Country data

Eastern Africa Power Pool

Sudan electricity grid and access

About 16 million people in Sudan live where satellites see no electric light at night, and 50% of them live within 15 km of a power line. This page brings together what our open atlases show for Sudan: about 7,162 km of high-voltage lines, 3,760 MW of power plants and the projects still to come.

16 Mpeople live without night-time light, a proxy for no power
50%of them live within 15 km of a power line
7,162km of high-voltage lines, 66 kV and above
3,760MW of operating power plants, 10 MW and above
5power plants and transmission lines planned or under construction
The grid today

Lines, substations and demand

Sudan's mapped high-voltage network runs to about 7,162 km of lines at 66 kV and above, with 65 substations. The highest voltage on the map is 500 kV, and 84% of the line length runs at 220 kV or more. About 480 km come from older World Bank (2017) maps, used where OpenStreetMap has gaps. Installed capacity was about 4,020 MW (2024). The latest international tracking report puts access to electricity at 66% of people.

Mapped line length
Voltagekm
500 kV979
220 kV4,612
110 kV848
66 kV159
Voltage not recorded84
Gap-fill from older public maps480
Total7,162
Near the grid, not on it

Who lives near the grid but off it

About 16 million people in Sudan, roughly 31% of the population, live where satellites see no electric light at night. Of them, 50% live within 15 km of a mapped or predicted power line: 2.4 million within 2 km, 5.6 million 2 to 15 km away, and 7.9 million farther out. The largest group lives more than 15 km from any line, where standalone solar and mini-grids are the realistic first step for years to come.

  • Within 2 km: 2.4 million (15%)
  • 2 to 15 km: 5.6 million (35%)
  • More than 15 km: 7.9 million (50%)
See the numbers as a table
People without night-time light, by distance to a line
DistanceMillion peopleShare
Within 2 km of a line2.3915%
2 to 15 km5.5935%
More than 15 km7.8550%
Total15.84100%
How we count this

"Without night-time light" is a satellite proxy, not a measured access rate. Distances are straight lines to mapped or predicted lines. See the grid-edge atlas for the method.

Generation and pipeline

Power plants and projects

There are 25 operating power plants of 10 MW and above, adding up to about 3,760 MW, 50% of it hydro. The largest is Merowe Dam hydroelectric plant (1,250 MW, hydro). Another 4 plants totaling about 1,370 MW are under construction or planned, 170 MW of them under construction. Most of the pipeline is gas. One early-stage project, Port Sudan power station, accounts for 73% of that, so the total says more about ambition than about what will be built soon. The largest plant under construction is Port Sudan power station (170 MW, gas).

One transmission project touching Sudan is in our register.

  • Ethiopia-Sudan second interconnector 500 kV (500 kV): feasibility, expected 2032.
Power plants of 10 MW and above
TypeOperating MWPipeline MW
Hydro1,891
Gas5541,170
Oil1,077
Solar54
Wind200
Biomass184
Total3,7601,370
Topics

More about Sudan

Open any topic for the full text and tables.

Waste to Wealth

Second life for solar and batteries

Between 2026 and 2040, about 712 tonnes of solar equipment and stationary batteries are expected to retire in Sudan, most of it solar panels.

Between 2026 and 2040, about 712 tonnes of solar equipment and stationary batteries are expected to retire in Sudan, most of it solar panels. That is 0.1% of the total for the 49 countries in our second-life atlas. Eastern Africa has e-waste collection and dismantling, in Kenya and Rwanda, but no recycler for panels or lithium batteries yet, so this waste would have to travel to South Africa, mostly by sea to Durban.

Solar and batteries retiring, 2026-2040 (tonnes)
StreamTonnesShare of country
Solar panels712100%
Total712100%
Sudan compared with the 49 countries in our second-life atlas, 2026-2040
SudanAtlas totalShare
Retiring solar and batteries (tonnes)712507,0910.1%
Reusable battery storage (MWh)04,6640.0%
Retiring in 2030 (tonnes)6
Retiring in 2035 (tonnes)23
Retiring in 2040 (tonnes)76

From our second-life atlas, central case, by country. Electric vehicle batteries are modeled for the region as a whole, so they are not in these country figures.

