separately (national 0.1%, rural 7%); total 95% national, 61% rural. Standalone records the SHS share only; no grid vs mini-grid breakdown.
Productive use mentioned
Productive use discussed without a target: demand anchors including productive use in mini-grid business plans, 500 km of MV/LV lines around agricultural hubs by 2030, competitive energy for industry and mining.
E-waste and end of life no
No reference to e-waste, battery or solar end-of-life management, recycling, take-back or EPR found.
Least-cost or geospatial plan planned
Commitment to update the Production-Transport-Distribution Master Plan (to 2045, studies under PASBAP, delivery planned September 2026) and to build a least-cost rural electrification master plan (geospatial mapping 2026, plan by 2027); a georeferenced electrification plan is under validation and an existing electrification master plan is not fully operational.
Mini-grids and grid arrival yes
Proposed compensation clause in the implementing texts of Law 12/2023 for private mini-grid concessions when the public grid extends into the concession area (financial indemnity on residual value, concession extension, tariff adjustment, equivalent area, or asset integration/buy-back); specific mini-grid approval process covering grid arrival/integration to be developed in 2026.
Clean cooking stated
Clean cooking access from about 90% to 99% by 2030, mainly via LPG, improved cookstoves and biogas; national clean cooking strategy to be adopted in 2026.
Tariffs committed
Tariffs frozen since October 2018; commitment to a gradual tariff reform bringing tariffs toward the real cost of service with a tariff compensation mechanism and protection of vulnerable households; 2026 tariff diagnostic and resumption of adjustments; utilities to recover at least 80% of operating costs before 2030.
Private investment stated
USD 2 billion private capital to be mobilized (2,008 MUSD in the financing table) out of USD 4.169 billion total financing needs 2026-2030 (2,161 MUSD public).
Reported progress none yet
No progress report published yet.

Gambia: Mission 300 energy compact

6 of 10 stated

Compact listed Sep 2025 on the World Bank compacts page. Aloe's map: 1.4 M people without night-time light, of whom 0.5 M live within 2 km of a power line, 0.5 M at 2 to 15 km and 0.4 M farther away.

Access target stated
Universal access (100%) by 2030 from 73.7% (2024), for an additional 633,000 people; historical pace about 20,000 household connections per year; no annual target stated.
Grid, mini-grid and standalone solar not stated
No grid / mini-grid / standalone breakdown of the target. Strategy is grid-led (over 99% of current connections on-grid), with limited mini-grids at identified sites; off-grid funding need USD 3 million.
Productive use mentioned
Only as a cross-cutting Annex III indicator on access to productive use technologies for female-headed households and women-led enterprises, data marked TBD; no target or program.
E-waste and end of life no
No reference to e-waste, battery or solar end-of-life management, recycling, take-back or EPR found.
Least-cost or geospatial plan exists
Least Cost Power Development Plan (LCPDP 2021-40) and Electricity Sub-Sector Strategic Roadmap (2021-2040), to be updated by December 2025, with geospatial analytics added by December 2026; 2021 Universal Access Study to be updated into a new universal access plan with GIS mapping.
Mini-grids and grid arrival yes
Green mini-grid policy and regulations provide safety and exit mechanisms upon arrival of the main grid; Green Mini Grid Regulations approved covering licensing, tariffs and grid entry/integration; Renewable Energy Act review by 2026 on mini-grid tariff mismatches.
Clean cooking stated
Clean cooking access from 25% to 50% by 2030, anchored on a clean cooking strategy to be developed by June 2026.
Tariffs committed
Cost of supply study to set tariffs for full cost recovery; subsidy policy to state the timeframe (e.g. 5 years) to full cost-reflectivity; periodic pass-through of non-controllable costs and a firm calendar for tariff reviews. No target year for cost recovery.
Private investment stated
USD 247 million private sector investment to be mobilized (solar parks + BESS and clean cooking), out of USD 552 million total funding needs by 2030 (USD 305 million public).
Reported progress none yet
No progress report published yet.

Ghana: Mission 300 energy compact

8 of 10 stated

Compact listed Sep 2025 on the World Bank compacts page. Aloe's map: 13.1 M people without night-time light, of whom 7.0 M live within 2 km of a power line, 6.0 M at 2 to 15 km and 0.1 M farther away.

Access target stated
Electricity access from 89% (2024) to 99% by 2030 via grid extension covering 660,000 new households and 400 mini-grids for 250,000 households; no combined connection total or annual pace stated.
Grid, mini-grid and standalone solar split
Target table: grid extension 660,000 new households; 400 mini-grids for 250,000 households. No standalone/SHS household target in the main table; SHS figures elsewhere are 1,450 additional SHS by 2028 (action plan) and 1,000,000 SHS by 2030 (Annex III).
Productive use yes
PUE areas named: solar-powered irrigation (Energy-Water-Food Nexus) and Energy for Small Scale Businesses, where Government and partners fund 80% of solar PV projects and businesses repay 20% over 12 months; MoEnGT to develop an approach to enhance PUE by end-2026. No quantified PUE uptake target.
E-waste and end of life no
No reference to e-waste, battery or solar end-of-life management, recycling, take-back or EPR found.
Least-cost or geospatial plan exists
Integrated Power Sector Master Plan (IPSMP, 2023 edition published) to be updated (2026 IPSMP by December 2025, 2029 IPSMP by December 2028); National Electrification Scheme (NES); geospatial planning platform for last-mile electrification by end-2026.
Mini-grids and grid arrival yes
Commitment to establish technical standards for future grid interconnections creating bankable DRE asset classes (DRE generally, not mini-grid specific); National Mini Grid Policy mainstreamed into NES and PURC mini-grid tariff policy for OPEX viability by end-2026.
Clean cooking stated
Clean cooking access from 36.9% to 50% by 2030, driven primarily by LPG adoption; distribution of 5 million improved cookstoves by 2030.
Tariffs committed
Full cost-recovery tariffs by 2027 through the MYTO framework with quarterly adjustments to close an 18% tariff gap; 2025 MYTO by December 2025; cost-of-service studies by 2026; lifeline tariff to be replaced by targeted subsidies.
Private investment stated
Target table: USD 2 billion private capital mobilized (2025-2030). Investment plan: USD 2.6 billion (2,611 million) private-led financing out of USD 4.4 billion (4,404 million) total need.
Reported progress none yet
No progress report published yet.

Guinea: Mission 300 energy compact

7 of 10 stated

Compact listed Sep 2025 on the World Bank compacts page. Aloe's map: 9.7 M people without night-time light, of whom 2.9 M live within 2 km of a power line, 5.1 M at 2 to 15 km and 1.7 M farther away.

