Regional reports

Eastern Africa Power Pool

EAPP regional report

The Eastern Africa Power Pool (EAPP) side by side: power plants and lines, the generation mix, Mission 300 compacts, prices, carbon, access, drought risk, storage and waste for each country, with a pool total. About 527 million people live in the 11 countries in our data; our atlases map about 28,998 MW of operating plants and 68,051 MW more planned or under construction.

11countries in our data
313 Mpeople live without night-time light, a proxy for no power
78%of them live within 15 km of a power line
28,998MW of operating power plants, 10 MW and above
7countries with a Mission 300 compact in our data

Download the regional report (PDF, 0.4 MB, November 2026) Rapport régional en français (PDF, novembre 2026) Relatório regional em português (PDF, novembro de 2026) Open the EAPP grid atlas

Formed in 2005, it has thirteen member countries. Our data covers eleven of them; Egypt and Libya are not in it yet. Eritrea is not a member but is on our EAPP atlas, so it is shown for reference.

Grid and generation

Power plants, lines and the generation mix

Across the 11 EAPP countries in our data, our atlases map about 28,998 MW of operating power plants of 10 MW and above (hydro 72%, oil and diesel 11%, wind 4%), about 3,071 MW under construction and about 64,980 MW more planned. Hydro is the largest source in 7 of the 11 countries.

The mapped high-voltage network runs to about 58,508 km of lines.

Power plants and lines by country
CountryOperating (MW)Largest sourceUnder construction (MW)Planned (MW)Lines (km)Top voltageSubstations
Burundi224Hydro (51%)00480220 kV9
DR Congo3,884Hydro (84%)3983,6019,846500 kV142
Djibouti327Solar (49%)010,240276220 kV6
Eritrea (not a member)268Oil and diesel (100%)042324132 kV3
Ethiopia10,855Hydro (92%)1,9209,90619,130500 kV184
Kenya3,381Oil and diesel (25%)1139,4767,477500 kV65
Rwanda429Hydro (56%)446051,296220 kV28
Somalia125Oil and diesel (100%)01326-0
South Sudan164Oil and diesel (72%)01,080227220 kV1
Sudan3,760Hydro (50%)1701,2007,162500 kV65
Tanzania3,870Hydro (75%)4028,1489,206400 kV64
Uganda1,980Hydro (80%)2420,5933,401400 kV22
EAPP total28,998Hydro (72%)3,07164,98058,508586
Generation mix by country
Burundi
DR Congo
Djibouti
Eritrea
Ethiopia
Kenya
Rwanda
Somalia
South Sudan
Sudan
Tanzania
Uganda
EAPP total
CoalGasOil and dieselNuclearHydroSolarWindGeothermal, bioenergy and other
Electricity generation by source, 2024
CountryGeneration (TWh)CoalGasOil and dieselNuclearHydroSolarWindGeothermal, bioenergy and other
Burundi0.5--24%-73%--2%
DR Congo15.9----84%16%--
Djibouti0.2--65%---35%-
Eritrea (not a member)0.5--89%--11%--
Ethiopia25.2----97%-3%-
Kenya13.3--9%-23%5%16%47%
Rwanda1.115%27%9%-46%4%--
Somalia0.4--79%--19%2%-
South Sudan0.6--98%--2%--
Sudan14.8--20%-78%1%-1%
Tanzania8.8-63%4%-32%--1%
Uganda5.8--3%-86%3%-8%
EAPP total86.6-7%7%-71%4%3%8%
Capacity and peak demand, latest published
CountryCapacity (MW)Peak demand (MW)As of
Burundi166-2025
DR Congo1,6502,379August 2026
Djibouti200-2024
Eritrea (not a member)230-2024
Ethiopia9,752-May 2026
Kenya3,8692,439Dec 2025
Rwanda467234Q2 2024
Somalia110-2024
South Sudan230-2024
Sudan4,020-2024
Tanzania3,0921,9442025
Uganda2,0481,3512025
Cross-border line projects we track: 5 completed, 5 under construction, 11 in preparation
CountriesVoltageStatusYear
Ethiopia-Kenya500 kVCompleted2022
Uganda-Rwanda220 kVCompleted2023
Kenya-Tanzania400 kVCompleted2024
Rwanda-Burundi-Tanzania220 kVCompleted2024
Republic of the Congo-DR Congo220 kVCompleted-
Ethiopia-Djibouti230 kVUnder construction2026 (expected)
Kenya-Uganda400 kVUnder construction2027 (expected)
Rwanda-Burundi220 kVUnder construction2027 (expected)
Rwanda-DR Congo220 kVUnder construction2027 (expected)
Burundi-DR Congo220 kVUnder construction2028 (expected)
Uganda-South Sudan400 kVIn preparation2028 (expected)
Uganda-Tanzania400 kVIn preparation2029 (expected)
DR Congo-Rwanda-Burundi220 kVIn preparation2030 (expected)
Ethiopia-Somalia400 kVIn preparation2030 (expected)
Ethiopia-South Sudan230 kVIn preparation2030 (expected)
Uganda-DR Congo220 kVIn preparation2030 (expected)
Ethiopia-Sudan500 kVIn preparation2032 (expected)
Angola-DR Congo-In preparation-
DR Congo-Angola-In preparation-
Mozambique-Tanzania-In preparation-
Zambia-DR Congo330 kVIn preparation-

