Eastern Africa Power Pool
South Sudan electricity grid and access
About 8.1 million people in South Sudan live where satellites see no electric light at night, and 16% of them live within 15 km of a power line. This page brings together what our open atlases show for South Sudan: about 227 km of high-voltage lines, 164 MW of power plants and the projects still to come.

Open the live atlas for South Sudan Download the country report (PDF, 0.3 MB, November 2026) Rapport pays en français (PDF, novembre 2026) Relatório do país em português (PDF, novembro de 2026) Distribution network map
Free A2 posters of South Sudan’s grid: today and 2035 and beyond (PDF). All posters
Lines, substations and demand
South Sudan's mapped high-voltage network runs to about 227 km of lines at 66 kV and above, with 1 substations. The highest voltage on the map is 220 kV, and 42% of the line length runs at 220 kV or more. Installed capacity was about 230 MW (2024). The latest international tracking report puts access to electricity at 5% of people.
| Voltage | km |
|---|---|
| 220 kV | 96 |
| Voltage not recorded | 131 |
| Total | 227 |
Who lives near the grid but off it
About 8.1 million people in South Sudan, roughly 68% of the population, live where satellites see no electric light at night. Of them, 16% live within 15 km of a mapped or predicted power line: 373,000 within 2 km, 923,000 2 to 15 km away, and 6.8 million farther out. The largest group lives more than 15 km from any line, where standalone solar and mini-grids are the realistic first step for years to come.
- Within 2 km: 373,000 (5%)
- 2 to 15 km: 923,000 (11%)
- More than 15 km: 6.8 million (84%)
See the numbers as a table
| Distance | Million people | Share |
|---|---|---|
| Within 2 km of a line | 0.37 | 5% |
| 2 to 15 km | 0.92 | 11% |
| More than 15 km | 6.85 | 84% |
| Total | 8.14 | 100% |
How we count this
"Without night-time light" is a satellite proxy, not a measured access rate. Distances are straight lines to mapped or predicted lines. See the grid-edge atlas for the method.
Power plants and projects
Four operating power plants of 10 MW and above add up to about 164 MW, 72% of it oil. The largest is Paloch Oil Field power plant (85 MW, oil). Another 1 plant totaling about 1,080 MW is under construction or planned. Most of the pipeline is hydro.
Two transmission projects touching South Sudan are in our register. The most delayed is Uganda-South Sudan 400 kV (Olwiyo-Nimule-Juba): 8 years later than first promised, now expected in 2028.
- Uganda-South Sudan 400 kV (Olwiyo-Nimule-Juba) (400 kV): financed, expected 2028, 8 years behind the first date.
- Ethiopia-South Sudan 230 kV (Gambella-Malakal) (230 kV): pre-feasibility, expected 2030.
| Type | Operating MW | Pipeline MW |
|---|---|---|
| Hydro | 1,080 | |
| Oil | 118 | |
| Solar | 46 | |
| Total | 164 | 1,080 |
More about South Sudan
Open any topic for the full text and tables.
Waste to WealthSecond life for solar and batteries
Between 2026 and 2040, about 1,100 tonnes of solar equipment and stationary batteries are expected to retire in South Sudan, most of it off-grid solar kits and mini-grids. That is 0.2% of the total for the 49 countries in our second-life atlas. Eastern Africa has e-waste collection and dismantling, in Kenya and Rwanda, but no recycler for panels or lithium batteries yet, so this waste would have to travel to South Africa, mostly by sea to Durban.
| Stream | Tonnes | Share of country |
|---|---|---|
| Solar panels | 482 | 45% |
| Off-grid solar kits and mini-grids | 581 | 55% |
| Total | 1,063 | 100% |
| South Sudan | Atlas total | Share | |
|---|---|---|---|
| Retiring solar and batteries (tonnes) | 1,063 | 507,091 | 0.2% |
| Reusable battery storage (MWh) | 0 | 4,664 | 0.0% |
| Retiring in 2030 (tonnes) | 43 | ||
| Retiring in 2035 (tonnes) | 51 | ||
| Retiring in 2040 (tonnes) | 215 |
From our second-life atlas, central case, by country. Electric vehicle batteries are modeled for the region as a whole, so they are not in these country figures.