Access target stated
Universal access (100%) by 2030 from 53% (2024): 7.75 million additional people, at a stated average pace of 1.55 million people electrified per year.
Grid, mini-grid and standalone solar split
Additional access by 2030 (people): grid extension 5.5 million, mini-grids 784,000, solar kits 1.46 million, total 7.75 million; also expressed as 71% grid, 10% mini-grid, 19% solar kits.
Productive use mentioned
Income-generating activities through multifunctional platforms (women's cooperatives, tailors, welders, IT centers) cited alongside job estimates; no productive-use target or dedicated program.
E-waste and end of life no
No reference to e-waste, battery or solar end-of-life, recycling or take-back found.
Least-cost or geospatial plan exists
Least-cost generation, transmission and distribution master plan (PDPT 2019-2035, to be updated by end Q1 2026) and the Plan/Programme National d'Electrification Rurale (validated July 2023) with geospatial analysis of 7,063 localities.
Mini-grids and grid arrival yes
Commitment to establish, during Q1 2026, a clearly defined regulatory approval process for private-sector mini-grids covering authorizations, tariffs and grid integration; no detailed grid-arrival rules stated.
Clean cooking stated
Clean cooking access from 12% to 35% by 2030 (4.1 million additional people): butane for 20% of households (474,000) and improved stoves for 15% (355,000).
Tariffs committed
Tariff adjustment plan with 12% annual increases 2025-2030 (97.38% cumulative) and losses cut from 30% to 8%; sector financial equilibrium targeted by 2029/2030; joint orders signed in 2024 to apply from Q4 2025.
Private investment stated
US$7.6 billion private investment to mobilize by 2030 (Table 1 remaining private: US$7,641 million), out of US$8.9 billion to mobilize (US$11.465 billion total need). Baseline private capital US$2.5 billion.
Reported progress none yet
No progress report published yet.

Kenya: Mission 300 energy compact

8 of 10 stated

Compact listed Sep 2025 on the World Bank compacts page. Aloe's map: 32.7 M people without night-time light, of whom 15.0 M live within 2 km of a power line, 12.2 M at 2 to 15 km and 5.5 M farther away.

Access target stated
Universal access (100%) by 2030 from 75% (2024) by connecting an additional 5.1 million households (to 15 million). Stated paces: above 980,000 on-grid and up to 400,000 mini-grid/stand-alone connections per year; no combined annual figure stated.
Grid, mini-grid and standalone solar split
KNES 2025 roadmap (households): grid densification 4,002,187 (78.5%), grid intensification 567,917 (11%), grid extension 320,278 (6.3%), mini-grids 199,048 (4.9%), standalone PV 11,000 systems connecting 10,748 households (0.22%). Aloe: grid total 4,890,382 computed as the sum of the three stated grid parts.
Productive use yes
Kenya National PUE Strategy to be finalized by June 2026; Annex III budgets US$50 million for PUE strategy implementation (solarization of boreholes, cold storage) within a US$1,940 million DRE, PUE and EE line; National PUE Roadmap adopted 2023.
E-waste and end of life yes
Annex III budgets US$2 million to establish an end-of-life management framework for cooking devices; KNeCS enabling-environment actions include end-of-life (EoL) management. No solar or battery e-waste measure found.
Least-cost or geospatial plan exists
Kenya National Electrification Strategy (KNES 2025) roadmap based on the Least Cost Electrification Plan; Integrated National Energy Plan (INEP) framework and regulations to be operationalized.
Mini-grids and grid arrival mentioned
Commitments to finalize, gazette and operationalize mini-grid regulations and adopt a uniform national tariff for grid and mini-grid customers; no grid-arrival, interconnection or compensation rules stated.
Clean cooking stated
Clean cooking access from 34.4% (KNBS 2023-2024) to 100% by 2030; an additional 10.2 million households to reach 15 million households.
Tariffs committed
Cost-of-service study by FY 2025/26 and tariff review order for 2026-2029 by April 2026; tariff reviews every three years for cost-reflective tariffs.
Private investment stated
US$5.1 billion private-sector financing (Table 1: US$5,113 million) within US$19.1 billion total additional financing; declaration targets private capital rising from US$2.1 billion to over US$5 billion.
Reported progress none yet
No progress report published yet.

Lesotho: Mission 300 energy compact

8 of 10 stated

Compact listed Sep 2025 on the World Bank compacts page. Aloe's map: 1.5 M people without night-time light, of whom 0.6 M live within 2 km of a power line, 0.8 M at 2 to 15 km and 0.1 M farther away.

Access target stated
Raise national electricity connectivity from 53% to 100% by 2030 through 45,300 new connections per year (26,400 grid, 18,900 off-grid); no total stated
Grid, mini-grid and standalone solar split
Per year: 26,400 grid, 688 mini-grid and 18,212 off-grid solar household connections (solar lantern, DIY kit, AC SHS)
Productive use yes
PUE program to be developed (market assessment Nov 2025, PUE strategy 2026-2030); Annex II budgets US$10 million for PUE promotion in rural mini-grid areas; no quantified PUE output target
E-waste and end of life no
No e-waste, battery end-of-life, recycling or take-back measure found
Least-cost or geospatial plan exists
Least Cost Power Development Plan (LCPDP, draft, to be adopted by October 2025) feeding the Electrification Master Plan 2018-2038 and the National Electrification Strategy; IRP to be developed by March 2026
Mini-grids and grid arrival mentioned
Review and update of Mini-Grid Power Generation, Distribution and Supply Regulations 2021 by December 2025 (licensing, tariffs); no grid-arrival or interconnection provision stated
Clean cooking stated
Clean cooking and heating from 45.2% to 75% of households by 2030 (MTF Tier 2 and above)
Tariffs committed
Cost-of-service study by March 2026, automatic multi-annual tariff review mechanism (bi-annually from May 2026) for cost-reflective tariffs, lifeline tariff framework
Private investment stated
US$1.47 billion from the private sector (table: US$1,470.5 million) within total financing of US$1.97 billion, mostly generation (US$1,343 million)
Reported progress reported
17,856 people with new electricity access in 2025 (2024 baseline 1,124,482 people; target +1,067,874 people); clean cooking 45.2%; renewable share 99.6%; private capital +USD 138 million (total 158 million); LCPDP and NES adoption completed; 6 of 61 actions completed, 38 delayed

Liberia: Mission 300 energy compact

5 of 10 stated

Compact listed Jan 2025 on the World Bank compacts page. Aloe's map: 3.6 M people without night-time light, of whom 1.1 M live within 2 km of a power line, 1.7 M at 2 to 15 km and 0.8 M farther away.

