Country data

Eastern Africa Power Pool

Ethiopia electricity grid and access

About 93 million people in Ethiopia live where satellites see no electric light at night, and 93% of them live within 15 km of a power line. This page brings together what our open atlases show for Ethiopia: about 19,325 km of high-voltage lines, 10,855 MW of power plants and the projects still to come.

93 Mpeople live without night-time light, a proxy for no power
93%of them live within 15 km of a power line
19,325km of high-voltage lines, 66 kV and above
10,855MW of operating power plants, 10 MW and above
33power plants and transmission lines planned or under construction
The grid today

Lines, substations and demand

Ethiopia's mapped high-voltage network runs to about 19,325 km of lines at 66 kV and above, with 184 substations. The highest voltage on the map is 500 kV, and 61% of the line length runs at 220 kV or more. About 2,266 km come from older World Bank (2017) maps, used where OpenStreetMap has gaps. Installed capacity was about 9,752 MW (May 2026). The latest international tracking report puts access to electricity at 57% of people.

Mapped line length
Voltagekm
500 kV1,696
400 kV2,070
220 kV6,694
132 kV5,402
66 kV592
Voltage not recorded603
Gap-fill from older public maps2,266
Total19,325
Near the grid, not on it

Who lives near the grid but off it

About 93 million people in Ethiopia, roughly 71% of the population, live where satellites see no electric light at night. Of them, 93% live within 15 km of a mapped or predicted power line: 30 million within 2 km, 58 million 2 to 15 km away, and 6.1 million farther out. The largest group lives 2 to 15 km out: close enough to plan for the grid, too far for a quick connection. That is where mini-grids built to join the grid later can do the most good. At its 2016-2023 pace, about 2.0 percentage points a year (World Bank), Ethiopia would reach the 75% access target in its Mission 300 compact around 2033, not 2030; the target needs about 2.8 points a year.

  • Within 2 km: 30 million (32%)
  • 2 to 15 km: 58 million (62%)
  • More than 15 km: 6.1 million (7%)
See the numbers as a table
People without night-time light, by distance to a line
DistanceMillion peopleShare
Within 2 km of a line29.8632%
2 to 15 km57.5162%
More than 15 km6.107%
Total93.47100%
How we count this

"Without night-time light" is a satellite proxy, not a measured access rate. Distances are straight lines to mapped or predicted lines. See the grid-edge atlas for the method.

Generation and pipeline

Power plants and projects

There are 28 operating power plants of 10 MW and above, adding up to about 10,855 MW, 92% of it hydro. The largest is Grand Ethiopian Renaissance Dam (GERD) (5,150 MW, hydro). Another 29 plants totaling about 11,826 MW are under construction or planned, 1,920 MW of them under construction. Most of the pipeline is hydro. Koysha is 5 years behind its first promised date and now expected in 2028.

Four transmission projects touching Ethiopia are in our register.

  • Ethiopia-Djibouti second line 230 kV (Semera-Galafi-Nagad) (230 kV): under construction, expected 2026.
  • Ethiopia-Somaliland interconnector (Jigjiga-Hargeisa-Berbera) (400 kV): pre-feasibility, expected 2030.
  • Ethiopia-South Sudan 230 kV (Gambella-Malakal) (230 kV): pre-feasibility, expected 2030.
  • Ethiopia-Sudan second interconnector 500 kV (500 kV): feasibility, expected 2032.
Power plants of 10 MW and above
TypeOperating MWPipeline MW
Hydro9,9567,415
Oil87
Solar3,025
Wind5441,036
Geothermal350
Biomass268
Total10,85511,826
Topics

More about Ethiopia

Open any topic for the full text and tables.

Mission 300

What the energy compact commits to

Ethiopia's Mission 300 energy compact commits to raising electricity access from 44% to 75% by 2030.

Ethiopia's Mission 300 energy compact commits to raising electricity access from 44% to 75% by 2030. Each value is quoted, with its page, on our compacts page, where compacts sit side by side. Nothing is scored or ranked.

Mission 300 energy compact
CommitmentValue
Electricity access now44% (2025)
Access target75% by 2030
Clean cooking targetfrom 8% to 58% by 2030
Private investment soughtUS$3.06 billion
Rules for mini-grids when the grid arrivesMentioned only
E-waste commitmentNo
Waste to Wealth

Second life for solar and batteries

Between 2026 and 2040, about 1,400 tonnes of solar equipment and stationary batteries are expected to retire in Ethiopia, most of it off-grid solar kits and mini-grids.

Between 2026 and 2040, about 1,400 tonnes of solar equipment and stationary batteries are expected to retire in Ethiopia, most of it off-grid solar kits and mini-grids. That is 0.3% of the total for the 18 countries in our second-life atlas. Up to 1 MWh of retired batteries could be tested and reused as storage, for example in solar home systems, shops and mini-grids (0.0% of the atlas total). Eastern Africa and Madagascar have e-waste collection and dismantling, in Kenya and Rwanda, but no recycler for panels or lithium batteries yet, so this waste would have to travel to South Africa, mostly by sea to Durban.

Solar and batteries retiring, 2026-2040 (tonnes)
StreamTonnesShare of country
Solar panels53438%
Off-grid solar kits and mini-grids85362%
Total1,386100%
Ethiopia compared with the 18 countries in our second-life atlas, 2026-2040
EthiopiaAtlas totalShare
Retiring solar and batteries (tonnes)1,386412,6680.3%
Reusable battery storage (MWh)14,3220.0%
Retiring in 2030 (tonnes)76
Retiring in 2035 (tonnes)85
Retiring in 2040 (tonnes)140

From our second-life atlas, central case, by country. Electric vehicle batteries are modeled for the region as a whole, so they are not in these country figures.

