Eswatini electricity grid and access
About 342,000 people in Eswatini live where satellites see no electric light at night, and 100% of them live within 15 km of a power line. This page brings together what our open atlases show for Eswatini: about 1,113 km of high-voltage lines, 202 MW of power plants and the projects still to come.

Open the live atlas for Eswatini Download the two-page brief (PDF) Distribution network map
Free A2 posters of Eswatini’s grid: today and 2035 and beyond (PDF). All posters
Lines, substations and demand
Eswatini's mapped high-voltage network runs to about 1,113 km of lines at 66 kV and above, with 18 substations. The highest voltage on the map is 400 kV, and 19% of the line length runs at 220 kV or more. About 365 km come from older World Bank (2017) maps, used where OpenStreetMap has gaps. In August 2026, SAPP reported a peak demand of 229 MW against 60 MW available.
| Voltage | km |
|---|---|
| 400 kV | 144 |
| 132 kV | 426 |
| 66 kV | 170 |
| Voltage not recorded | 8 |
| Gap-fill from older public maps | 365 |
| Total | 1,113 |
Who lives near the grid but off it
About 342,000 people in Eswatini, roughly 27% of the population, live where satellites see no electric light at night. Of them, 100% live within 15 km of a mapped or predicted power line: 247,000 within 2 km, 95,000 2 to 15 km away, and 0 farther out. The largest group lives within 2 km of a line, so the main gap is last-mile connections and affordability, more than new lines.
- Within 2 km: 247,000 (72%)
- 2 to 15 km: 95,000 (28%)
- More than 15 km: 0 (0%)
See the numbers as a table
| Distance | Million people | Share |
|---|---|---|
| Within 2 km of a line | 0.25 | 72% |
| 2 to 15 km | 0.10 | 28% |
| More than 15 km | 0.00 | 0% |
| Total | 0.34 | 100% |
How we count this
"Without night-time light" is a satellite proxy, not a measured access rate. Distances are straight lines to mapped or predicted lines. See the grid-edge atlas for the method.
Power plants and projects
Ten operating power plants of 10 MW and above add up to about 202 MW, 47% of it biomass. The largest is Ubombo Sugar Mill power station (40 MW, biomass). Another 9 plants totaling about 574 MW are under construction or planned. Most of the pipeline is coal. One early-stage project, Lubhuku power station, accounts for 52% of that, so the total says more about ambition than about what will be built soon.
| Type | Operating MW | Pipeline MW |
|---|---|---|
| Hydro | 80 | 120 |
| Coal | 300 | |
| Solar | 10 | 95 |
| Biomass | 95 | 58 |
| Other | 17 | |
| Total | 202 | 574 |
More about Eswatini
Open any topic for the full text and tables.
Waste to WealthSecond life for solar and batteries
Between 2026 and 2040, about 318 tonnes of solar equipment and stationary batteries are expected to retire in Eswatini, most of it solar panels. That is 0.1% of the total for the 18 countries in our second-life atlas. Today the nearest recyclers for panels and lithium batteries are in Gauteng and Cape Town, so most of this waste would travel far and cross borders.
| Stream | Tonnes | Share of country |
|---|---|---|
| Solar panels | 316 | 99% |
| Off-grid solar kits and mini-grids | 2 | 1% |
| Total | 318 | 100% |
| Eswatini | Atlas total | Share | |
|---|---|---|---|
| Retiring solar and batteries (tonnes) | 318 | 412,668 | 0.1% |
| Reusable battery storage (MWh) | 0 | 4,322 | 0.0% |
| Retiring in 2030 (tonnes) | 6 | ||
| Retiring in 2035 (tonnes) | 14 | ||
| Retiring in 2040 (tonnes) | 41 |
From our second-life atlas, central case, by country. Electric vehicle batteries are modeled for the region as a whole, so they are not in these country figures.
EmissionsGrid emission factor
Each megawatt-hour generated in Eswatini in 2024 came with about 0.03 tonnes of CO2. Counting imported power, the factor for electricity used in the country is about 0.47 tCO2/MWh, with imports making up 63% of supply. For carbon projects such as solar mini-grids, the combined margin (the usual basis for crediting) is about 0.02 tCO2/MWh. Looking ahead, our scenarios from the plants in the pipeline put the average at 0.00 to 0.13 tCO2/MWh in 2030 and 0.09 to 0.19 in 2035, depending on how many plants arrive on time (see the scenarios). Data quality is rated low. See our grid emission factors for the method and all 38 countries.
