Eastern Africa Power Pool
EAPP regional report
The Eastern Africa Power Pool (EAPP) side by side: power plants and lines, the generation mix, Mission 300 compacts, prices, carbon, access, drought risk, storage and waste for each country, with a pool total. About 527 million people live in the 11 countries in our data; our atlases map about 28,998 MW of operating plants and 68,051 MW more planned or under construction.
Download the regional report (PDF, 0.4 MB, November 2026) Rapport régional en français (PDF, novembre 2026) Relatório regional em português (PDF, novembro de 2026) Open the EAPP grid atlas
Formed in 2005, it has thirteen member countries. Our data covers eleven of them; Egypt and Libya are not in it yet. Eritrea is not a member but is on our EAPP atlas, so it is shown for reference.
Power plants, lines and the generation mix
Across the 11 EAPP countries in our data, our atlases map about 28,998 MW of operating power plants of 10 MW and above (hydro 72%, oil and diesel 11%, wind 4%), about 3,071 MW under construction and about 64,980 MW more planned. Hydro is the largest source in 7 of the 11 countries.
The mapped high-voltage network runs to about 58,508 km of lines.
| Country | Operating (MW) | Largest source | Under construction (MW) | Planned (MW) | Lines (km) | Top voltage | Substations |
|---|---|---|---|---|---|---|---|
| Burundi | 224 | Hydro (51%) | 0 | 0 | 480 | 220 kV | 9 |
| DR Congo | 3,884 | Hydro (84%) | 398 | 3,601 | 9,846 | 500 kV | 142 |
| Djibouti | 327 | Solar (49%) | 0 | 10,240 | 276 | 220 kV | 6 |
| Eritrea (not a member) | 268 | Oil and diesel (100%) | 0 | 42 | 324 | 132 kV | 3 |
| Ethiopia | 10,855 | Hydro (92%) | 1,920 | 9,906 | 19,130 | 500 kV | 184 |
| Kenya | 3,381 | Oil and diesel (25%) | 113 | 9,476 | 7,477 | 500 kV | 65 |
| Rwanda | 429 | Hydro (56%) | 44 | 605 | 1,296 | 220 kV | 28 |
| Somalia | 125 | Oil and diesel (100%) | 0 | 132 | 6 | - | 0 |
| South Sudan | 164 | Oil and diesel (72%) | 0 | 1,080 | 227 | 220 kV | 1 |
| Sudan | 3,760 | Hydro (50%) | 170 | 1,200 | 7,162 | 500 kV | 65 |
| Tanzania | 3,870 | Hydro (75%) | 402 | 8,148 | 9,206 | 400 kV | 64 |
| Uganda | 1,980 | Hydro (80%) | 24 | 20,593 | 3,401 | 400 kV | 22 |
| EAPP total | 28,998 | Hydro (72%) | 3,071 | 64,980 | 58,508 | 586 |
| Country | Generation (TWh) | Coal | Gas | Oil and diesel | Nuclear | Hydro | Solar | Wind | Geothermal, bioenergy and other |
|---|---|---|---|---|---|---|---|---|---|
| Burundi | 0.5 | - | - | 24% | - | 73% | - | - | 2% |
| DR Congo | 15.9 | - | - | - | - | 84% | 16% | - | - |
| Djibouti | 0.2 | - | - | 65% | - | - | - | 35% | - |
| Eritrea (not a member) | 0.5 | - | - | 89% | - | - | 11% | - | - |
| Ethiopia | 25.2 | - | - | - | - | 97% | - | 3% | - |
| Kenya | 13.3 | - | - | 9% | - | 23% | 5% | 16% | 47% |
| Rwanda | 1.1 | 15% | 27% | 9% | - | 46% | 4% | - | - |
| Somalia | 0.4 | - | - | 79% | - | - | 19% | 2% | - |
| South Sudan | 0.6 | - | - | 98% | - | - | 2% | - | - |
| Sudan | 14.8 | - | - | 20% | - | 78% | 1% | - | 1% |
| Tanzania | 8.8 | - | 63% | 4% | - | 32% | - | - | 1% |
| Uganda | 5.8 | - | - | 3% | - | 86% | 3% | - | 8% |
| EAPP total | 86.6 | - | 7% | 7% | - | 71% | 4% | 3% | 8% |
| Countries | Voltage | Status | Year |
|---|---|---|---|
| Ethiopia-Kenya | 500 kV | Completed | 2022 |
| Uganda-Rwanda | 220 kV | Completed | 2023 |
| Kenya-Tanzania | 400 kV | Completed | 2024 |
| Rwanda-Burundi-Tanzania | 220 kV | Completed | 2024 |
| Republic of the Congo-DR Congo | 220 kV | Completed | - |