Capacity is what the country or EAPP reports (available capacity in the SAPP monthly report, installed capacity elsewhere); it is not the same as our mapped plants. GEM marks the plant total from Global Energy Monitor where no national figure is published. The project table lists lines in our project tracker; older interconnectors are on the atlas and the interconnector limits page. Every plant and line: the EAPP grid atlas.

Mission 300 compacts compared

What the compacts say, side by side

7 of the 11 EAPP countries in our data have published a Mission 300 national energy compact. Together they seek about US$44.2 billion of private investment by 2030. 2 set out how to handle e-waste from solar kits and batteries, and 3 say what happens to mini-grids when the main grid arrives.

No compact in our data: Djibouti, Somalia, South Sudan, Sudan.

Set the split beside the access section below, which shows where the people without power live by distance to a mapped line: a compact that relies on the grid fits a country where most of them live within 2 km.

Access targets and how they are split
CountryAccess nowTargetGridMini-gridStandaloneWhat the split measures
Burundi25.9% in 202570% by 203060%13%27%Share of new connections
DR Congo21.5% in 202462% by 203044%56%0%Share of new connections
Ethiopia44% in 202575% by 2030---Not split
Kenya75% in 2024100% by 203096%4%0%Share of new connections
Rwanda84% in 2025100% by 2030---Not split
Tanzania46% in 202275% by 2030---Not split
Uganda60% in 202585% by 2030---Not split
What each compact commits to
CountryProductive useE-wasteLeast-cost or GIS planMini-grid rules when the grid arrivesCost-reflective tariffPrivate investment sought (US$ billion)
BurundiMentionedYesExistsYesCommitted1.5
DR CongoMentionedNoExistsYesCommitted20
EthiopiaYesNoExistsMentionedCommitted3.1
KenyaYesYesExistsMentionedCommitted5.1
RwandaYesNoExistsMentionedCommitted1.0
TanzaniaMentionedNoExistsMentionedCommitted4.0
UgandaMentionedNoExistsYesCommitted9.4

Read from each compact document, with page numbers and quotes for every value: Mission 300 compacts compared. "Not stated" means the compact does not say.

Prices

What power costs across the pool

Household tariffs are the energy charge at the central bank exchange rate; check on the tariffs page what each includes. Our power price data holds 17 deals in EAPP countries, from auctions, signed power purchase agreements and published bids.

Household tariffs and load shedding
CountryUtilityHousehold (US$/kWh)Lifeline or first block (US$/kWh)Load shedding
BurundiREGIDESO0.0460.023Cuts reported
DR CongoSNEL0.0890.039Cuts reported
Djibouti---None reported
Eritrea (not a member)---None reported
Ethiopia---No data
KenyaKenya Power0.1270.093None reported
RwandaREG (EUCL)0.2100.060None reported
SomaliaBECO (Mogadishu)0.460-None reported
South SudanJuba Electricity Distribution Company (JEDCO)0.273-None reported
Sudan---Cuts reported
TanzaniaTANESCO0.1110.038None reported
UgandaUEDCL0.1790.058Cuts reported
Power deals signed or bid in the pool, US$/MWh as signed
SourceDealsMedianLowestHighest
Hydro5501384
Geothermal38864134
Imports across a border36565155
Gas210998120
Coal175--
Diesel and fuel oil1230--
Solar PV125--
Wind1105--

Every tariff and status with its source: utilities, tariffs and load shedding. Every deal with its source: power prices and deals. Load shedding is grouped from the status we last read for each country.

Carbon

Grid carbon and carbon markets

6 of the 11 EAPP countries in our data issue I-REC renewable energy certificates, about 1.4 TWh to date. The grid factor is the average CO2 per MWh of electricity used; a low factor means grid power, electric transport and new grid connections add little CO2.