Emissions

Grid emission factor

Each megawatt-hour generated in Ethiopia in 2024 came with close to zero tonnes of CO2.

Each megawatt-hour generated in Ethiopia in 2024 came with close to zero tonnes of CO2. For carbon projects such as solar mini-grids, the combined margin (the usual basis for crediting) is close to zero tCO2/MWh. Looking ahead, our scenarios from the plants in the pipeline put the average at 0.00 tCO2/MWh in 2030 and 0.01 in 2035, depending on how many plants arrive on time (see the scenarios). We have not yet rated the quality of its data. See our grid emission factors for the method and all 38 countries.

Grid mix, 2024.

Hydro 97% Wind 3%

Air in the city

Satellite-based estimates put fine particulate matter (PM2.5) in Addis Ababa, the capital, at about 23 µg/m³ on average in 2023, about 5 times the WHO guideline of 5, about the same as 23 in 2013. The WHO database has a ground measurement of 20 µg/m³ for 2019. Electric motorbikes and buses cut exhaust where people breathe it; see e-mobility for 71 cities.

Grid emission factor, 2024 (tCO2/MWh)
MeasuretCO2/MWh
Generated in country0.000
Electricity used, with imports0.000
Combined margin (for carbon projects)0.000
Tariffs and load shedding

What power costs here

Our utilities, tariffs and load shedding page compares 39 African countries by customer class, with what each tariff includes and load shedding since 2015.

Our utilities, tariffs and load shedding page compares 39 African countries by customer class, with what each tariff includes and load shedding since 2015.

Tariff and load shedding
MeasureValue
Load shedding nowNothing found

Energy charge only, at the central bank rate on 30 October 2026. Check what is included (VAT, levies, fixed charges) on the research page.

Certificates and carbon credits

Renewable energy certificates

Ethiopia can issue I-RECs, the international renewable energy certificate. 1 plants are registered (0 MW) and 529 MWh of certificates have been issued.

Ethiopia can issue I-RECs, the international renewable energy certificate. 1 plants are registered (0 MW) and 529 MWh of certificates have been issued. On the voluntary carbon registries it has 89 carbon credit projects, 44 of them issuing, with about 13.0 million credits issued; 7 are renewable energy projects. Under the Paris Agreement it has 2 bilateral Article 6 agreements and 5 activities approved for the UN's new crediting mechanism. Check it on the I-REC Standard site. See our certificates page to compare certificates with carbon credits across the region.

Certificates and carbon credits
MeasureValue
I-REC statusIssuing
Registered plants1 (0 MW)
I-RECs issued, all years529 MWh
Carbon credit projects89
Carbon credits issued13.0 million

I-RECs: Xpansiv I-REC Registry statistics, October 2026. Carbon projects: CarbonPlan OffsetsDB (Verra, Gold Standard and other voluntary registries), data to June 2026. Article 6: UNEP Copenhagen Climate Centre Article 6 Pipeline, November 2026.

Reference

Neighbors, sources and updates

Sources 8 sources
  • Grid lines: OpenStreetMap contributors (ODbL), with gap-fill from the World Bank Africa electricity grid (2017).
  • Power plants: Global Energy Monitor, Global Integrated Power Tracker (September 2026), with WRI and curated public project sources.
  • Capacity and access: national regulators and utilities, and the Tracking SDG7 Energy Progress Report 2026.
  • People without night-time light and distance to the grid: WorldPop 2020 and gridfinder (Arderne et al. 2020, CC BY 4.0), as screened in our grid-edge atlas.
  • Retiring solar and batteries: our second-life atlas model (central case, regular losses), from public project registers and IRENA lifetimes.
  • City air: Atmospheric Composition Analysis Group, Washington University in St. Louis (PM2.5 V6.GL.02.04); WHO Ambient Air Quality Database 2026.
  • Emission factors: our grid emission factors (Ember, 2024).
  • Compact commitments: the national Mission 300 energy compact, as quoted page by page on our compacts page.

The maps are free to view. The data behind this page is available on request: email [email protected]. Lines are indicative, not for engineering or investment decisions.

What changed

Our data is checked every month, and this page is rebuilt after each check.

  • 13 November 2026 - Latest update to the EAPP grid atlas, which this page is generated from.

Common questions about Ethiopia

Where can I find a map of Ethiopia's electricity grid?

The free EAPP grid atlas maps Ethiopia's high-voltage lines, substations, power plants of 10 MW and above and planned projects. Open it zoomed to Ethiopia.

How many people in Ethiopia live without electricity?

About 93 million people live where satellites see no electric light at night, a proxy for living without power. Of them, 93% are within 15 km of a power line.

How long is Ethiopia's transmission network?

About 19,325 km of mapped lines at 66 kV and above, mostly from OpenStreetMap, with older public maps filling gaps.

How much power generation does Ethiopia have?

Operating plants of 10 MW and above add up to about 10,855 MW in our atlas, with about 11,826 MW more under construction or planned.

What is the grid emission factor for Ethiopia?

About 0.00 tCO2/MWh for electricity used in 2024, and 0.00 tCO2/MWh as a combined margin for carbon projects. See our grid emission factors for the method.

What is Ethiopia's Mission 300 energy compact target?

Ethiopia's Mission 300 energy compact commits to raising electricity access from 44% to 75% by 2030. See all compacts side by side on our compacts page.

Can I get the data for Ethiopia?

Yes, on request. The maps are free to view; email [email protected] and tell us what you need it for.