Access target stated
At least 75% national access by 2030 from 32.7%, by raising the pace to 100,000 households per year (from about 70,000); no cumulative connection total stated.
Grid, mini-grid and standalone solar split
Annual pace (households per year, average): about 60,000 grid, 15,000 mini-grid, 25,000 off-grid/solar home systems, totaling 100,000 per year. Figures are per year, not cumulative.
Productive use no
No productive-use discussion, target or program found; only passing references to powering businesses and an Annex I EnDev entry listing small and medium-sized enterprises among beneficiaries.
E-waste and end of life no
No reference to e-waste, battery or solar end-of-life, recycling or take-back found.
Least-cost or geospatial plan exists
2020 National Electrification Strategy (NES) identifies least-cost options (grid for 70% of households, mini-grids/standalone for 30%); NES to be updated with a five-year electrification plan by 2026; a comprehensive integrated least-cost power system master plan to be developed by June 2026.
Mini-grids and grid arrival mentioned
Mini-grid policy framework and regulations are in place; LERC to issue guidelines streamlining approval of private-sector-led mini-grids by September 2025. No grid-arrival, interconnection or compensation provisions found.
Clean cooking mentioned
No clean cooking target; a national clean cooking strategy (by December 2025 in the target table, by 2026 in the action plan) is to set the baseline and targets. Current figure given as 9,545 (0.8% of population).
Tariffs committed
Multi-year cost-reflective tariff adjustment mechanism; LEC multi-year tariff filing with regulatory approval expected by June 2025; LEC revenue to exceed operating costs in FY 2028.
Private investment stated
US$150 million private investment to be mobilized (US$80 million mini- and off-grid, US$70 million utility-scale solar PV), within US$1.25 billion total financing to be mobilized.
Reported progress none yet
No progress report published yet.

Madagascar: Mission 300 energy compact

8 of 10 stated

Compact listed Jan 2025 on the World Bank compacts page. Aloe's map: 24.7 M people without night-time light, of whom 2.4 M live within 2 km of a power line, 4.2 M at 2 to 15 km and 18.1 M farther away.

Access target stated
80% access by 2030 from 36% in 2022; 3.5 million new connections (17.7 million people) 2023-2030; 437,500 connections/year computed from total over 2023-2030 (compact states 2.2 million people/year)
Grid, mini-grid and standalone solar split
Table 1 (people served 2023-2030): grid extension/densification 3.54M, mini-grids and nano-grids 7.08M, solar kits 7.08M; target table gives connections only as 20% JIRAMA (0.7M) vs 80% SHS/nano/mini/metro-grids (2.8M)
Productive use yes
Compact commits to integrate productive use planning into the national electrification strategy and plan (no target); Annex I lists AFD ANGOVO rural electrification project with at least 3,000 productive activities
E-waste and end of life no
No e-waste, battery end-of-life, recycling or take-back measure found
Least-cost or geospatial plan exists
Least-cost development plan (PDMC, 2022), geospatial least-cost electrification analysis (GLCEP, 2021) and SEforALL Integrated Energy Plan (PEI, 2024); commits to update PDMC and adopt a national generation and grid plan by December 2025 and a national electrification strategy and plan by 2026
Mini-grids and grid arrival mentioned
Revised mini-grid regulations, simplified approval and a standard concession contract for large mini-grids by end 2025/2026; no rules on grid arrival, interconnection or compensation found
Clean cooking stated
50% access to improved and clean cooking by 2030 from 14% in 2022 (0.8 million households); 3.5 million households (18 million people) by 2030, 450,000 households/year
Tariffs committed
Tariff methodology (multi-year regime) and initial application by December 2025; roadmap to phase out subsidies for customers able to pay by June 2025; fully cost-covering tariffs by 2030
Private investment stated
About USD 4.6 bn private capital to mobilize by 2030 (baseline about USD 1.4 bn), within a total financing need of about USD 7.2 bn with USD 2 bn from development partners and USD 0.6 bn from government
Reported progress reported
No 2025 data yet for people provided with electricity, clean cooking or private capital; RE share of on-grid generation 51% in 2025 (baseline 45%, target 85%); 5 of 43 reform actions completed as of January 2026

Malawi: Mission 300 energy compact

8 of 10 stated

Compact listed Jan 2025 on the World Bank compacts page. Aloe's map: 13.9 M people without night-time light, of whom 5.2 M live within 2 km of a power line, 8.5 M at 2 to 15 km and 0.3 M farther away.

Access target stated
Increase access from 25.9% to 70% by 2030, requiring 1.15 million additional on-grid and 1.55 million off-grid connections (no combined total stated). Stated paces: 230,000 grid, 244,000 SHS and 13,600 mini-grid households per year.
Grid, mini-grid and standalone solar split
Table 1 2030 access shares: grid 30.1%, mini-grid 2.6%, solar systems and others 37.4% (off-grid total 40.0%). In connections: 1.15 million on-grid and 1.55 million off-grid (off-grid not split by mini-grid vs SHS).
Productive use mentioned
Encourage productive use of energy to improve off-grid viability; energy for agricultural mechanization under the ATM+M strategy; no productive-use target.
E-waste and end of life yes
Derive e-waste management guidelines for off-grid solar and batteries from the 2024 National E-waste Management Policy (target 2025), alongside SHS standards.
Least-cost or geospatial plan exists
Integrated Energy Planning (IEP) geospatial tool used for least-cost electrification planning (update to be completed 2024-2025); Integrated Resource Plan (2022 IRP) for power system.
Mini-grids and grid arrival mentioned
Mini-Grid Regulatory Framework referenced; financial support for compliant mini-grids and concessional agreements with developers; no grid-arrival or interconnection provisions.
Clean cooking stated
Households with access to clean cooking from 24.5% (2023) to 75% by 2030 (Table 2); clean cooking includes advanced woodstoves.
Tariffs committed
Secure a cost-reflective tariff for the next four years; enforce approved tariff schedules and the automatic tariff adjustment mechanism (ATAF), 2025-2027.
Private investment stated
Table 4 Private Capital Targets shows USD 1,622.8 million in the 2030 column (of which grid USD 1,593.4 million); yearly columns from 2025, cumulative status not stated. Total financing need USD 5.5 billion to 2030.
Reported progress reported
Progress to 31 December 2025: no updated quantitative data provided; of 68 reform actions, 12 completed, 28 in progress, 28 delayed.

Mauritania: Mission 300 energy compact

6 of 10 stated

Compact listed Jan 2025 on the World Bank compacts page. Aloe's map: 2.9 M people without night-time light, of whom 0.5 M live within 2 km of a power line, 0.6 M at 2 to 15 km and 1.8 M farther away.