Grid carbon, certificates and carbon markets
CountryGrid factor (tCO2/MWh)YearI-REC certificatesIssued to date (GWh)Article 6 deals and activitiesNet CO2 avoided by new connections (t a year)
Burundi0.1612024Approved, none issued-0-19,931
DR Congo0.0612024Issuing110174,106
Djibouti0.1272024Not approved-0-6,383
Eritrea (not a member)0.6772024Not approved-0-43,443
Ethiopia0.0002024Issuing12164,111
Kenya0.0592024Issuing67612176,684
Rwanda0.3232024Not approved-17-47,883
Somalia0.6032024Issuing10-19,987
South Sudan0.7492024Issuing20-
Sudan0.1472024Not approved-0-49,693
Tanzania0.3582024Not approved-4-441,814
Uganda0.0222024Issuing7470138,101

Methods: grid emission factors, clean energy certificates and carbon per connection (central case, new connections to 2030 under each compact or national target). A negative value means the new connections add CO2 on net, because the grid power they use emits more than the kerosene and diesel they replace.

Access

Who lives near the grid but not on it

About 313 million people in the EAPP countries in our data live where satellites see no electric light at night, out of about 527 million. 78% of them live within 15 km of a mapped power line, and 29% within 2 km, close enough for a grid connection to be the obvious first step.

Satellites also see 4,105 lit places 2 km or more from any mapped line: missing lines, mines and plants with their own power, or mini-grids.

People without power and how far they live from the grid
CountryPeople (million)Without night light (million)Within 2 km of a line2 to 15 kmBeyond 15 kmMedian distance (km)Lit places off the map
Burundi141033%66%1%3.545
DR Congo1098330%30%40%7.7160
Djibouti1.20.147%38%14%2.315
Eritrea (not a member)3.52.733%40%27%5.526
Ethiopia1329332%62%7%3.9472
Kenya561741%54%5%2.490
Rwanda147.335%64%0%2.8113
Somalia198.22%5%93%496.1155
South Sudan128.15%11%84%81.883
Sudan501615%35%50%14.51,195
Tanzania693526%59%15%4.61,756
Uganda503434%60%6%3.321
EAPP total52731329%48%22%4,105

Night-time light is a proxy for no power, not a household survey. Map and method: the grid-edge atlas.

Risk, storage and waste

Drought, battery sites, waste and second life

A dry year that takes a fifth of hydro output would cost the EAPP countries about 1,201 MW on average over the year, and a severe drought (two fifths) about 2,404 MW. 29 coal, gas and oil plant sites with about 4,087 MW of grid connection could host batteries as they close. Waste could fuel about 923 MW of power, and about 61,864 t of solar panels, kits and batteries will reach end of life from 2026 to 2040.

Drought risk, storage sites, waste and second life
CountryHydro in operating plantsDry year, MW lostSevere drought, MW lostThermal plant sites for batteries (MW)Power from waste (MW)Solar and battery waste 2026-2040 (t)Second-life panel demand (MWp)
Burundi51%714-101,214656
DR Congo84%302605-12410,4055,416
Djibouti---10823,397110
Eritrea (not a member)---134183188
Ethiopia92%371743-1701,4795,007
Kenya26%7114371416725,7125,640
Rwanda55%122556122,658578
Somalia---6511,9451,337
South Sudan----41,063694
Sudan50%2615212,1511147124,500
Tanzania68%661318041776,3583,562
Uganda81%1112221891426,9212,200
EAPP total1,2012,4044,08792361,86429,698

Methods: hydro and drought, power plant to battery site, power from waste and the second-life atlas. Central cases throughout.

Country pages

Every country in this report

Each country page has the detail behind these tables and its own country report to download.

Burundi DR Congo Djibouti Eritrea Ethiopia Kenya Rwanda Somalia South Sudan Sudan Tanzania Uganda

Other power pools: SAPP WAPP CAPP

Sources and method

  • Plants and lines: our grid atlases (Global Energy Monitor, WRI, OpenStreetMap, World Bank and national sources). Generation mix: Ember. Capacity and peak demand: SAPP monthly report and national regulators and utilities.
  • Compacts: the published Mission 300 national energy compacts and World Bank compact progress reports. Distances: our grid-edge atlas.
  • Tariffs and load shedding: utility tariff books, regulators and news reports (Utilities and Tariffs data). Deals: auction results, regulators, utilities and trade press (power prices data).
  • Grid factors: Ember and national data, in our grid emission factors. Certificates: the I-REC registry (Evident). Article 6: UNEP-CCC Article 6 pipeline.
  • Access: WorldPop population, NASA Black Marble night lights, Google Open Buildings and our mapped lines (grid-edge atlas).
  • Hydro: our grid atlases and Ember. Thermal sites: Global Energy Monitor (September 2026). Waste: FAOSTAT, Global Energy Monitor and OpenStreetMap. Second life: IRENA, compact targets and our second-life atlas.

Rows run in alphabetical order. These are side-by-side facts, not scores or rankings. A dash means we hold no data for that country. Pool totals count member countries only. Rebuilt every month with the country reports. Free to share under CC BY 4.0.