Grid mix, 2024. 63% of the electricity used is imported.
Coal 3% Hydro 57% Solar 5% Bioenergy 34%
Air in the city
Satellite-based estimates put fine particulate matter (PM2.5) in Mbabane, the capital, at about 20 µg/m³ on average in 2023, about 4 times the WHO guideline of 5, up from 16 in 2013. In Manzini, the largest city, it was about 18. The WHO database has no ground measurement for the city. Electric motorbikes and buses cut exhaust where people breathe it; see e-mobility for 71 cities.
| Measure | tCO2/MWh |
|---|---|
| Generated in country | 0.032 |
| Electricity used, with imports | 0.473 |
| Combined margin (for carbon projects) | 0.016 |
Tariffs and load sheddingWhat power costs here
Eswatini Electricity Company (EEC)'s S1 Domestic tariff. Our utilities, tariffs and load shedding page compares 39 African countries by customer class, with what each tariff includes and load shedding since 2015.
| Measure | Value |
|---|---|
| Lifeline or first block (0-75 kWh/month) | 1.5685 SZL/kWh, about US$0.094 |
| Household (single rate) | 2.8624 SZL/kWh, about US$0.172 |
| Load shedding now | Winter load management Jun-Aug (peaks 06:00-08:00, 17:00-20:00); none announced now |
Energy charge only, at the central bank rate on 30 October 2026. Check what is included (VAT, levies, fixed charges) on the research page.
Certificates and carbon creditsRenewable energy certificates
Eswatini cannot issue I-RECs, the international renewable energy certificate, yet. No carbon credit projects are listed for it on the voluntary registries. See our certificates page to compare certificates with carbon credits across the region.
| Measure | Value |
|---|---|
| I-REC status | Not approved |
| Registered plants | - |
| I-RECs issued, all years | - |
| Carbon credit projects | 0 |
| Carbon credits issued | - |
I-RECs: Xpansiv I-REC Registry statistics, October 2026. Carbon projects: CarbonPlan OffsetsDB (Verra, Gold Standard and other voluntary registries), data to June 2026. Article 6: UNEP Copenhagen Climate Centre Article 6 Pipeline, November 2026.
Neighbors, sources and updates
Neighboring countries
More in the SAPP grid atlas, grid-edge atlas, second-life atlas and grid emission factors, or see all countries.
Sources 7 sources
- Grid lines: OpenStreetMap contributors (ODbL), with gap-fill from the World Bank Africa electricity grid (2017).
- Power plants: Global Energy Monitor, Global Integrated Power Tracker (September 2026), with WRI and curated public project sources.
- Supply and demand: SAPP monthly report (August 2026).
- People without night-time light and distance to the grid: WorldPop 2020 and gridfinder (Arderne et al. 2020, CC BY 4.0), as screened in our grid-edge atlas.
- Retiring solar and batteries: our second-life atlas model (central case, regular losses), from public project registers and IRENA lifetimes.
- City air: Atmospheric Composition Analysis Group, Washington University in St. Louis (PM2.5 V6.GL.02.04); WHO Ambient Air Quality Database 2026.
- Emission factors: our grid emission factors (Ember, 2024).
The maps are free to view. The data behind this page is available on request: email [email protected]. Lines are indicative, not for engineering or investment decisions.
What changed
Our data is checked every month, and this page is rebuilt after each check.
- 16 November 2026 - Latest update to the SAPP grid atlas, which this page is generated from.
Common questions about Eswatini
Where can I find a map of Eswatini's electricity grid?
The free SAPP grid atlas maps Eswatini's high-voltage lines, substations, power plants of 10 MW and above and planned projects. Open it zoomed to Eswatini.
How many people in Eswatini live without electricity?
About 342,000 people live where satellites see no electric light at night, a proxy for living without power. Of them, 100% are within 15 km of a power line.
How long is Eswatini's transmission network?
About 1,113 km of mapped lines at 66 kV and above, mostly from OpenStreetMap, with older public maps filling gaps.
How much power generation does Eswatini have?
Operating plants of 10 MW and above add up to about 202 MW in our atlas, with about 574 MW more under construction or planned.
What is the grid emission factor for Eswatini?
About 0.47 tCO2/MWh for electricity used in 2024, and 0.02 tCO2/MWh as a combined margin for carbon projects. See our grid emission factors for the method.
Can I get the data for Eswatini?
Yes, on request. The maps are free to view; email [email protected] and tell us what you need it for.