Access target stated
Universal access (100%) by 2030 from 55%: 3.4 million additional people (3,389,524 in the access table). Annual figures appear only in a chart; no annual pace stated in text.
Grid, mini-grid and standalone solar split
Access table (people): ongoing projects 1,252,229 grid and 104,733 mini-grid; projects in prospect 978,358 grid, 618,955 mini-grid and 435,249 SHS; total 3,389,524. Fields record the 'in prospect' (gap) columns; text gives the gap as 2,032,562 people, 978,358 grid and 1,054,204 DRE.
Productive use no
No productive-use target, program or discussion found.
E-waste and end of life no
No reference to e-waste, battery or solar end-of-life, recycling or take-back found (waste references concern waste-to-energy and biogas feedstock).
Least-cost or geospatial plan exists
National least-cost electrification strategy (2022, META program) with action plan to 2030, and Schéma Directeur de Production et de Transport to 2040 (Artelia 2023); integrated least-cost planning not yet adopted (baseline 'Non').
Mini-grids and grid arrival yes
Clearly defined regulatory approval process for private-sector mini-grids, including licences, tariffs and grid integration, put in place in 2024 and applied in the RIMDIR/PERSEM pilot; no detailed grid-arrival rules stated.
Clean cooking stated
Accelerate clean cooking access at 12% per year (from about 4% currently), reaching 0.48 million additional households; national clean cooking strategy due in 2025. No 2030 percentage target; access estimated at 54% in 2023.
Tariffs mentioned
No tariff reform commitment; financial viability of SOMELEC by 2030 to come from fuel switching (natural gas, solar PV) and operational performance; alternatives to tariff increases discussed; current tariffs listed in Annex II.
Private investment stated
US$1.23 billion (1,225.8 M$) private investment to mobilize, 50% of the US$2,446.06 million financing gap (total need US$3,067.3 million).
Reported progress none yet
No progress report published yet.

Mozambique: Mission 300 energy compact

5 of 10 stated

Compact listed Sep 2025 on the World Bank compacts page. Aloe's map: 22.9 M people without night-time light, of whom 6.5 M live within 2 km of a power line, 10.9 M at 2 to 15 km and 5.5 M farther away.

Access target stated
From 60.1% (2024) to 100% by 2030; 4.9 million new connections, stated as 423k on-grid and 435k off-grid new connections per year (no single annual figure stated)
Grid, mini-grid and standalone solar aggregated
Target table: 71% on-grid, 29% off-grid (no mini-grid vs standalone breakdown in the target)
Productive use mentioned
Commitment to assess productive use potential (2026) and include productive uses in the updated NES (2027); no quantified target
E-waste and end of life no
No reference to e-waste, battery or solar end-of-life, recycling or take-back found
Least-cost or geospatial plan exists
Integrated Energy Access Plan (geospatial least cost analysis; preliminary results used for targets, to be finalized 2026); existing Least-Cost Electrification Plan and Power Master Plan to be updated
Mini-grids and grid arrival mentioned
Mini-Grid Country Platform (2025) and operationalization of off-grid regulations (Resolution 56/2022); no grid-arrival or interconnection rules for mini-grids
Clean cooking stated
From 17% (14% LPG, 3.4% other) to around 54% by 2030 (23% LPG, 31% other technologies)
Tariffs committed
Implement the cost-reflective tariff methodology approved in 2022, with periodic tariff adjustments (2026), while protecting low-income consumers
Private investment stated
Private capital to be mobilized: US$8,698 million (target table, by 2030); total financing need US$18,620 million
Reported progress none yet
No progress report published yet.

Namibia: Mission 300 energy compact

5 of 10 stated

Compact listed Dec 2025 on the World Bank compacts page. Aloe's map: 1.1 M people without night-time light, of whom 0.5 M live within 2 km of a power line, 0.5 M at 2 to 15 km and 0.1 M farther away.

Access target stated
From 59.5% (2023) to 70% by 2030; 210,000 new household connections by 2030 (universal access targeted by 2040)
Grid, mini-grid and standalone solar aggregated
175,000 grid and 35,000 off-grid household connections (no mini-grid vs standalone breakdown)
Productive use mentioned
Commitment to develop a Productive Use Program and prioritize PUE (solar water pumping, agricultural processing); no quantified target
E-waste and end of life no
No reference to e-waste, battery or solar end-of-life, recycling or take-back found
Least-cost or geospatial plan exists
Geospatial Least Cost Electrification Plan (GLCEP); NIRP 2022, to be updated as a least cost National Integrated Resource (Master) Plan by 2026
Mini-grids and grid arrival not stated
No mini-grid regulation or grid-arrival rules; mini-grids appear only as an opportunity and in an off-grid pilot
Clean cooking stated
From 48.5% (2023) to 61% by 2030; clean cooking for 200,000 households by 2030
Tariffs committed
Adopt a multi-year performance-based regulation (PBR) regime by 2026/2027; tariffs described as already cost-reflective (cost-plus)
Private investment stated
Private capital to be mobilized: US$411 million by 2030 (baseline US$156 million); total financing need US$1,764 million excluding Baynes Hydro
Reported progress none yet
No progress report published yet.

Niger: Mission 300 energy compact

8 of 10 stated

Compact listed Jan 2025 on the World Bank compacts page. Aloe's map: 22.0 M people without night-time light, of whom 4.1 M live within 2 km of a power line, 7.8 M at 2 to 15 km and 10.1 M farther away.

Access target stated
60% access by 2030 (PDAE/SNAE) from 20.84% in 2022; PDAE 2030 objective of 2,883,208 connections (875,020 from ongoing projects, gap 2,009,945); targeted access growth pace 14% per year 2023-2030 vs 5% in 2017-2021.
Grid, mini-grid and standalone solar split
PDAE 2030 objective (60% access): grid densification and extension 2,077,515 connections (43.4%); hybrid mini-grids 115,301 (2.4%); solar kits 690,392 (14.6%); total 2,883,208. PDAE long-run split of population: grid 76%, mini-grids 2%, standalone solar 22%.
Productive use yes
No compact-level productive-use target; the ongoing partner projects table lists an AICS (Italy) rural PV project including 25 solar pumping kits for market-garden sites (Illéla and Keita departments), plus women-focused solar multifunctional platform projects (Plan International / Spanish Cooperation).
E-waste and end of life no
No mention of e-waste, battery or solar end-of-life, recycling or take-back found.
Least-cost or geospatial plan exists
PDAE (Plan Directeur d'Accès à l'Electricité, 2019, GIS-based, horizon 2035) derived from the SNAE (2018); SNAE and PDAE second phase (2026-2030) to be updated in 2025; least-cost generation plan (PPMC) being finalized, to be adopted in 2025.
Mini-grids and grid arrival mentioned
Regulatory provisions (including tariff rules) for private mini-grids to be adopted with the new electricity code and its decrees in 2025; no grid-arrival or interconnection rules stated.
Clean cooking stated
Increase clean cooking access from about 6% (2023) to 12% by 2030, at 1% per year.
Tariffs committed
Commitment to adopt in 2025 a NIGELEC financial viability plan combining efficiency gains and financing mechanisms (restoring cost-covering tariffs and/or government subsidy); NIGELEC has not recovered 100% of operating costs since 2022 because the ARSE tariff study increase was not applied.
Private investment stated
USD 527 million private capital to be mobilized by 2030 (baseline 0): USD 435 million private renewable generation plus USD 92 million for solar kits.
Reported progress reported
49,194 new connections in 2025 (2024 baseline 793,976; 2030 target 2,883,208); clean cooking no data yet (baseline 6%, target 12%); renewable share 7.64% (baseline 5%, target 30%); private capital mobilized 0 (target USD 527 million); of 21 reform actions, 5 completed, 7 in progress, 9 delayed.

