Country data

Central African Power Pool

Equatorial Guinea electricity grid and access

About 443,000 people in Equatorial Guinea live where satellites see no electric light at night, and 100% of them live within 15 km of a power line. This page brings together what our open atlases show for Equatorial Guinea: about 1,208 km of high-voltage lines, 338 MW of power plants and the projects still to come.

443kpeople live without night-time light, a proxy for no power
100%of them live within 15 km of a power line
1,208km of high-voltage lines, 66 kV and above
338MW of operating power plants, 10 MW and above
2power plants and transmission lines planned or under construction
The grid today

Lines, substations and demand

Equatorial Guinea's mapped high-voltage network runs to about 1,208 km of lines at 66 kV and above, with 15 substations. The highest voltage on the map is 220 kV, and 47% of the line length runs at 220 kV or more. Installed capacity was about 343 MW (GEM Sep 2026). The latest international tracking report puts access to electricity at 65% of people.

Mapped line length
Voltagekm
220 kV571
110 kV446
Voltage not recorded191
Total1,208
Near the grid, not on it

Who lives near the grid but off it

About 443,000 people in Equatorial Guinea, roughly 23% of the population, live where satellites see no electric light at night. Of them, 100% live within 15 km of a mapped or predicted power line: 309,000 within 2 km, 133,000 2 to 15 km away, and 0 farther out. The largest group lives within 2 km of a line, so the main gap is last-mile connections and affordability, more than new lines.

  • Within 2 km: 309,000 (70%)
  • 2 to 15 km: 133,000 (30%)
  • More than 15 km: 0 (0%)
See the numbers as a table
People without night-time light, by distance to a line
DistanceMillion peopleShare
Within 2 km of a line0.3170%
2 to 15 km0.1330%
More than 15 km0.000%
Total0.44100%
How we count this

"Without night-time light" is a satellite proxy, not a measured access rate. Distances are straight lines to mapped or predicted lines. See the grid-edge atlas for the method.

Generation and pipeline

Power plants and projects

Four operating power plants of 10 MW and above add up to about 338 MW, 64% of it gas. The largest is Malabo Turbogas power plant (154 MW, gas). Another 1 plant totaling about 200 MW is under construction or planned, 200 MW of them under construction. Most of the pipeline is hydro. The largest plant under construction is Sendje hydroelectric plant (200 MW, hydro).

One transmission project touching Equatorial Guinea is in our register.

  • Cameroon - Gabon - Equatorial Guinea interconnection: feasibility, expected 2033.
Power plants of 10 MW and above
TypeOperating MWPipeline MW
Hydro120200
Gas218
Total338200
Topics

More about Equatorial Guinea

Open any topic for the full text and tables.

Waste to Wealth

Second life for solar and batteries

Between 2026 and 2040, about 204 tonnes of solar equipment and stationary batteries are expected to retire in Equatorial Guinea, most of it solar panels.

Between 2026 and 2040, about 204 tonnes of solar equipment and stationary batteries are expected to retire in Equatorial Guinea, most of it solar panels. That is 0.0% of the total for the 49 countries in our second-life atlas. West and Central Africa have no recycler for panels or lithium batteries yet (one is planned in Ogun State, Nigeria), only e-waste collection in Accra, Lagos and Dakar and some lead-acid smelters, so for now this waste would be shipped abroad from the nearest seaport. Reuse comes first: Spiro already puts retired swap batteries to work as storage.

Solar and batteries retiring, 2026-2040 (tonnes)
StreamTonnesShare of country
Solar panels10752%
Off-grid solar kits and mini-grids9748%
Total204100%
Equatorial Guinea compared with the 49 countries in our second-life atlas, 2026-2040
Equatorial GuineaAtlas totalShare
Retiring solar and batteries (tonnes)204507,0910.0%
Reusable battery storage (MWh)04,6640.0%
Retiring in 2030 (tonnes)8
Retiring in 2035 (tonnes)12
Retiring in 2040 (tonnes)20

From our second-life atlas, central case, by country. Electric vehicle batteries are modeled for the region as a whole, so they are not in these country figures.

Emissions

Grid emission factor

Each megawatt-hour generated in Equatorial Guinea in 2024 came with about 0.37 tonnes of CO2.

Each megawatt-hour generated in Equatorial Guinea in 2024 came with about 0.37 tonnes of CO2. For carbon projects such as solar mini-grids, the combined margin (the usual basis for crediting) is about 0.40 tCO2/MWh. Looking ahead, our scenarios from the plants in the pipeline put the average at 0.16 tCO2/MWh in 2030 and 0.21 in 2035, depending on how many plants arrive on time (see the scenarios). We have not yet rated the quality of its data. See our grid emission factors for the method and all 49 countries.

Grid mix, 2024.

Gas 72% Oil and diesel 1% Hydro 27%

Grid emission factor, 2024 (tCO2/MWh)
MeasuretCO2/MWh
Generated in country0.371
Electricity used, with imports0.371
Combined margin (for carbon projects)0.404
Tariffs and load shedding

What power costs here

Our utilities, tariffs and load shedding page compares 49 African countries by customer class, with what each tariff includes and load shedding since 2015.