EmissionsGrid emission factor
Each megawatt-hour generated in South Sudan in 2024 came with about 0.75 tonnes of CO2. For carbon projects such as solar mini-grids, the combined margin (the usual basis for crediting) is about 0.65 tCO2/MWh. Looking ahead, our scenarios from the plants in the pipeline put the average at 0.71 tCO2/MWh in 2030 and 0.00 to 0.72 in 2035, depending on how many plants arrive on time (see the scenarios). We have not yet rated the quality of its data. See our grid emission factors for the method and all 49 countries.
Grid mix, 2024.
Oil and diesel 98% Solar 2%
| Measure | tCO2/MWh |
|---|---|
| Generated in country | 0.749 |
| Electricity used, with imports | 0.749 |
| Combined margin (for carbon projects) | 0.654 |
Tariffs and load sheddingWhat power costs here
Juba Electricity Distribution Company (JEDCO)'s Domestic, up to 100 kWh tariff. Our utilities, tariffs and load shedding page compares 49 African countries by customer class, with what each tariff includes and load shedding since 2015.
| Measure | Value |
|---|---|
| Household (0-100 kWh/month) | 0.273 USD/kWh, about US$0.273 |
| Load shedding now | No national load shedding schedule; Juba is supplied mainly by one thermal plant and most of the country has no grid |
Energy charge only, at the central bank rate on 30 October 2026. Check what is included (VAT, levies, fixed charges) on the research page.
Grid consumptionWho uses the power on the grid
Households used about 57% of the country's electricity in 2023, by UN figures. We have not found an official split by customer class yet. Our grid consumption page compares sales by customer class, power use per customer and peak demand across 49 African countries.
| Measure | Value |
|---|---|
| Households (UN) | 57% |
| Commercial and public (UN) | 32% |
| Industry (UN) | 5% |
| Agriculture and other (UN) | 6% |
| National use, UN 2023 | 679 GWh |
UN: UN Energy Statistics Database (UNdata).
Certificates and carbon creditsRenewable energy certificates
South Sudan can issue I-RECs, the international renewable energy certificate. 1 plants are registered (1 MW) and 2 GWh of certificates have been issued. No carbon credit projects are listed for it on the voluntary registries. See our certificates page to compare certificates with carbon credits across the region.
| Measure | Value |
|---|---|
| I-REC status | Issuing |
| Registered plants | 1 (1 MW) |
| I-RECs issued, all years | 2 GWh |
| Carbon credit projects | 0 |
| Carbon credits issued | - |
I-RECs: Xpansiv I-REC Registry statistics, October 2026. Carbon projects: CarbonPlan OffsetsDB (Verra, Gold Standard and other voluntary registries), data to June 2026. Article 6: UNEP Copenhagen Climate Centre Article 6 Pipeline, November 2026.
Lit but off the mapWhere the lights are and the map is not
Satellites see 94 lit places in South Sudan at night. 11 are within 2 km of a mapped line, 4 are 2 to 10 km away and 79 are 10 km or more from any mapped line. Places lit far from the map point to lines the map is missing, mines and plants with their own power, or mini-grids.
The lit places off the map cover about 499 km² and are home to about 1,879,038 people.
| Distance | Lit places | Newly lit |
|---|---|---|
| Within 2 km of a mapped line | 11 | |
| 2 to 10 km away | 4 | 4 |
| 10 km or more | 79 | 48 |
See them on the map: the "Lit but off the map" layer of the grid-edge atlas.
Waste to WealthPower from waste
South Sudan's sugar mills, landfills, sewage works, factories and crop residues could make about 4 MW of power that is not built yet (central case), avoiding about 34,425 t of CO2e a year.
| Source | MW |
|---|---|
| Landfill gas and biogas | 0.4 |
| Crop and sawmill residues | 3.9 |
Every site, costs and the method: power from waste.
