Country data

Southern African Power Pool

Botswana electricity grid and access

About 312,000 people in Botswana live where satellites see no electric light at night, and 85% of them live within 15 km of a power line. This page brings together what our open atlases show for Botswana: about 7,808 km of high-voltage lines, 1,012 MW of power plants and the projects still to come.

312kpeople live without night-time light, a proxy for no power
85%of them live within 15 km of a power line
7,808km of high-voltage lines, 66 kV and above
1,012MW of operating power plants, 10 MW and above
16power plants and transmission lines planned or under construction
The grid today

Lines, substations and demand

Botswana's mapped high-voltage network runs to about 7,808 km of lines at 66 kV and above, with 64 substations. The highest voltage on the map is 400 kV, and 45% of the line length runs at 220 kV or more. About 1,634 km come from older World Bank (2017) maps, used where OpenStreetMap has gaps. In August 2026, SAPP reported a peak demand of 698 MW against 475 MW available.

Mapped line length
Voltagekm
400 kV1,253
220 kV1,548
132 kV2,564
66 kV437
Voltage not recorded371
Gap-fill from older public maps1,634
Total7,808
Near the grid, not on it

Who lives near the grid but off it

About 312,000 people in Botswana, roughly 12% of the population, live where satellites see no electric light at night. Of them, 85% live within 15 km of a mapped or predicted power line: 101,000 within 2 km, 163,000 2 to 15 km away, and 48,000 farther out. The largest group lives 2 to 15 km out: close enough to plan for the grid, too far for a quick connection. That is where mini-grids built to join the grid later can do the most good. At its 2016-2023 pace, about 1.7 percentage points a year (World Bank), Botswana would reach the 100% access target in its Mission 300 compact around 2037, not 2030; the target needs about 3.4 points a year.

  • Within 2 km: 101,000 (32%)
  • 2 to 15 km: 163,000 (52%)
  • More than 15 km: 48,000 (15%)
See the numbers as a table
People without night-time light, by distance to a line
DistanceMillion peopleShare
Within 2 km of a line0.1032%
2 to 15 km0.1652%
More than 15 km0.0515%
Total0.31100%
How we count this

"Without night-time light" is a satellite proxy, not a measured access rate. Distances are straight lines to mapped or predicted lines. See the grid-edge atlas for the method.

Generation and pipeline

Power plants and projects

Five operating power plants of 10 MW and above add up to about 1,012 MW, 72% of it coal. The largest is Morupule B power station (600 MW, coal). Another 14 plants totaling about 5,285 MW are under construction or planned, 700 MW of them under construction. Most of the pipeline is solar. One early-stage project, Mega Solar Initiative solar farm (Botswana), accounts for 47% of that, so the total says more about ambition than about what will be built soon. The largest plant under construction is Mmamabula Energy Project (700 MW, coal).

Two transmission projects touching Botswana are in our register.

  • ZiZaBoNa interconnector (330 kV): feasibility done, expected 2030.
  • Botswana-Namibia interconnector: pre-feasibility, data collection.
Power plants of 10 MW and above
TypeOperating MWPipeline MW
Coal7321,315
Oil160
Solar1203,820
Wind150
Total1,0125,285
Topics

More about Botswana

Open any topic for the full text and tables.

Mission 300

What the energy compact commits to

Botswana's Mission 300 energy compact commits to raising electricity access from 77% to 100% by 2030.

Botswana's Mission 300 energy compact commits to raising electricity access from 77% to 100% by 2030. Each value is quoted, with its page, on our compacts page, where compacts sit side by side. Nothing is scored or ranked.

Mission 300 energy compact
CommitmentValue
Electricity access now77% (2025)
Access target100% by 2030
Clean cooking targetfrom 67% to 90% by 2030
Rules for mini-grids when the grid arrivesMentioned only
E-waste commitmentNo
Waste to Wealth

Second life for solar and batteries

Between 2026 and 2040, about 4,200 tonnes of solar equipment and stationary batteries are expected to retire in Botswana, most of it batteries.

Between 2026 and 2040, about 4,200 tonnes of solar equipment and stationary batteries are expected to retire in Botswana, most of it batteries. That is 1.0% of the total for the 18 countries in our second-life atlas. Up to 148 MWh of retired batteries could be tested and reused as storage, for example in solar home systems, shops and mini-grids (3.4% of the atlas total). Today the nearest recyclers for panels and lithium batteries are in Gauteng and Cape Town, so most of this waste would travel far and cross borders.

Solar and batteries retiring, 2026-2040 (tonnes)
StreamTonnesShare of country
Solar panels1,84544%
Off-grid solar kits and mini-grids501%
Batteries2,29055%
Total4,184100%
Botswana compared with the 18 countries in our second-life atlas, 2026-2040
BotswanaAtlas totalShare
Retiring solar and batteries (tonnes)4,184412,6681.0%
Reusable battery storage (MWh)1484,3223.4%
Retiring in 2030 (tonnes)52
Retiring in 2035 (tonnes)271
Retiring in 2040 (tonnes)1,027

From our second-life atlas, central case, by country. Electric vehicle batteries are modeled for the region as a whole, so they are not in these country figures.

Emissions

Grid emission factor

Each megawatt-hour generated in Botswana in 2024 came with about 0.97 tonnes of CO2.