Our utilities, tariffs and load shedding page compares 49 African countries by customer class, with what each tariff includes and load shedding since 2015.

Tariff and load shedding
MeasureValue
Load shedding nowNo 2026 load shedding reports found (searched 19 Nov 2026); exports power to Gabon over the interconnector opened in Feb 2025

Energy charge only, at the central bank rate on 30 October 2026. Check what is included (VAT, levies, fixed charges) on the research page.

Grid consumption

Who uses the power on the grid

Households used about 41% of the country's electricity in 2023, by UN estimates.

Households used about 41% of the country's electricity in 2023, by UN estimates. We have not found an official split by customer class yet. Our grid consumption page compares sales by customer class, power use per customer and peak demand across 49 African countries.

Grid consumption
MeasureValue
Households (UN)41%
Commercial and public (UN)22%
Industry (UN)34%
Agriculture and other (UN)2%
National use, UN 2023873 GWh *

UN: UN Energy Statistics Database (UNdata). * UN estimate or a single figure from a news report.

Certificates and carbon credits

Renewable energy certificates

Equatorial Guinea cannot issue I-RECs, the international renewable energy certificate, yet.

Equatorial Guinea cannot issue I-RECs, the international renewable energy certificate, yet. No carbon credit projects are listed for it on the voluntary registries. See our certificates page to compare certificates with carbon credits across the region.

Certificates and carbon credits
MeasureValue
I-REC statusNot approved
Registered plants-
I-RECs issued, all years-
Carbon credit projects0
Carbon credits issued-

I-RECs: Xpansiv I-REC Registry statistics, October 2026. Carbon projects: CarbonPlan OffsetsDB (Verra, Gold Standard and other voluntary registries), data to June 2026. Article 6: UNEP Copenhagen Climate Centre Article 6 Pipeline, November 2026.

Lit but off the map

Where the lights are and the map is not

Satellites see 76 lit places in Equatorial Guinea at night. 49 are within 2 km of a mapped line, 16 are 2 to 10 km away and 11 are 10 km or more from any mapped line.

Satellites see 76 lit places in Equatorial Guinea at night. 49 are within 2 km of a mapped line, 16 are 2 to 10 km away and 11 are 10 km or more from any mapped line. Places lit far from the map point to lines the map is missing, mines and plants with their own power, or mini-grids.

The lit places off the map cover about 95 km² and are home to about 42,754 people.

Lit places by distance to a mapped line
DistanceLit placesNewly lit
Within 2 km of a mapped line49
2 to 10 km away1610
10 km or more112

See them on the map: the "Lit but off the map" layer of the grid-edge atlas.

Water and climate risk

Hydro and drought

Hydro is 36% of the operating power plants in Equatorial Guinea and made 27% of its electricity in 2024.

Hydro is 36% of the operating power plants in Equatorial Guinea and made 27% of its electricity in 2024.

A dry year that takes a fifth of hydro output would cost about 10 MW on average over the year, and a severe drought (two fifths, as Zambia saw in 2024) about 20 MW.

Our data has no import line with a published capacity, so a shortfall would have to be met at home.

Hydro exposure
MeasureValue
Hydro in operating capacity36%
Operating hydro (MW)123
Hydro in 2024 generation27%
Dry year, average MW lost10
Severe drought, average MW lost20

Method and all countries: hydro dependence and drought exposure.

From power plant to battery site

When the thermal plants close

Equatorial Guinea has 1 coal, gas or oil plant site of 50 MW or more, with 154 MW of grid connection.

Equatorial Guinea has 1 coal, gas or oil plant site of 50 MW or more, with 154 MW of grid connection. None of it frees up before 2030 in our central case.

Putting solar and batteries on those connections when they free up would save about 0.3 Mt of CO2 between 2026 and 2050, worth about 0.8 times what they cost to build at the US EPA's social cost of carbon.

Largest sites
PlantFuelConnection (MW)Frees upCO2 saved 2026-2050 (Mt)
Malabo Turbogas power plantGas15420390.3

Timings, cases and every site: power plant to battery site.

Waste to Wealth

Power from waste

Equatorial Guinea's sugar mills, landfills, sewage works, factories and crop residues could make about 4 MW of power that is not built yet (central case), avoiding about 9,145 t of CO2e a year.

Equatorial Guinea's sugar mills, landfills, sewage works, factories and crop residues could make about 4 MW of power that is not built yet (central case), avoiding about 9,145 t of CO2e a year.

Power from waste by source (MW, central case)
SourceMW
Landfill gas and biogas0.4
Crop and sawmill residues3.1

Every site, costs and the method: power from waste.

Second life

Who could use a second-life panel

Places in Equatorial Guinea that could use a second-life solar panel add up to about 157 MWp (range 70 to 356): 153 MWp to cut generator use in towns, 3 MWp for mini-grids, 1 MWp for household systems and 0.1 MWp for 15 health facilities and 0 schools with no light at night.

