Country data

Southern African Power Pool

Angola electricity grid and access

About 16 million people in Angola live where satellites see no electric light at night, and 73% of them live within 15 km of a power line. This page brings together what our open atlases show for Angola: about 7,023 km of high-voltage lines, 6,329 MW of power plants and the projects still to come.

16 Mpeople live without night-time light, a proxy for no power
73%of them live within 15 km of a power line
7,023km of high-voltage lines, 66 kV and above
6,329MW of operating power plants, 10 MW and above
30power plants and transmission lines planned or under construction
The grid today

Lines, substations and demand

Angola's mapped high-voltage network runs to about 7,023 km of lines at 66 kV and above, with 56 substations. The highest voltage on the map is 400 kV, and 82% of the line length runs at 220 kV or more. About 1,264 km come from older World Bank (2017) maps, used where OpenStreetMap has gaps. Installed capacity was about 6,382 MW (Jul 2026), and peak demand about 2,186 MW (Oct 2022).

Mapped line length
Voltagekm
400 kV2,131
220 kV2,594
132 kV169
110 kV243
66 kV158
Voltage not recorded465
Gap-fill from older public maps1,264
Total7,023
Near the grid, not on it

Who lives near the grid but off it

About 16 million people in Angola, roughly 43% of the population, live where satellites see no electric light at night. Of them, 73% live within 15 km of a mapped or predicted power line: 4.2 million within 2 km, 7.7 million 2 to 15 km away, and 4.4 million farther out. The largest group lives 2 to 15 km out: close enough to plan for the grid, too far for a quick connection. That is where mini-grids built to join the grid later can do the most good.

  • Within 2 km: 4.2 million (26%)
  • 2 to 15 km: 7.7 million (47%)
  • More than 15 km: 4.4 million (27%)
See the numbers as a table
People without night-time light, by distance to a line
DistanceMillion peopleShare
Within 2 km of a line4.2226%
2 to 15 km7.7147%
More than 15 km4.4227%
Total16.36100%
How we count this

"Without night-time light" is a satellite proxy, not a measured access rate. Distances are straight lines to mapped or predicted lines. See the grid-edge atlas for the method.

Generation and pipeline

Power plants and projects

There are 46 operating power plants of 10 MW and above, adding up to about 6,329 MW, 64% of it hydro. The largest is Laúca hydroelectric plant (2,070 MW, hydro). Another 25 plants totaling about 7,512 MW are under construction or planned, 2,197 MW of them under construction. Most of the pipeline is hydro. Caculo Cabaça is 3 years behind its first promised date and now expected in 2027.

Five transmission projects touching Angola are in our register.

  • Angola-Namibia interconnector (ANNA) (400 kV): procurement, expected 2029.
  • Angola-DRC interconnector (private): contractor selected.
  • Baynes HPP transmission lines (400 kV): feasibility.
  • Inga-Soyo interconnector: pre-feasibility done.
  • Zambia-Angola interconnector: routing study.
Power plants of 10 MW and above
TypeOperating MWPipeline MW
Hydro4,0694,236
Gas7321,948
Oil650
Solar704810
Wind50518
Biomass100
Other24
Total6,3297,512
Topics

More about Angola

Open any topic for the full text and tables.

Waste to Wealth

Second life for solar and batteries

Between 2026 and 2040, about 7,300 tonnes of solar equipment and stationary batteries are expected to retire in Angola, most of it solar panels.

Between 2026 and 2040, about 7,300 tonnes of solar equipment and stationary batteries are expected to retire in Angola, most of it solar panels. That is 1.8% of the total for the 18 countries in our second-life atlas. Up to 35 MWh of retired batteries could be tested and reused as storage, for example in solar home systems, shops and mini-grids (0.8% of the atlas total). Today the nearest recyclers for panels and lithium batteries are in Gauteng and Cape Town, so most of this waste would travel far and cross borders.

Solar and batteries retiring, 2026-2040 (tonnes)
StreamTonnesShare of country
Solar panels6,56290%
Off-grid solar kits and mini-grids1602%
Batteries5457%
Total7,266100%
Angola compared with the 18 countries in our second-life atlas, 2026-2040
AngolaAtlas totalShare
Retiring solar and batteries (tonnes)7,266412,6681.8%
Reusable battery storage (MWh)354,3220.8%
Retiring in 2030 (tonnes)84
Retiring in 2035 (tonnes)286
Retiring in 2040 (tonnes)1,157

From our second-life atlas, central case, by country. Electric vehicle batteries are modeled for the region as a whole, so they are not in these country figures.

Emissions

Grid emission factor

Each megawatt-hour generated in Angola in 2024 came with about 0.18 tonnes of CO2.