Emissions

Grid emission factor

Each megawatt-hour generated in Sudan in 2024 came with about 0.15 tonnes of CO2.

Each megawatt-hour generated in Sudan in 2024 came with about 0.15 tonnes of CO2. For carbon projects such as solar mini-grids, the combined margin (the usual basis for crediting) is about 0.23 tCO2/MWh. Looking ahead, our scenarios from the plants in the pipeline put the average at 0.20 tCO2/MWh in 2030 and 0.27 in 2035, depending on how many plants arrive on time (see the scenarios). We have not yet rated the quality of its data. See our grid emission factors for the method and all 49 countries.

Grid mix, 2024. 5% of the electricity used is imported.

Oil and diesel 20% Hydro 78% Solar 1% Bioenergy 1%

Grid emission factor, 2024 (tCO2/MWh)
MeasuretCO2/MWh
Generated in country0.155
Electricity used, with imports0.147
Combined margin (for carbon projects)0.231
Tariffs and load shedding

What power costs here

Our utilities, tariffs and load shedding page compares 49 African countries by customer class, with what each tariff includes and load shedding since 2015.

Our utilities, tariffs and load shedding page compares 49 African countries by customer class, with what each tariff includes and load shedding since 2015.

Tariff and load shedding
MeasureValue
Load shedding nowWidespread outages since the war began in April 2023; the grid is being repaired in stages and supply in Khartoum was still erratic in 2026

Energy charge only, at the central bank rate on 30 October 2026. Check what is included (VAT, levies, fixed charges) on the research page.

Grid consumption

Who uses the power on the grid

Households used about 68% of the country's electricity in 2023, by UN estimates.

Households used about 68% of the country's electricity in 2023, by UN estimates. We have not found an official split by customer class yet. Our grid consumption page compares sales by customer class, power use per customer and peak demand across 49 African countries.

Grid consumption
MeasureValue
Households (UN)68%
Commercial and public (UN)13%
Industry (UN)11%
Agriculture and other (UN)8%
National use, UN 202310,583 GWh *

UN: UN Energy Statistics Database (UNdata). * UN estimate or a single figure from a news report.

Certificates and carbon credits

Renewable energy certificates

Sudan cannot issue I-RECs, the international renewable energy certificate, yet.

Sudan cannot issue I-RECs, the international renewable energy certificate, yet. On the voluntary carbon registries it has 5 carbon credit projects, 2 of them issuing, with about 0.4 million credits issued; none is a renewable energy project. See our certificates page to compare certificates with carbon credits across the region.

Certificates and carbon credits
MeasureValue
I-REC statusNot approved
Registered plants-
I-RECs issued, all years-
Carbon credit projects5
Carbon credits issued0.4 million

I-RECs: Xpansiv I-REC Registry statistics, October 2026. Carbon projects: CarbonPlan OffsetsDB (Verra, Gold Standard and other voluntary registries), data to June 2026. Article 6: UNEP Copenhagen Climate Centre Article 6 Pipeline, November 2026.

Lit but off the map

Where the lights are and the map is not

Satellites see 1,505 lit places in Sudan at night. 310 are within 2 km of a mapped line, 442 are 2 to 10 km away and 753 are 10 km or more from any mapped line.

Satellites see 1,505 lit places in Sudan at night. 310 are within 2 km of a mapped line, 442 are 2 to 10 km away and 753 are 10 km or more from any mapped line. Places lit far from the map point to lines the map is missing, mines and plants with their own power, or mini-grids.

The lit places off the map cover about 5,080 km² and are home to about 11,548,732 people.

Lit places by distance to a mapped line
DistanceLit placesNewly lit
Within 2 km of a mapped line310
2 to 10 km away442362
10 km or more753626

See them on the map: the "Lit but off the map" layer of the grid-edge atlas.

Water and climate risk

Hydro and drought

Hydro is 50% of the operating power plants in Sudan and made 78% of its electricity in 2024.