| Ethiopia-Djibouti | 230 kV | Under construction | 2026 (expected) |
| Kenya-Uganda | 400 kV | Under construction | 2027 (expected) |
| Rwanda-Burundi | 220 kV | Under construction | 2027 (expected) |
| Rwanda-DR Congo | 220 kV | Under construction | 2027 (expected) |
| Burundi-DR Congo | 220 kV | Under construction | 2028 (expected) |
| Uganda-South Sudan | 400 kV | In preparation | 2028 (expected) |
| Uganda-Tanzania | 400 kV | In preparation | 2029 (expected) |
| DR Congo-Rwanda-Burundi | 220 kV | In preparation | 2030 (expected) |
| Ethiopia-Somalia | 400 kV | In preparation | 2030 (expected) |
| Ethiopia-South Sudan | 230 kV | In preparation | 2030 (expected) |
| Uganda-DR Congo | 220 kV | In preparation | 2030 (expected) |
| Ethiopia-Sudan | 500 kV | In preparation | 2032 (expected) |
| Angola-DR Congo | - | In preparation | - |
| DR Congo-Angola | - | In preparation | - |
| Mozambique-Tanzania | - | In preparation | - |
| Zambia-DR Congo | 330 kV | In preparation | - |
Capacity is what the country or EAPP reports (available capacity in the SAPP monthly report, installed capacity elsewhere); it is not the same as our mapped plants. GEM marks the plant total from Global Energy Monitor where no national figure is published. The project table lists lines in our project tracker; older interconnectors are on the atlas and the interconnector limits page. Every plant and line: the EAPP grid atlas.
What the compacts say, side by side
7 of the 11 EAPP countries in our data have published a Mission 300 national energy compact. Together they seek about US$44.2 billion of private investment by 2030. 2 set out how to handle e-waste from solar kits and batteries, and 3 say what happens to mini-grids when the main grid arrives.
No compact in our data: Djibouti, Somalia, South Sudan, Sudan.
Set the split beside the access section below, which shows where the people without power live by distance to a mapped line: a compact that relies on the grid fits a country where most of them live within 2 km.
| Country | Access now | Target | Grid | Mini-grid | Standalone | What the split measures |
|---|---|---|---|---|---|---|
| Burundi | 25.9% in 2025 | 70% by 2030 | 60% | 13% | 27% | Share of new connections |
| DR Congo | 21.5% in 2024 | 62% by 2030 | 44% | 56% | 0% | Share of new connections |
| Ethiopia | 44% in 2025 | 75% by 2030 | - | - | - | Not split |
| Kenya | 75% in 2024 | 100% by 2030 | 96% | 4% | 0% | Share of new connections |
| Rwanda | 84% in 2025 | 100% by 2030 | - | - | - | Not split |
| Tanzania | 46% in 2022 | 75% by 2030 | - | - | - | Not split |
| Uganda | 60% in 2025 | 85% by 2030 | - | - | - | Not split |
| Country | Productive use | E-waste | Least-cost or GIS plan | Mini-grid rules when the grid arrives | Cost-reflective tariff | Private investment sought (US$ billion) |
|---|---|---|---|---|---|---|
| Burundi | Mentioned | Yes | Exists | Yes | Committed | 1.5 |
| DR Congo | Mentioned | No | Exists | Yes | Committed | 20 |
| Ethiopia | Yes | No | Exists | Mentioned | Committed | 3.1 |
| Kenya | Yes | Yes | Exists | Mentioned | Committed | 5.1 |
| Rwanda | Yes | No | Exists | Mentioned | Committed | 1.0 |
| Tanzania | Mentioned | No | Exists | Mentioned | Committed | 4.0 |
| Uganda | Mentioned | No | Exists | Yes | Committed | 9.4 |
Read from each compact document, with page numbers and quotes for every value: Mission 300 compacts compared. "Not stated" means the compact does not say.