Each megawatt-hour generated in Angola in 2024 came with about 0.18 tonnes of CO2. For carbon projects such as solar mini-grids, the combined margin (the usual basis for crediting) is about 0.09 tCO2/MWh. Looking ahead, our scenarios from the plants in the pipeline put the average at 0.00 tCO2/MWh in 2030 and 0.06 to 0.14 in 2035, depending on how many plants arrive on time (see the scenarios). Data quality is rated low. See our grid emission factors for the method and all 38 countries.

Grid mix, 2024.

Gas 9% Oil and diesel 17% Hydro 71% Solar 3%

Air in the city

Satellite-based estimates put fine particulate matter (PM2.5) in Luanda, the capital, at about 22 µg/m³ on average in 2023, about 4 times the WHO guideline of 5, down from 24 in 2013. The WHO database has no ground measurement for the city. Electric motorbikes and buses cut exhaust where people breathe it; see e-mobility for 71 cities.

Grid emission factor, 2024 (tCO2/MWh)
MeasuretCO2/MWh
Generated in country0.177
Electricity used, with imports0.177
Combined margin (for carbon projects)0.091
Tariffs and load shedding

What power costs here

ENDE's Domestica Monofasica tariff.

ENDE's Domestica Monofasica tariff. Our utilities, tariffs and load shedding page compares 39 African countries by customer class, with what each tariff includes and load shedding since 2015.

Tariff and load shedding
MeasureValue
Lifeline or first block (single rate)3.20 AOA/kWh, about US$0.004
Household (single rate)14.16 AOA/kWh, about US$0.015
Load shedding nowNothing found

Energy charge only, at the central bank rate on 30 October 2026. Check what is included (VAT, levies, fixed charges) on the research page.

Certificates and carbon credits

Renewable energy certificates

Angola cannot issue I-RECs, the international renewable energy certificate, yet.

Angola cannot issue I-RECs, the international renewable energy certificate, yet. On the voluntary carbon registries it has 6 carbon credit projects, 3 of them issuing, with about 0.2 million credits issued; 1 are renewable energy projects. See our certificates page to compare certificates with carbon credits across the region.

Certificates and carbon credits
MeasureValue
I-REC statusNot approved
Registered plants-
I-RECs issued, all years-
Carbon credit projects6
Carbon credits issued0.2 million

I-RECs: Xpansiv I-REC Registry statistics, October 2026. Carbon projects: CarbonPlan OffsetsDB (Verra, Gold Standard and other voluntary registries), data to June 2026. Article 6: UNEP Copenhagen Climate Centre Article 6 Pipeline, November 2026.

Reference

Neighbors, sources and updates

Sources 7 sources
  • Grid lines: OpenStreetMap contributors (ODbL), with gap-fill from the World Bank Africa electricity grid (2017).
  • Power plants: Global Energy Monitor, Global Integrated Power Tracker (September 2026), with WRI and curated public project sources.
  • Capacity and peak demand: national utilities and regulators.
  • People without night-time light and distance to the grid: WorldPop 2020 and gridfinder (Arderne et al. 2020, CC BY 4.0), as screened in our grid-edge atlas.
  • Retiring solar and batteries: our second-life atlas model (central case, regular losses), from public project registers and IRENA lifetimes.
  • City air: Atmospheric Composition Analysis Group, Washington University in St. Louis (PM2.5 V6.GL.02.04); WHO Ambient Air Quality Database 2026.
  • Emission factors: our grid emission factors (Ember, 2024).

The maps are free to view. The data behind this page is available on request: email [email protected]. Lines are indicative, not for engineering or investment decisions.

What changed 2 updates

Our data is checked every month, and this page is rebuilt after each check.

  • 16 November 2026 - Latest update to the SAPP grid atlas, which this page is generated from.
  • 16 November 2026 - Monthly check. The Mozambique-Malawi interconnector was energized on 8 August 2026; it stays in commissioning until a tariff deal lets commercial trading start. Source. The Tanzania section of the Tanzania-Zambia interconnector is 92% complete and now due in December 2026, seven months after its May 2026 target. Source. Angola-Namibia (ANNA): implementation agreement signed in April 2026 added to the project history.

Common questions about Angola

Where can I find a map of Angola's electricity grid?

The free SAPP grid atlas maps Angola's high-voltage lines, substations, power plants of 10 MW and above and planned projects. Open it zoomed to Angola.

How many people in Angola live without electricity?

About 16 million people live where satellites see no electric light at night, a proxy for living without power. Of them, 73% are within 15 km of a power line.

How long is Angola's transmission network?

About 7,023 km of mapped lines at 66 kV and above, mostly from OpenStreetMap, with older public maps filling gaps.

How much power generation does Angola have?

Operating plants of 10 MW and above add up to about 6,329 MW in our atlas, with about 7,512 MW more under construction or planned.

What is the grid emission factor for Angola?

About 0.18 tCO2/MWh for electricity used in 2024, and 0.09 tCO2/MWh as a combined margin for carbon projects. See our grid emission factors for the method.