Hydro is 50% of the operating power plants in Sudan and made 78% of its electricity in 2024.

A dry year that takes a fifth of hydro output would cost about 261 MW on average over the year, and a severe drought (two fifths, as Zambia saw in 2024) about 521 MW.

The import lines have room for about 100 MW more than they carry under firm contracts today.

Hydro exposure
MeasureValue
Hydro in operating capacity50%
Operating hydro (MW)1,891
Hydro in 2024 generation78%
Dry year, average MW lost261
Severe drought, average MW lost521
Spare import room (MW)100

Method and all countries: hydro dependence and drought exposure.

Climate and carbon

Carbon per new connection

The Mission 300 compact for Sudan adds about 2.91 million new connections by 2030: 1.82 million to the grid, 0.42 million on mini-grids and 0.67 million with solar home systems.

The Mission 300 compact for Sudan adds about 2.91 million new connections by 2030: 1.82 million to the grid, 0.42 million on mini-grids and 0.67 million with solar home systems.

Counted with what household surveys show people use for light now (kerosene is the main light in 5% of homes without power), they avoid about 58,121 t of CO2 a year and add about 107,814 t from the power they use, a net addition of 49,693 t a year.

New connections and CO2, central case
MeasureValue
New connections by 20302,912,164
CO2 avoided (t a year)58,121
CO2 added (t a year)107,814
Net CO2 avoided (t a year)-49,693
Net per 1,000 connections (t a year)-17.1

The default methodology view and every source: carbon per connection.

From power plant to battery site

When the thermal plants close

Sudan has 8 coal, gas or oil plant sites of 50 MW or more, with 2,151 MW of grid connection. 910 MW of it frees up by 2030 in our central case.

Sudan has 8 coal, gas or oil plant sites of 50 MW or more, with 2,151 MW of grid connection. 910 MW of it frees up by 2030 in our central case.

Putting solar and batteries on those connections when they free up would save about 8.7 Mt of CO2 between 2026 and 2050, worth about 1.1 times what they cost to build at the US EPA's social cost of carbon.

Largest sites
PlantFuelConnection (MW)Frees upCO2 saved 2026-2050 (Mt)
Kosti power plantOil50020510.0
Port Sudan power stationGas37420570.0
Mahmoud Sharif power stationOil32020263.0
Kilo-X Dit power plantOil25720490.2
Garri 2 Power PlantGas22020262.1
Garri 1 Power PlantGas22020262.1
Karadeniz PowershipGas15020301.1
Garri 4 Power PlantOil11020450.2

Timings, cases and every site: power plant to battery site.

Waste to Wealth

Power from waste

Sudan's sugar mills, landfills, sewage works, factories and crop residues could make about 114 MW of power that is not built yet (central case), avoiding about 185,976 t of CO2e a year.

Sudan's sugar mills, landfills, sewage works, factories and crop residues could make about 114 MW of power that is not built yet (central case), avoiding about 185,976 t of CO2e a year.

Power from waste by source (MW, central case)
SourceMW
Sugar mills and farms62.0
Landfill gas and biogas1.3
Industrial waste heat6.9
City waste17.1
Crop and sawmill residues26.6
Largest sites
SiteWhatMW
KhartoumCity waste incineration14.7
KenanaSugar mill boiler upgrade13.3
White Nile SugarSugar mill boiler upgrade13.3
GuneidSugar mill boiler upgrade8.9
New HalfaSugar mill boiler upgrade8.9
SennarSugar mill boiler upgrade8.9
AssalayaSugar mill boiler upgrade8.9
Berber Cement Barbar Cement PlantCement kiln waste heat2.1

Every site, costs and the method: power from waste.

Second life

Who could use a second-life panel

Places in Sudan that could use a second-life solar panel add up to about 4,500 MWp (range 2,017 to 10,175): 4,371 MWp to cut generator use in towns, 79 MWp for mini-grids, 40 MWp for household systems and 10.3 MWp for 152 health facilities and 4 schools with no light at night.