Nigeria: Mission 300 energy compact

7 of 10 stated

Compact listed Jan 2025 on the World Bank compacts page. Aloe's map: 132.6 M people without night-time light, of whom 55.9 M live within 2 km of a power line, 68.8 M at 2 to 15 km and 7.8 M farther away.

Access target stated
Universal access by 2030 from 61% in 2022, raising the pace of access from 5% to 9% per year (2024-2030); no total number of new connections or people stated.
Grid, mini-grid and standalone solar not stated
No grid / mini-grid / standalone breakdown of the access target. The Declaration states DRE offers a least-cost pathway for more than 60 million Nigerians (mini-grids mainly in the North, standalone solar in sparse rural areas), citing the IEP refresh.
Productive use mentioned
MSMEs named as beneficiaries of NEP and DARES; Annex II reports at least 14,326 SMI/SME mini-grid connections; no productive-use target or program figure in the action plan.
E-waste and end of life no
No mention of e-waste, battery or solar end-of-life, recycling or take-back found.
Least-cost or geospatial plan exists
Geospatial Integrated Energy Plan (IEP, SEforALL January 2022, refreshed May 2023) exists; no least-cost power system plan yet - commitments to systematize LCPDP updates by 2026, IRP by 2025-2027, and a National Electrification Strategy and Implementation Plan (NESIP) in 2025.
Mini-grids and grid arrival yes
Existing mini-grid regulations (updated 2023) cover eventual grid connection; compact commits to revise licensing limits (above 1 MW) with grid-code-compliant technical requirements for future interconnection with the grid, plus tri-partite arrangements for grid-connected projects with DISCOs, by 2025.
Clean cooking stated
Universal clean cooking access by 2030 (227 million people), raising the pace of access from 22% to 25% per year; current access rate 26% (p. 19).
Tariffs committed
Move to full cost-reflective tariffs with a social tariff for vulnerable consumers not later than 2027; quarterly tariff adjustments with a path to cost reflectivity; limited uniform subsidy (about USD 600 million per year in 2025-2027) while the metering gap is closed.
Private investment stated
USD 15.5 billion private capital for last-mile electrification, of USD 23.2 billion total last-mile need; funding table gives private USD 15.5 billion (distribution 5.1, off-grid 10.5) of USD 32.7 billion total needs by 2030.
Reported progress reported
Cumulative 137.3 million people with electricity access at end-2025 (2024 baseline 86.6 million; 2030 target 236.7 million); clean cooking 26% (baseline 22%, target 100%); renewable share 38.8% (baseline 22%, target 75%); private capital 2025 data under verification (target USD 15.499 billion); of 49 reform actions, 11 completed, 20 in progress, 18 delayed.

Republic of Congo: Mission 300 energy compact

5 of 10 stated

Compact listed Sep 2025 on the World Bank compacts page. Aloe's map: 3.9 M people without night-time light, of whom 0.7 M live within 2 km of a power line, 1.6 M at 2 to 15 km and 1.7 M farther away.

Access target stated
National access from 31.66% (38.67% urban, 1.01% rural) to 81.3% by 2030 (90% urban, 50% rural): about 953,000 additional connections (874,000 urban, 79,000 rural), equivalent to 2.5 million urban and 0.5 million rural inhabitants; stated pace 175,000 urban and 16,000 rural connections per year.
Grid, mini-grid and standalone solar split
Rural only: 90% of the rural access increase via standalone solar systems and 10% via mini-grids (to be confirmed by the National Electrification Strategy). Urban increase (874,000 connections) is described as regularization and new connections to the utility; no grid share stated as a figure.
Productive use mentioned
National gender and energy strategy by December 2026 to support progressive deployment of productive-use technologies; no productive-use target.
E-waste and end of life no
No e-waste, battery end-of-life, recycling or take-back measure found (batteries appear only in tax exemption provisions).
Least-cost or geospatial plan planned
No least-cost plan exists; commitment to prepare and adopt a Plan de Développement de l'Energie à Moindre Coût (PDEMC) by December 2026 (update procedure by June 2026, updates every two years, first update December 2028), plus a National Electrification Strategy (SEN) by December 2025 and a least-cost National Electrification Plan by December 2026.
Mini-grids and grid arrival not stated
No mini-grid regulation or grid-arrival provision found; off-grid measures limited to tax and customs advantages and defining options for private participation in off-grid electrification (June 2026).
Clean cooking stated
Clean cooking access from 39.6% (2023, SDG 7 tracking; 54.5% urban, 4.7% rural) to 81.3% by 2030 (90% urban, 50% rural): 672,827 additional urban and 160,146 rural households. National Clean Cooking Strategy (SNCP) adoption by December 2026.
Tariffs committed
By December 2026: new methodology for operators' revenue requirement (recovering at least 100% of efficient operating costs) and a new tariff grid with fixed, demand and energy charges reflecting efficient operating costs, including a social tariff. Tariffs unchanged since 1994, recovering 56% of cost of service.
Private investment stated
Target table: USD 1,437 million of additional private capital 2025-2030 (all new generation assumed via IPPs). Preamble cites USD 1.5 bn private within USD 2.31 bn of additional financing; Table 2 puts total investment at USD 11.543 bn with 71.6% private (USD 8.267 bn).
Reported progress none yet
No progress report published yet.

Rwanda: Mission 300 energy compact

6 of 10 stated

Compact listed Jun 2026 on the World Bank compacts page. Aloe's map: 9.5 M people without night-time light, of whom 4.3 M live within 2 km of a power line, 5.1 M at 2 to 15 km and 0.0 M farther away.

Access target stated
Universal access (100%) by 2030 from 84% in 2025 (59% grid, 25% off-grid), target mix 75% grid / 25% off-grid. Annex I lists 756,073 connections through existing programs and 328,129 additional through the Compact program; no combined total stated.
Grid, mini-grid and standalone solar aggregated
Target mix 75% grid / 25% off-grid by 2030 (no mini-grid vs standalone breakdown). Annex I: grid connections include densification, expansion and mini-grids; existing programs 681,073 grid / 75,000 off-grid; Compact program 131,252 grid / 196,877 off-grid households.
Productive use yes
Productive use of energy penetration target 100% by 2030 (baseline 89%, Aug 2025); plan to support PUEs in grid and off-grid areas by January 2027; PUE defined as all non-residential connections using electricity and thermal energy for economic and social welfare.
E-waste and end of life no
No mention of e-waste, battery or solar end-of-life, recycling or take-back found; the compact addresses post-warranty maintenance of off-grid systems only.
Least-cost or geospatial plan exists
National Electrification Plan (NEP, revised, approval due July 2026) with on-grid/off-grid demarcation, and Least Cost Power Development Plan (LCPDP, 2024 Review); LCPDP to be updated by June 2027.
Mini-grids and grid arrival mentioned
Unclear long-term integration of DRE with the grid noted as a challenge; clearer grid expansion plans and demarcation of off-grid service territories proposed. No mini-grid grid-arrival or interconnection rules stated.
Clean cooking stated
Increase clean cooking access (electricity, gas) from 5.6% (2025) to 31% by 2030; Declaration phrases it as from 6% to 31%.
Tariffs committed
Gradual move to cost-reflective pricing via cost-of-service studies and tariff reviews; RURA to adopt a multi-year tariff (Revenue Requirement) methodology by December 2027 and restructure end-user tariffs by 2029; new tariff approved October 2025.
Private investment stated
USD 1 billion private capital to be mobilized by 2030 (baseline USD 0.2 billion); indicative funding table 2026-2030 gives private USD 922.29 million of USD 3,054.18 million total.
Reported progress none yet
No progress report published yet.