Second lifeWho could use a second-life panel
Places in South Sudan that could use a second-life solar panel add up to about 694 MWp (range 307 to 1,557): 617 MWp to cut generator use in towns, 47 MWp for mini-grids, 21 MWp for household systems and 9.3 MWp for 1,558 health facilities and 1 schools with no light at night.
Mapped by half-degree cell, with years to 2040: where the panels are needed.
E-mobilityElectric transport, per km
On South Sudan's grid, an electric motorbike emits about 52 g of CO2 per km from the power it charges with, against 48 g for a petrol one (9% more, because of how this grid makes its power).
| Vehicle | Electric | Petrol or diesel | Difference |
|---|---|---|---|
| Motorbike | 52 | 48 | +9% |
| Bus | 969 | 1,673 | -42% |
| Small car (newer petrol car) | 156 | 125 | +25% |
Life-cycle figures, a cost calculator and city air: e-mobility.
Neighbors, sources and updates
Neighboring countries
Sudan Kenya Ethiopia DR Congo Central African Republic Uganda
More in the EAPP grid atlas, grid-edge atlas, second-life atlas and grid emission factors, or see all countries.
Sources 10 sources
- Grid lines: OpenStreetMap contributors (ODbL), with gap-fill from the World Bank Africa electricity grid (2017).
- Power plants: Global Energy Monitor, Global Integrated Power Tracker (September 2026), with WRI and curated public project sources.
- Capacity and access: national regulators and utilities, and the Tracking SDG7 Energy Progress Report 2026.
- People without night-time light and distance to the grid: WorldPop 2020 and gridfinder (Arderne et al. 2020, CC BY 4.0), as screened in our grid-edge atlas.
- Retiring solar and batteries: our second-life atlas model (central case, regular losses), from public project registers and IRENA lifetimes.
- Emission factors: our grid emission factors (Ember, 2024).
- Lit places: NASA Black Marble night lights, compared with our mapped lines (grid-edge atlas).
- Power from waste: FAOSTAT, Global Energy Monitor and OpenStreetMap sites, in our waste-to-energy model.
- Second-life demand: grid-edge screening, compact targets, World Bank Enterprise Surveys and health and school facility lists, in our second-life atlas.
- Transport per km: our grid emission factors and vehicle energy use; running costs from national pump prices and tariffs.
The maps are free to view. The data behind this page is available on request: email [email protected]. Lines are indicative, not for engineering or investment decisions.
What changed 3 updates
Our data is checked every month, and this page is rebuilt after each check.
- 19 November 2026 - Latest update to the EAPP grid atlas, which this page is generated from.
- 19 November 2026 - Posters updated for the 12 countries, with new A2 pairs for Djibouti, Sudan, South Sudan, Eritrea and Somalia.
- 19 November 2026 - Sudan, South Sudan, Eritrea, Somalia and Djibouti now shown in full (12 countries): their lines, substations and plants from OpenStreetMap, Global Energy Monitor, WRI and the World Bank 2017 map, and country figures from Ember (2024) and the World Bank.
Common questions about South Sudan
Where can I find a map of South Sudan's electricity grid?
The free EAPP grid atlas maps South Sudan's high-voltage lines, substations, power plants of 10 MW and above and planned projects. Open it zoomed to South Sudan.
How many people in South Sudan live without electricity?
About 8.1 million people live where satellites see no electric light at night, a proxy for living without power. Of them, 16% are within 15 km of a power line.
How long is South Sudan's transmission network?
About 227 km of mapped lines at 66 kV and above, mostly from OpenStreetMap.
How much power generation does South Sudan have?
Operating plants of 10 MW and above add up to about 164 MW in our atlas, with about 1,080 MW more under construction or planned.
What is the grid emission factor for South Sudan?
About 0.75 tCO2/MWh for electricity used in 2024, and 0.65 tCO2/MWh as a combined margin for carbon projects. See our grid emission factors for the method.
Can I get the data for South Sudan?
Yes, on request. The maps are free to view; email [email protected] and tell us what you need it for.
Spotted an error, or something missing on this page? Report an issue or send feedback