Each megawatt-hour generated in Botswana in 2024 came with about 0.97 tonnes of CO2. Counting imported power, the factor for electricity used in the country is about 0.91 tCO2/MWh, with imports making up 27% of supply. For carbon projects such as solar mini-grids, the combined margin (the usual basis for crediting) is about 0.93 tCO2/MWh. Looking ahead, our scenarios from the plants in the pipeline put the average at 0.55 to 0.86 tCO2/MWh in 2030 and 0.61 to 0.88 in 2035, depending on how many plants arrive on time (see the scenarios). Data quality is rated low. See our grid emission factors for the method and all 38 countries.

Grid mix, 2024. 27% of the electricity used is imported.

Coal 98% Oil and diesel 1%

Air in the city

Satellite-based estimates put fine particulate matter (PM2.5) in Gaborone, the capital, at about 15 µg/m³ on average in 2023, about 3 times the WHO guideline of 5, about the same as 14 in 2013. The WHO database has no ground measurement for the city. Electric motorbikes and buses cut exhaust where people breathe it; see e-mobility for 71 cities.

Grid emission factor, 2024 (tCO2/MWh)
MeasuretCO2/MWh
Generated in country0.967
Electricity used, with imports0.905
Combined margin (for carbon projects)0.929
Tariffs and load shedding

What power costs here

Botswana Power Corporation (BPC)'s TOU 4 Domestic tariff, in force from 1 August 2026.

Botswana Power Corporation (BPC)'s TOU 4 Domestic tariff, in force from 1 August 2026. Our utilities, tariffs and load shedding page compares 39 African countries by customer class, with what each tariff includes and load shedding since 2015.

Tariff and load shedding
MeasureValue
Lifeline or first block (B1: up to 200 kWh)0.7507 BWP/kWh, about US$0.056
Household (B2: above 200 kWh)1.5637 BWP/kWh, about US$0.116
Load shedding nowLoad management program exists (10 A limit at peaks); active status not stated

Energy charge only, at the central bank rate on 30 October 2026. Check what is included (VAT, levies, fixed charges) on the research page.

Certificates and carbon credits

Renewable energy certificates

Botswana is approved to issue I-RECs, the international renewable energy certificate, but none have been issued yet.

Botswana is approved to issue I-RECs, the international renewable energy certificate, but none have been issued yet. On the voluntary carbon registries it has 4 carbon credit projects, 0 of them issuing, with about 0.0 million credits issued; 0 are renewable energy projects. Check it on the I-REC Standard site. See our certificates page to compare certificates with carbon credits across the region.

Certificates and carbon credits
MeasureValue
I-REC statusApproved, nothing issued yet
Registered plants-
I-RECs issued, all years-
Carbon credit projects4
Carbon credits issued-

I-RECs: Xpansiv I-REC Registry statistics, October 2026. Carbon projects: CarbonPlan OffsetsDB (Verra, Gold Standard and other voluntary registries), data to June 2026. Article 6: UNEP Copenhagen Climate Centre Article 6 Pipeline, November 2026.

Reference

Neighbors, sources and updates

Sources 8 sources
  • Grid lines: OpenStreetMap contributors (ODbL), with gap-fill from the World Bank Africa electricity grid (2017).
  • Power plants: Global Energy Monitor, Global Integrated Power Tracker (September 2026), with WRI and curated public project sources.
  • Supply and demand: SAPP monthly report (August 2026).
  • People without night-time light and distance to the grid: WorldPop 2020 and gridfinder (Arderne et al. 2020, CC BY 4.0), as screened in our grid-edge atlas.
  • Retiring solar and batteries: our second-life atlas model (central case, regular losses), from public project registers and IRENA lifetimes.
  • City air: Atmospheric Composition Analysis Group, Washington University in St. Louis (PM2.5 V6.GL.02.04); WHO Ambient Air Quality Database 2026.
  • Emission factors: our grid emission factors (Ember, 2024).
  • Compact commitments: the national Mission 300 energy compact, as quoted page by page on our compacts page.

The maps are free to view. The data behind this page is available on request: email [email protected]. Lines are indicative, not for engineering or investment decisions.

What changed

Our data is checked every month, and this page is rebuilt after each check.

  • 16 November 2026 - Latest update to the SAPP grid atlas, which this page is generated from.

Common questions about Botswana

Where can I find a map of Botswana's electricity grid?

The free SAPP grid atlas maps Botswana's high-voltage lines, substations, power plants of 10 MW and above and planned projects. Open it zoomed to Botswana.

How many people in Botswana live without electricity?

About 312,000 people live where satellites see no electric light at night, a proxy for living without power. Of them, 85% are within 15 km of a power line.

How long is Botswana's transmission network?

About 7,808 km of mapped lines at 66 kV and above, mostly from OpenStreetMap, with older public maps filling gaps.

How much power generation does Botswana have?

Operating plants of 10 MW and above add up to about 1,012 MW in our atlas, with about 5,285 MW more under construction or planned.

What is the grid emission factor for Botswana?

About 0.91 tCO2/MWh for electricity used in 2024, and 0.93 tCO2/MWh as a combined margin for carbon projects. See our grid emission factors for the method.

What is Botswana's Mission 300 energy compact target?

Botswana's Mission 300 energy compact commits to raising electricity access from 77% to 100% by 2030. See all compacts side by side on our compacts page.

Can I get the data for Botswana?