Places in Equatorial Guinea that could use a second-life solar panel add up to about 157 MWp (range 70 to 356): 153 MWp to cut generator use in towns, 3 MWp for mini-grids, 1 MWp for household systems and 0.1 MWp for 15 health facilities and 0 schools with no light at night.

Mapped by half-degree cell, with years to 2040: where the panels are needed.

E-mobility

Electric transport, per km

On Equatorial Guinea's grid, an electric motorbike emits about 26 g of CO2 per km from the power it charges with, against 48 g for a petrol one (46% less).

On Equatorial Guinea's grid, an electric motorbike emits about 26 g of CO2 per km from the power it charges with, against 48 g for a petrol one (46% less).

CO2 per km from use (g)
VehicleElectricPetrol or dieselDifference
Motorbike2648-46%
Bus4801,673-71%
Small car (newer petrol car)77125-38%

Life-cycle figures, a cost calculator and city air: e-mobility.

Reference

Neighbors, sources and updates

Sources 12 sources
  • Grid lines: OpenStreetMap contributors (ODbL), with gap-fill from the World Bank Africa electricity grid (2017).
  • Power plants: Global Energy Monitor, Global Integrated Power Tracker (September 2026), with WRI and curated public project sources.
  • Capacity and access: national regulators and utilities, and the Tracking SDG7 Energy Progress Report 2026.
  • People without night-time light and distance to the grid: WorldPop 2020 and gridfinder (Arderne et al. 2020, CC BY 4.0), as screened in our grid-edge atlas.
  • Retiring solar and batteries: our second-life atlas model (central case, regular losses), from public project registers and IRENA lifetimes.
  • Emission factors: our grid emission factors (Ember, 2024).
  • Lit places: NASA Black Marble night lights, compared with our mapped lines (grid-edge atlas).
  • Hydro and drought: our hydro exposure analysis (plants from our grid atlases; generation from Ember, corrected with regulator figures).
  • Thermal plant sites: Global Energy Monitor, Global Integrated Power Tracker (September 2026), and our thermal-to-storage model.
  • Power from waste: FAOSTAT, Global Energy Monitor and OpenStreetMap sites, in our waste-to-energy model.
  • Second-life demand: grid-edge screening, compact targets, World Bank Enterprise Surveys and health and school facility lists, in our second-life atlas.
  • Transport per km: our grid emission factors and vehicle energy use; running costs from national pump prices and tariffs.

The maps are free to view. The data behind this page is available on request: email [email protected]. Lines are indicative, not for engineering or investment decisions.

What changed 4 updates

Our data is checked every month, and this page is rebuilt after each check.

  • 19 November 2026 - Latest update to the CAPP grid atlas, which this page is generated from.
  • 19 November 2026 - Latest update to the grid-edge atlas, which this page is generated from.
  • 19 November 2026 - Lit but off the map now covers all 43 countries (Mali, Guinea-Bissau, Cabo Verde and Equatorial Guinea added, with their OpenStreetMap lines), and people around Chad's lit places now come from the building-based layer: 20,300 places 2 km or more from a mapped line, about 106 million people. The free download is now version 2: 20,647 places in 43 countries. Road distances for Mali, Guinea-Bissau, Cabo Verde, Equatorial Guinea, Djibouti and Comoros now feed the chance bands.
  • 19 November 2026 - Mali, Guinea-Bissau, Cabo Verde and Equatorial Guinea added: 43 countries. Every country now counts people from buildings: Chad moves from WorldPop to Microsoft building footprints and Mali uses Overture Maps buildings, because Google's building data has none there. Headline: 633 million people without night-time light (was 617 M), 499 million of them within 15 km of a line (was 490 M). The lit-but-off-the-map layer still covers the first 39 countries.

Common questions about Equatorial Guinea

Where can I find a map of Equatorial Guinea's electricity grid?

The free CAPP grid atlas maps Equatorial Guinea's high-voltage lines, substations, power plants of 10 MW and above and planned projects. Open it zoomed to Equatorial Guinea.

How many people in Equatorial Guinea live without electricity?

About 443,000 people live where satellites see no electric light at night, a proxy for living without power. Of them, 100% are within 15 km of a power line.

How long is Equatorial Guinea's transmission network?

About 1,208 km of mapped lines at 66 kV and above, mostly from OpenStreetMap.

How much power generation does Equatorial Guinea have?

Operating plants of 10 MW and above add up to about 338 MW in our atlas, with about 200 MW more under construction or planned.

What is the grid emission factor for Equatorial Guinea?

About 0.37 tCO2/MWh for electricity used in 2024, and 0.40 tCO2/MWh as a combined margin for carbon projects. See our grid emission factors for the method.

Can I get the data for Equatorial Guinea?

Yes, on request. The maps are free to view; email [email protected] and tell us what you need it for.

Spotted an error, or something missing on this page? Report an issue or send feedback