What power costs across the pool
Household tariffs are the energy charge at the central bank exchange rate; check on the tariffs page what each includes. Our power price data holds 17 deals in EAPP countries, from auctions, signed power purchase agreements and published bids.
| Country | Utility | Household (US$/kWh) | Lifeline or first block (US$/kWh) | Load shedding |
|---|---|---|---|---|
| Burundi | REGIDESO | 0.046 | 0.023 | Cuts reported |
| DR Congo | SNEL | 0.089 | 0.039 | Cuts reported |
| Djibouti | - | - | - | None reported |
| Eritrea (not a member) | - | - | - | None reported |
| Ethiopia | - | - | - | No data |
| Kenya | Kenya Power | 0.127 | 0.093 | None reported |
| Rwanda | REG (EUCL) | 0.210 | 0.060 | None reported |
| Somalia | BECO (Mogadishu) | 0.460 | - | None reported |
| South Sudan | Juba Electricity Distribution Company (JEDCO) | 0.273 | - | None reported |
| Sudan | - | - | - | Cuts reported |
| Tanzania | TANESCO | 0.111 | 0.038 | None reported |
| Uganda | UEDCL | 0.179 | 0.058 | Cuts reported |
| Source | Deals | Median | Lowest | Highest |
|---|---|---|---|---|
| Hydro | 5 | 50 | 13 | 84 |
| Geothermal | 3 | 88 | 64 | 134 |
| Imports across a border | 3 | 65 | 65 | 155 |
| Gas | 2 | 109 | 98 | 120 |
| Coal | 1 | 75 | - | - |
| Diesel and fuel oil | 1 | 230 | - | - |
| Solar PV | 1 | 25 | - | - |
| Wind | 1 | 105 | - | - |
Every tariff and status with its source: utilities, tariffs and load shedding. Every deal with its source: power prices and deals. Load shedding is grouped from the status we last read for each country.
Grid carbon and carbon markets
6 of the 11 EAPP countries in our data issue I-REC renewable energy certificates, about 1.4 TWh to date. The grid factor is the average CO2 per MWh of electricity used; a low factor means grid power, electric transport and new grid connections add little CO2.
| Country | Grid factor (tCO2/MWh) | Year | I-REC certificates | Issued to date (GWh) | Article 6 deals and activities | Net CO2 avoided by new connections (t a year) |
|---|---|---|---|---|---|---|
| Burundi | 0.161 | 2024 | Approved, none issued | - | 0 | -19,931 |
| DR Congo | 0.061 | 2024 | Issuing | 11 | 0 | 174,106 |
| Djibouti | 0.127 | 2024 | Not approved | - | 0 | -6,383 |
| Eritrea (not a member) | 0.677 | 2024 | Not approved | - | 0 | -43,443 |
| Ethiopia | 0.000 | 2024 | Issuing | 1 | 2 | 164,111 |
| Kenya | 0.059 | 2024 | Issuing | 676 | 12 | 176,684 |
| Rwanda | 0.323 | 2024 | Not approved | - | 17 | -47,883 |
| Somalia | 0.603 | 2024 | Issuing | 1 | 0 | -19,987 |
| South Sudan | 0.749 | 2024 | Issuing | 2 | 0 | - |
| Sudan | 0.147 | 2024 | Not approved | - | 0 | -49,693 |
| Tanzania | 0.358 | 2024 | Not approved | - | 4 | -441,814 |
| Uganda | 0.022 | 2024 | Issuing | 747 | 0 | 138,101 |
Methods: grid emission factors, clean energy certificates and carbon per connection (central case, new connections to 2030 under each compact or national target). A negative value means the new connections add CO2 on net, because the grid power they use emits more than the kerosene and diesel they replace.
Who lives near the grid but not on it
About 313 million people in the EAPP countries in our data live where satellites see no electric light at night, out of about 527 million. 78% of them live within 15 km of a mapped power line, and 29% within 2 km, close enough for a grid connection to be the obvious first step.
Satellites also see 4,105 lit places 2 km or more from any mapped line: missing lines, mines and plants with their own power, or mini-grids.