Places in Sudan that could use a second-life solar panel add up to about 4,500 MWp (range 2,017 to 10,175): 4,371 MWp to cut generator use in towns, 79 MWp for mini-grids, 40 MWp for household systems and 10.3 MWp for 152 health facilities and 4 schools with no light at night.

Mapped by half-degree cell, with years to 2040: where the panels are needed.

E-mobility

Electric transport, per km

On Sudan's grid, an electric motorbike emits about 10 g of CO2 per km from the power it charges with, against 48 g for a petrol one (79% less).

On Sudan's grid, an electric motorbike emits about 10 g of CO2 per km from the power it charges with, against 48 g for a petrol one (79% less).

CO2 per km from use (g)
VehicleElectricPetrol or dieselDifference
Motorbike1048-79%
Bus1901,673-89%
Small car (newer petrol car)31125-75%

Life-cycle figures, a cost calculator and city air: e-mobility.

Reference

Neighbors, sources and updates

Sources 13 sources
Show the full list 13 items
  • Grid lines: OpenStreetMap contributors (ODbL), with gap-fill from the World Bank Africa electricity grid (2017).
  • Power plants: Global Energy Monitor, Global Integrated Power Tracker (September 2026), with WRI and curated public project sources.
  • Capacity and access: national regulators and utilities, and the Tracking SDG7 Energy Progress Report 2026.
  • People without night-time light and distance to the grid: WorldPop 2020 and gridfinder (Arderne et al. 2020, CC BY 4.0), as screened in our grid-edge atlas.
  • Retiring solar and batteries: our second-life atlas model (central case, regular losses), from public project registers and IRENA lifetimes.
  • Emission factors: our grid emission factors (Ember, 2024).
  • Lit places: NASA Black Marble night lights, compared with our mapped lines (grid-edge atlas).
  • Hydro and drought: our hydro exposure analysis (plants from our grid atlases; generation from Ember, corrected with regulator figures).
  • Carbon per connection: compact targets, household lighting surveys (census, MICS, DHS, MTF) and our grid emission factors.
  • Thermal plant sites: Global Energy Monitor, Global Integrated Power Tracker (September 2026), and our thermal-to-storage model.
  • Power from waste: FAOSTAT, Global Energy Monitor and OpenStreetMap sites, in our waste-to-energy model.
  • Second-life demand: grid-edge screening, compact targets, World Bank Enterprise Surveys and health and school facility lists, in our second-life atlas.
  • Transport per km: our grid emission factors and vehicle energy use; running costs from national pump prices and tariffs.

The maps are free to view. The data behind this page is available on request: email [email protected]. Lines are indicative, not for engineering or investment decisions.

What changed 3 updates

Our data is checked every month, and this page is rebuilt after each check.

  • 19 November 2026 - Latest update to the EAPP grid atlas, which this page is generated from.
  • 19 November 2026 - Posters updated for the 12 countries, with new A2 pairs for Djibouti, Sudan, South Sudan, Eritrea and Somalia.
  • 19 November 2026 - Sudan, South Sudan, Eritrea, Somalia and Djibouti now shown in full (12 countries): their lines, substations and plants from OpenStreetMap, Global Energy Monitor, WRI and the World Bank 2017 map, and country figures from Ember (2024) and the World Bank.

Common questions about Sudan

Where can I find a map of Sudan's electricity grid?

The free EAPP grid atlas maps Sudan's high-voltage lines, substations, power plants of 10 MW and above and planned projects. Open it zoomed to Sudan.

How many people in Sudan live without electricity?

About 16 million people live where satellites see no electric light at night, a proxy for living without power. Of them, 50% are within 15 km of a power line.

How long is Sudan's transmission network?

About 7,162 km of mapped lines at 66 kV and above, mostly from OpenStreetMap, with older public maps filling gaps.

How much power generation does Sudan have?

Operating plants of 10 MW and above add up to about 3,760 MW in our atlas, with about 1,370 MW more under construction or planned.

What is the grid emission factor for Sudan?

About 0.15 tCO2/MWh for electricity used in 2024, and 0.23 tCO2/MWh as a combined margin for carbon projects. See our grid emission factors for the method.