Sao Tome and Principe: Mission 300 energy compact

6 of 10 stated

Compact listed Sep 2025 on the World Bank compacts page. Aloe's map: 0.1 M people without night-time light, of whom 0.0 M live within 2 km of a power line, 0.0 M at 2 to 15 km and 0.0 M farther away.

Access target stated
Universal access (100%) by 2030 from 84% (2024), via grid expansion and/or off-grid mini-grids; action plan lists 2,000 additional grid connections (2026), 6,000 (2027-2028) and 800 off-grid systems (2026); no total stated.
Grid, mini-grid and standalone solar not stated
No grid / mini-grid / standalone breakdown of the access target; only action-plan items (2,000 and 6,000 additional grid connections, 800 off-grid systems) and the ACRE project's 800 remote households with small solar systems by 2028.
Productive use yes
Gender-focused target in the access action plan: increase female-headed households and women-owned/led enterprises with access to energy, clean cooking and productive use technologies by 30%; agriculture/fisheries processing and irrigation cited as demand drivers.
E-waste and end of life no
No mention of e-waste, battery or solar end-of-life, recycling or take-back found (only a biomass and waste-to-energy feasibility study).
Least-cost or geospatial plan exists
Least-cost plan (LCPDP) developed under the PRSE project and the Decarbonization and Resilience Action Plan (PADRES 2024-2035); electricity sector master plan to be tendered for update in 2026 and approved in 2027.
Mini-grids and grid arrival mentioned
Mini-Grid Regulatory Framework to be adopted by 2026 for a lighter governance structure for mini-grids up to 5 MW; Decree-Law on Self-Generation and Mini-Grids allows exporting excess energy to the grid. No grid-arrival or interconnection rules for mini-grids stated.
Clean cooking stated
Increase access to clean cooking from 62% (2024) to 75% by 2030; National Clean Cooking Action Plan to be adopted in 2026.
Tariffs committed
Full cost recovery for EMAE by 2030 through tariff adjustments, debt restructuring and operational reforms; annual tariff adjustments under the approved (2024) tariff methodology; January 2025 average 15% increase with a 5-year trajectory to full cost recovery.
Private investment stated
At least USD 190 million private investment (about 64% of USD 297 million total need by 2030): USD 167 million generation and USD 23 million clean cooking.
Reported progress none yet
No progress report published yet.

Senegal: Mission 300 energy compact

8 of 10 stated

Compact listed Jan 2025 on the World Bank compacts page. Aloe's map: 10.7 M people without night-time light, of whom 4.1 M live within 2 km of a power line, 4.7 M at 2 to 15 km and 1.8 M farther away.

Access target stated
Universal access (100%) by 2029 from 84% (2023); 6.6 million additional people gaining first access by 2030; target pace 2.9% per year 2023-2030 (MEPM data).
Grid, mini-grid and standalone solar split
Additional people by 2030: grid 3.9 million (59%), mini-grids 1.6 million (23%), solar kits 1.2 million (18%); existing 14.2 / 0.2 / 0.5 million, total 21.5 million.
Productive use yes
Compact commits to integrate a strategy to encourage productive use of energy for off-grid viability (no target); Annex I lists the Green Climate Fund (BOAD) solar rural electrification project covering 38,917 rural households including 3,739 productive users.
E-waste and end of life no
No e-waste, battery end-of-life, recycling or take-back measures found.
Least-cost or geospatial plan planned
Plan Intégré à Moindre Coût (PIMC, integrated least-cost plan) to be finalized by 30 June 2025, replacing the 2019 generation/transmission plan and the non-optimized Plan opérationnel; update of the national electrification strategy and five-year plan by June 2025.
Mini-grids and grid arrival yes
Clearly defined regulatory approval process for private mini-grids, including licenses, tariffs and grid integration, to be in place by August 2025; Action Plan indicator covers grid arrival/integration.
Clean cooking stated
Raise the clean cooking access pace to 11.3% per year (from about 3.1%) over 2023-2030, 15.8 million additional people; baseline 32% (2022); no target percentage in the compact; improved cookstoves count as clean cooking.
Tariffs committed
Progressive removal of energy subsidies with cost-recovery objectives tied to tariff reforms; subsidy reduction and SENELEC efficiency measures by end December 2025; CRSE projects a 34% average tariff adjustment need over 2023-2028.
Private investment stated
Mobilize USD 2.3 billion additional private investment by 2030 across the value chain (reference: USD 2.3 billion cumulative in 2023); total financing need USD 6.3 billion (6,255 million, of which private 2,330 million), USD 4.6 billion unfunded.
Reported progress reported
Progress to 31 December 2025: no updated progress data provided (2025 figures under CDMU validation); baselines and 2030 targets confirmed; of 26 reform actions, 4 completed, 15 in progress, 7 delayed.

Sierra Leone: Mission 300 energy compact

7 of 10 stated

Compact listed Sep 2025 on the World Bank compacts page. Aloe's map: 5.3 M people without night-time light, of whom 1.2 M live within 2 km of a power line, 2.3 M at 2 to 15 km and 1.8 M farther away.