| Country | People (million) | Without night light (million) | Within 2 km of a line | 2 to 15 km | Beyond 15 km | Median distance (km) | Lit places off the map |
|---|---|---|---|---|---|---|---|
| Burundi | 14 | 10 | 33% | 66% | 1% | 3.5 | 45 |
| DR Congo | 109 | 83 | 30% | 30% | 40% | 7.7 | 160 |
| Djibouti | 1.2 | 0.1 | 47% | 38% | 14% | 2.3 | 15 |
| Eritrea (not a member) | 3.5 | 2.7 | 33% | 40% | 27% | 5.5 | 26 |
| Ethiopia | 132 | 93 | 32% | 62% | 7% | 3.9 | 472 |
| Kenya | 56 | 17 | 41% | 54% | 5% | 2.4 | 90 |
| Rwanda | 14 | 7.3 | 35% | 64% | 0% | 2.8 | 113 |
| Somalia | 19 | 8.2 | 2% | 5% | 93% | 496.1 | 155 |
| South Sudan | 12 | 8.1 | 5% | 11% | 84% | 81.8 | 83 |
| Sudan | 50 | 16 | 15% | 35% | 50% | 14.5 | 1,195 |
| Tanzania | 69 | 35 | 26% | 59% | 15% | 4.6 | 1,756 |
| Uganda | 50 | 34 | 34% | 60% | 6% | 3.3 | 21 |
| EAPP total | 527 | 313 | 29% | 48% | 22% | 4,105 |
Night-time light is a proxy for no power, not a household survey. Map and method: the grid-edge atlas.
Drought, battery sites, waste and second life
A dry year that takes a fifth of hydro output would cost the EAPP countries about 1,201 MW on average over the year, and a severe drought (two fifths) about 2,404 MW. 29 coal, gas and oil plant sites with about 4,087 MW of grid connection could host batteries as they close. Waste could fuel about 923 MW of power, and about 61,864 t of solar panels, kits and batteries will reach end of life from 2026 to 2040.
| Country | Hydro in operating plants | Dry year, MW lost | Severe drought, MW lost | Thermal plant sites for batteries (MW) | Power from waste (MW) | Solar and battery waste 2026-2040 (t) | Second-life panel demand (MWp) |
|---|---|---|---|---|---|---|---|
| Burundi | 51% | 7 | 14 | - | 10 | 1,214 | 656 |
| DR Congo | 84% | 302 | 605 | - | 124 | 10,405 | 5,416 |
| Djibouti | - | - | - | 108 | 2 | 3,397 | 110 |
| Eritrea (not a member) | - | - | - | 134 | 1 | 831 | 88 |
| Ethiopia | 92% | 371 | 743 | - | 170 | 1,479 | 5,007 |
| Kenya | 26% | 71 | 143 | 714 | 167 | 25,712 | 5,640 |
| Rwanda | 55% | 12 | 25 | 56 | 12 | 2,658 | 578 |
| Somalia | - | - | - | 65 | 1 | 1,945 | 1,337 |
| South Sudan | - | - | - | - | 4 | 1,063 | 694 |
| Sudan | 50% | 261 | 521 | 2,151 | 114 | 712 | 4,500 |
| Tanzania | 68% | 66 | 131 | 804 | 177 | 6,358 | 3,562 |
| Uganda | 81% | 111 | 222 | 189 | 142 | 6,921 | 2,200 |
| EAPP total | 1,201 | 2,404 | 4,087 | 923 | 61,864 | 29,698 |
Methods: hydro and drought, power plant to battery site, power from waste and the second-life atlas. Central cases throughout.
Every country in this report
Each country page has the detail behind these tables and its own country report to download.
Burundi DR Congo Djibouti Eritrea Ethiopia Kenya Rwanda Somalia South Sudan Sudan Tanzania Uganda
Other power pools: SAPP WAPP CAPP
Sources and method
- Plants and lines: our grid atlases (Global Energy Monitor, WRI, OpenStreetMap, World Bank and national sources). Generation mix: Ember. Capacity and peak demand: SAPP monthly report and national regulators and utilities.
- Compacts: the published Mission 300 national energy compacts and World Bank compact progress reports. Distances: our grid-edge atlas.
- Tariffs and load shedding: utility tariff books, regulators and news reports (Utilities and Tariffs data). Deals: auction results, regulators, utilities and trade press (power prices data).
- Grid factors: Ember and national data, in our grid emission factors. Certificates: the I-REC registry (Evident). Article 6: UNEP-CCC Article 6 pipeline.
- Access: WorldPop population, NASA Black Marble night lights, Google Open Buildings and our mapped lines (grid-edge atlas).
- Hydro: our grid atlases and Ember. Thermal sites: Global Energy Monitor (September 2026). Waste: FAOSTAT, Global Energy Monitor and OpenStreetMap. Second life: IRENA, compact targets and our second-life atlas.
Rows run in alphabetical order. These are side-by-side facts, not scores or rankings. A dash means we hold no data for that country. Pool totals count member countries only. Rebuilt every month with the country reports. Free to share under CC BY 4.0.