Mission 300 compact country
Liberia electricity access and grid
About 3.0 million people in Liberia live where satellites see no electric light at night, and 75% of them live within 15 km of a power line. This page brings together what our grid-edge screening and Liberia's Mission 300 energy compact say about who still needs power, how close the grid is and what the country has committed to.
Open the grid-edge atlas Download the two-page brief (PDF) Distribution network map
Lines and access
Gridfinder, which combines OpenStreetMap lines with medium-voltage lines predicted from night-time lights, maps about 3,090 km of existing and likely power lines in Liberia. That includes lower-voltage distribution lines, so it is not comparable with the high-voltage totals on our grid-atlas country pages. We have not yet built a detailed grid atlas for this country.
| Commitment | Value |
|---|---|
| Electricity access now | 33% |
| Access target | 75% by 2030 |
| Planned split of new access | grid 60%, mini-grids 15%, standalone solar 25% |
| Private investment sought | US$0.15 billion |
| Rules for mini-grids when the grid arrives | Mentioned only |
| E-waste commitment | No |
Who lives near the grid but off it
About 3.0 million people in Liberia, roughly 53% of the population, live where satellites see no electric light at night. Of them, 75% live within 15 km of a mapped or predicted power line: 896,000 within 2 km, 1.3 million 2 to 15 km away, and 754,000 farther out. The largest group lives 2 to 15 km out: close enough to plan for the grid, too far for a quick connection. That is where mini-grids built to join the grid later can do the most good. At its 2016-2023 pace, about 2.0 percentage points a year (World Bank), Liberia would reach the 75% access target in its Mission 300 compact around 2044, not 2030; the target needs about 6.1 points a year.
- Within 2 km: 896,000 (30%)
- 2 to 15 km: 1.3 million (45%)
- More than 15 km: 754,000 (25%)
See the numbers as a table
| Distance | Million people | Share |
|---|---|---|
| Within 2 km of a line | 0.90 | 30% |
| 2 to 15 km | 1.34 | 45% |
| More than 15 km | 0.75 | 25% |
| Total | 2.99 | 100% |
How we count this
"Without night-time light" is a satellite proxy, not a measured access rate. Distances are straight lines to mapped or predicted lines. See the grid-edge atlas for the method.
More about Liberia
Open any topic for the full text and tables.
Mission 300What the energy compact commits to
Liberia's Mission 300 energy compact commits to raising electricity access from 33% to 75% by 2030. New access is planned as 60% grid, 15% mini-grids and 25% standalone solar. Each value is quoted, with its page, on our compacts page, where compacts sit side by side. Nothing is scored or ranked.
EmissionsGrid emission factor
Each megawatt-hour generated in Liberia in 2024 came with about 0.35 tonnes of CO2. For carbon projects such as solar mini-grids, the combined margin (the usual basis for crediting) is about 0.23 tCO2/MWh. Looking ahead, our scenarios from the plants in the pipeline put the average at 0.54 tCO2/MWh in 2030 and 0.54 in 2035, depending on how many plants arrive on time (see the scenarios). We have not yet rated the quality of its data. See our grid emission factors for the method and all 38 countries.
Grid mix, 2024.
Oil and diesel 46% Hydro 53% Solar 2%
Air in the city
Satellite-based estimates put fine particulate matter (PM2.5) in Monrovia, the capital, at about 22 µg/m³ on average in 2023, about 4 times the WHO guideline of 5, up from 20 in 2013. On OpenAQ, 2 low-cost sensors in and around the city averaged about 22 over the 12 months to October 2026. Electric motorbikes and buses cut exhaust where people breathe it; see e-mobility for 71 cities.
| Measure | tCO2/MWh |
|---|---|
| Generated in country | 0.348 |
| Electricity used, with imports | 0.348 |
| Combined margin (for carbon projects) | 0.231 |
Tariffs and load sheddingWhat power costs here
Liberia Electricity Corporation (LEC)'s Residential (prepaid and postpaid) tariff, in force from 1 January 2026. Our utilities, tariffs and load shedding page compares 39 African countries by customer class, with what each tariff includes and load shedding since 2015.
| Measure | Value |
|---|---|
| Lifeline or first block (25 kWh/month or less) | 0.13 USD/kWh, about US$0.130 |
| Household (single rate) | 0.22 USD/kWh, about US$0.220 |
Energy charge only, at the central bank rate on 30 October 2026. Check what is included (VAT, levies, fixed charges) on the research page.
Certificates and carbon creditsRenewable energy certificates
Liberia cannot issue I-RECs, the international renewable energy certificate, yet. On the voluntary carbon registries it has 3 carbon credit projects, 1 of them issuing, with about 0.0 million credits issued; 0 are renewable energy projects. See our certificates page to compare certificates with carbon credits across the region.
| Measure | Value |
|---|---|
| I-REC status | Not approved |
| Registered plants | - |
| I-RECs issued, all years | - |
| Carbon credit projects | 3 |
| Carbon credits issued | 0.0 million |
I-RECs: Xpansiv I-REC Registry statistics, October 2026. Carbon projects: CarbonPlan OffsetsDB (Verra, Gold Standard and other voluntary registries), data to June 2026. Article 6: UNEP Copenhagen Climate Centre Article 6 Pipeline, November 2026.
Neighbors, sources and updates
Neighboring countries
Sierra Leone Guinea Côte d'Ivoire
More in the grid-edge atlas, grid emission factors and Mission 300 compacts, or see all countries.
Sources 4 sources
- People without night-time light and distance to the grid: WorldPop 2020 and gridfinder (Arderne et al. 2020, CC BY 4.0), as screened in our grid-edge atlas.
- City air: Atmospheric Composition Analysis Group, Washington University in St. Louis (PM2.5 V6.GL.02.04); WHO Ambient Air Quality Database 2026; OpenAQ (sensor data, November 2025 to October 2026).
- Emission factors: our grid emission factors (Ember, 2024).
- Compact commitments: the national Mission 300 energy compact, as quoted page by page on our compacts page.
The maps are free to view. The data behind this page is available on request: email [email protected]. Lines are indicative, not for engineering or investment decisions.
What changed 2 updates
Our data is checked every month, and this page is rebuilt after each check.
- 16 November 2026 - Latest update to the grid-edge atlas, which this page is generated from.
- 9 November 2026 - Night lights: method improved. Lights now count at 1 nW lit in two of the last three years, and people come from Google Open Buildings. For the typical country the lit share now comes within about 1 point of its national access rate. Utility distribution maps for West Africa, Uganda, Zambia, Liberia, Mauritania and Kano added: 21,400 lit places sit 2 km or more from any mapped line.
Common questions about Liberia
Where can I find a map of Liberia's electricity grid?
Our free grid-edge atlas shows Liberia with mapped and predicted power lines and where people without power live. A detailed high-voltage atlas is not built yet.
How many people in Liberia live without electricity?
About 3.0 million people live where satellites see no electric light at night, a proxy for living without power. Of them, 75% are within 15 km of a power line.
What is the grid emission factor for Liberia?
About 0.35 tCO2/MWh for electricity used in 2024, and 0.23 tCO2/MWh as a combined margin for carbon projects. See our grid emission factors for the method.
What is Liberia's Mission 300 energy compact target?
Liberia's Mission 300 energy compact commits to raising electricity access from 33% to 75% by 2030. New access is planned as 60% grid, 15% mini-grids and 25% standalone solar. See all compacts side by side on our compacts page.
Can I get the data for Liberia?
Yes, on request. The maps are free to view; email [email protected] and tell us what you need it for.