Access target stated
Increase electricity access from 36% (2025 baseline) to 78% by 2030 by connecting at least 720,000 households on-grid and off-grid between 2025 and 2030.
Grid, mini-grid and standalone solar split
New household connections to 2030: 160,000 on-grid, 160,000 mini-grid, 400,000 solar home systems (off-grid 560,000). Target table shares for 2030: 28% on-grid, 50% off-grid (off-grid not split by mini-grid vs SHS).
Productive use mentioned
Productive uses in agriculture and mining discussed as demand drivers; mini-grid program to serve social institutions and productive uses; transmission corridors for productive use; no productive-use target.
E-waste and end of life no
No e-waste, battery end-of-life, recycling or take-back measures found.
Least-cost or geospatial plan exists
Integrated Resource Plan (IRP 2021-2040) identifies least-cost options, to be reviewed and updated by April 2026; Electrification Strategy least-cost approach (70% grid, 30% off-grid); national GIS database of energy assets planned.
Mini-grids and grid arrival yes
Integrating mini-grids into the national grid as it expands is stated as the planned long-term strategy (tariff parity, reliability); mini-grid regulation update and MYTO covering mini-grids by September 2025; no specific compensation or interconnection rules.
Clean cooking stated
Clean cooking access from 1.5% (2024) to 25% of the population by 2030, scaling LPG and bioethanol and delivering 1 million improved cookstoves; target table counts improved charcoal and firewood stoves toward the 25%.
Tariffs committed
EWRC to develop a Multi-Year Tariff Order (MYTO) by 2025 with a roadmap to a cost-reflective tariff and subsidy trajectory; adopt MYTO for on-grid by April 2026 and implement 2026-2030.
Private investment stated
Attract an additional USD 1.4 billion private investment by 2030 (private capital mobilized baseline USD 615 million); private share of funding needs USD 1,410 million of USD 2,245 million total.
Reported progress none yet
No progress report published yet.

Tanzania: Mission 300 energy compact

6 of 10 stated

Compact listed Jan 2025 on the World Bank compacts page. Aloe's map: 40.1 M people without night-time light, of whom 13.5 M live within 2 km of a power line, 21.2 M at 2 to 15 km and 5.4 M farther away.

Access target stated
Raise electricity connectivity from 46% (2022) to 75% by 2030, an additional 8.3 million households; footnote states an average of 1.6 million connections per year from 2025 to 2030 is required (stated, not computed)
Grid, mini-grid and standalone solar aggregated
REMP 2022 planning split cited in the compact: about 70% of the population via grid and 30% via off-grid solutions (mini-grids and standalone solar combined,); no split of the 8.3 million target
Productive use mentioned
Commitment to define and start a Productive Uses program by June 2025, without a quantified target
E-waste and end of life no
No e-waste, battery end-of-life, recycling or take-back measure found
Least-cost or geospatial plan exists
Rural Energy Master Plan (REMP) 2022 and Zanzibar Electrification Master Plan 2018 exist (to be revised by June 2027); PSMP 2020 Update exists, with a new comprehensive least-cost PSMP/IRP to be prepared and approved by 2025
Mini-grids and grid arrival mentioned
Compact says the enabling environment must give developers certainty on grid expansion and fair compensation on grid arrival; no specific rule or commitment; SPP Rules 2020 cited as the mini-grid approval process
Clean cooking stated
Clean cooking access from 6.9% (2021) to 75% by 2030 and 80% by 2034 (NCCS 2024-2034)
Tariffs committed
Cost-of-service study and cost-recovery tariff methodology by June 2026, annual tariff adjustments 2027-2030, cost-reflective SPP tariffs by June 2026
Private investment stated
Private capital to be mobilized by 2030: US$4.039 billion (baseline US$0.5 billion), within total financing need of US$12.89 billion
Reported progress reported
711,320 new connections in 2025 (2024 baseline 5,067,565; target +8,300,000); clean cooking 23%; renewable share 65%; private capital mobilized USD 143 million vs USD 4.039 billion target; 8 of 53 reform actions completed, 4 delayed

Togo: Mission 300 energy compact

8 of 10 stated

Compact listed Sep 2025 on the World Bank compacts page. Aloe's map: 4.8 M people without night-time light, of whom 2.7 M live within 2 km of a power line, 2.1 M at 2 to 15 km and 0.0 M farther away.

Access target stated
Universal access (100%) by 2030 from 70% in 2024 (5,439,000 people); more than 3.87 million additional people; Fonds Tinga to finance 1.3 million grid connections over 2025-2030.
Grid, mini-grid and standalone solar split
Table 3 planned 2030 totals (not additions), thousand people: grid 8,191, mini-grid 131, solar kits 1,647, total 9,969; existing 2024: 4,416 / 5 / 1,018. Text also cites about 133,000 additional solar kits by 2030.
Productive use yes
Dedicated productive-use strategy (Annex 6) and action plan indicator on a framework for productive use in agriculture, commerce and industry (no compact-level target); Annex 1 lists the AfDB/EU PRAVOST project including 600 solar pumps for farmers.
E-waste and end of life no
No e-waste, battery end-of-life, recycling or take-back measures found.
Least-cost or geospatial plan exists
National Electrification Strategy (updated 2025) and Plan Directeur Production, Transport et Distribution; adoption of the updated least-cost master plan by end 2025 and integrated planning capacity program in 2026.
Mini-grids and grid arrival yes
Update of the regulatory approval process for private DRE/mini-grids by 2027, covering licensing, tariffs, third-party grid access and terms for acquisition or transfer of assets to CEET by 2030.
Clean cooking stated
80% clean cooking access by 2030 from 14% (2024 action plan baseline); more than 2 million clean cooking solutions distributed and 60% reduction in wood-energy use; improved cookstoves count as clean cooking.
Tariffs committed
New tariff schedule defined in May 2025; tariff reform initiated in 2025 by ministerial order to progressively align tariffs with real supply costs with protection for vulnerable households; tariff framework revision by Q4 2028.
Private investment stated
Mobilize USD 1.68 billion private investment over 2025-2030 (USD 517.5 million mobilized 2011-2024); total financing need about USD 3.0 billion (USD 2,999 million, of which private 1,681 million).
Reported progress none yet
No progress report published yet.

Uganda: Mission 300 energy compact

6 of 10 stated

Compact listed Jun 2026 on the World Bank compacts page. Aloe's map: 35.2 M people without night-time light, of whom 13.8 M live within 2 km of a power line, 19.3 M at 2 to 15 km and 2.2 M farther away.

Access target stated
Electricity access from 60% (2025) to 85% by 31 December 2030, over 13 million additional people; action plan schedules about 2.4 million new connections (400,000 in 2027 rising to 800,000 in 2030) against an 82% central operational anchor.
Grid, mini-grid and standalone solar aggregated
Table 2 national 2030 shares: grid and mini-grids combined 70%, SHS 12%, total 85% (existing 2025: 47% and 13%); grid and mini-grids not separated. Delivery volumes: 2,712 mini-grids and about 2 million additional SHS units (6 million cumulative) by 2030.
Productive use mentioned
Productive use discussed as central to the access agenda (economic case cites doubling productive electricity consumption); Annex II lists a Solar for Productive Use Programme and EESME program without figures; no productive-use target in the action plan.
E-waste and end of life no
No e-waste, battery end-of-life, recycling or take-back measures found.
Least-cost or geospatial plan exists
Integrated Energy Resource Master Plan (IERMP) and Least Cost Generation Transmission Plan; National Electrification Strategy (NES) least-cost geospatial plan guiding connections.
Mini-grids and grid arrival yes
Revised Mini-grids Concession Framework regulations and grid-arrival compensation rules in force by Q1 2027 (ERA), with a mini-grid tariff architecture by Q2 2027.
Clean cooking stated
Modern cooking access from about 25% (2025) to 50% of the population by 2030, over 4.6 million additional households via LPG, electric cooking, bioethanol, biogas and improved cookstoves (NICCS 2023-2038, Clean Cooking Acceleration Facility).
Tariffs committed
Cost-of-Service study by June 2026; ERA multi-year tariff order with five-year glide path and automatic FX, inflation and loss-reduction adjustment in Q4 2026; lifeline block from the 2027 tariff cycle; subsidy ring-fencing and arrears clearance.
Private investment stated
USD 9.44 billion additional private capital mobilized over 2026-2030 (Category A operational plus Category B financial close); funding table shows USD 8,900 million private of USD 17,700 million total.
Reported progress none yet
No progress report published yet.

Zambia: Mission 300 energy compact

7 of 10 stated

Compact listed Jan 2025 on the World Bank compacts page. Aloe's map: 12.2 M people without night-time light, of whom 3.8 M live within 2 km of a power line, 6.5 M at 2 to 15 km and 1.9 M farther away.

Access target stated
Universal access (100%) by 2030 from 53.6% (2023 NEAS); Annex IV projects 3,227,871 new connections 2025-2030. Stated paces: above 120,000 on-grid and at least 294,719 off-grid connections per year; no combined annual figure stated.
Grid, mini-grid and standalone solar split
Annex IV (2025-2030): grid 1,459,560; mini-grid 328,304; SHS 1,440,007; total 3,227,871 connections. The target table labels the off-grid figure (1,768,311) as households.
Productive use mentioned
Agricultural energy demand (irrigation, crop processing) discussed as a demand driver; no productive-use target or dedicated program figure in the compact.
E-waste and end of life mentioned
Only in Annex I: a Sweden-funded project proposal under appraisal (EELA Zambia, 2025-2029) includes end-of-life treatment and e-waste management skills; no government commitment in the action plan.
Least-cost or geospatial plan exists
Least-Cost Geospatial Electrification Plan (LCGEP) and Integrated Resource Plan (IRP 2023-2050); LCGEP and NES not yet validated, to be reviewed by December 2025.
Mini-grids and grid arrival yes
Proposed Mini-Grid Regulatory Framework (up to 5 MW) addresses grid encroachment; commitment to revise, test and enact mini-grid regulations by December 2026. No detailed grid-arrival rules stated.
Clean cooking stated
Increase clean cooking access from 8.9% (2022 LCMS) to 40% of the population by 2030.
Tariffs committed
Full cost recovery by 2027 via a multi-year tariff framework and IPP tariff pass-through; MYTF glide path to cost-reflective tariffs.
Private investment stated
USD 9.5 billion private-sector investment to be mobilized, out of USD 11.9 billion total investment requirement (82%).
Reported progress none yet
No progress report published yet.

Zimbabwe: Mission 300 energy compact

8 of 10 stated

Compact listed Oct 2025 on the World Bank compacts page. Aloe's map: 10.0 M people without night-time light, of whom 4.1 M live within 2 km of a power line, 4.8 M at 2 to 15 km and 1.2 M farther away.

Access target stated
From 41% of households (2024 NES estimate) to 100% by 2030; 320,000 on-grid and 200,000 off-grid new household connections per year 2025-2030; 3,097,503 total (Annex I); per-year value computed as 3,097,503 over 6 years (2025-2030)
Grid, mini-grid and standalone solar split
Grid: additional 1.9 million households (target table); mini-grid 15,602 and standalone solar 1,158,877 households by 2030 (Annex I cumulative); 2030 shares 62% grid, 38% mini-grid and SHS
Productive use mentioned
Irrigation and agro-processing listed as demand drivers; productive use appears in a partner program description; no target
E-waste and end of life no
No reference to e-waste, battery or solar end-of-life, recycling or take-back found (waste content concerns municipal waste-to-energy only)
Least-cost or geospatial plan exists
Least Cost Geospatial Electrification Plan (LCGEP) underpinning NES 2025-2030; NIERP under development; Integrated Least Cost Power System Plan by Q2 2026
Mini-grids and grid arrival yes
Commitment to approve the Mini-Grid Regulatory Framework (MGRF), covering grid encroachment terms, by Q4 2025 (reported as delayed)
Clean cooking stated
From 38.6% to 70% by 2030; reduce firewood and charcoal use by 50%; 80% of new buildings with clean cooking infrastructure
Tariffs committed
At least 100% operational cost recovery in local and foreign currency by Q4 2027; review tariffs to update the Tariff Code and Cost of Service Study by Q4 2026
Private investment stated
Over US$4.42 billion private investment (headline figure); target table lists generation US$3.43 billion and T&D US$220.87 million separately; total financing need US$9.13 billion (2025-2030)
Reported progress reported
50,000 new household connections in 2025; clean cooking 45.7%; renewables share 42.5%; US$487.75 million private capital mobilized in 2025 (US$687.75 million cumulative 2024-2025); 5 of 71 reform actions completed, 50 in progress, 16 delayed
Reference

Method, sources and updates

Read it with care

Compacts are written by each government in its own format, and many give more than one figure for the same target. Where a compact contradicts itself, we record the figure in its target table and note the others. Units differ: some count people, some households, some connections. Dates are those on the World Bank compacts page, because no compact prints its own date.

Sources

The national energy compacts and progress reports published on the World Bank Mission 300 pages. Map figures: WorldPop 2020 and gridfinder (Arderne et al. 2020, CC BY 4.0). The full table, with every quote and page number, is available on request: email [email protected].

Checked monthly for new compacts and progress reports. Email us to send a correction.

Common questions

What is Mission 300?

A joint effort led by the World Bank Group and the African Development Bank to connect 300 million people in Africa to electricity by 2030. Countries that join publish a national energy compact setting out their targets, reforms and investment plans.

Which countries have a Mission 300 energy compact?

35 compacts are published so far: Benin, Botswana, Burkina Faso, Burundi, Cameroon, Central African Republic, Chad, Comoros, Cote d'Ivoire, DR Congo, Ethiopia, Gabon, Gambia, Ghana, Guinea, Kenya, Lesotho, Liberia, Madagascar, Malawi, Mauritania, Mozambique, Namibia, Niger, Nigeria, Republic of Congo, Rwanda, Sao Tome and Principe, Senegal, Sierra Leone, Tanzania, Togo, Uganda, Zambia, Zimbabwe.

Which compacts plan for mini-grids meeting the grid?

18 compacts clearly address what happens to mini-grids when the main grid arrives, through regulation or a stated commitment. Many others mention mini-grids without saying how they will connect. See the "Mini-grids and grid arrival" column above.

Do the compacts deal with solar and battery waste?

Few do. 4 of 35 make a clear e-waste or end-of-life commitment. Our second-life atlas shows how much solar and battery equipment will retire in Southern Africa and where it could be reused or recycled.