Southern African Power Pool and Eastern Africa Power Pool
DR Congo electricity grid and access
DR Congo has one of the largest populations without power in Africa: about 83 million people live where satellites see no electric light at night. Its grid is not one network but several: one in the west fed by the Inga dams, one in the south and smaller systems in the east fed from Ruzizi. Only 60% of people without light live within 15 km of a line, less than in most of its eastern and southern neighbors, so mini-grids and standalone solar will carry much of the load for years.

Open the live atlas for DR Congo Download the two-page brief (PDF) Fiche en français (PDF) Distribution network map
Free A2 posters of DR Congo’s grid: today and 2035 and beyond (PDF). All posters
Lines, substations and demand
DR Congo's mapped high-voltage network runs to about 9,846 km of lines at 66 kV and above, with 142 substations. The highest voltage on the map is 500 kV, and 68% of the line length runs at 220 kV or more. About 1,912 km come from older World Bank (2017) maps, used where OpenStreetMap has gaps. In August 2026, SAPP reported a peak demand of 2,379 MW against 1,650 MW available, with 100 MW of load shed. The latest international tracking report puts access to electricity at 22% of people.
| Voltage | km |
|---|---|
| 500 kV | 3,403 |
| 400 kV | 3 |
| 220 kV | 1,981 |
| 132 kV | 1,836 |
| 110 kV | 66 |
| 66 kV | 299 |
| Voltage not recorded | 345 |
| Gap-fill from older public maps | 1,912 |
| Total | 9,846 |
Who lives near the grid but off it
About 83 million people in DR Congo, roughly 76% of the population, live where satellites see no electric light at night. Of them, 60% live within 15 km of a mapped or predicted power line: 25 million within 2 km, 24 million 2 to 15 km away, and 33 million farther out. The largest group lives more than 15 km from any line, where standalone solar and mini-grids are the realistic first step for years to come. At its 2016-2023 pace, about 0.7 percentage points a year (World Bank), DR Congo would reach the 62% access target in its Mission 300 compact after 2050, not 2030; the target needs about 5.7 points a year.
- Within 2 km: 25 million (30%)
- 2 to 15 km: 24 million (30%)
- More than 15 km: 33 million (40%)
See the numbers as a table
| Distance | Million people | Share |
|---|---|---|
| Within 2 km of a line | 25.16 | 30% |
| 2 to 15 km | 24.42 | 30% |
| More than 15 km | 33.20 | 40% |
| Total | 82.78 | 100% |
How we count this
"Without night-time light" is a satellite proxy, not a measured access rate. Distances are straight lines to mapped or predicted lines. See the grid-edge atlas for the method.
Power plants and projects
There are 47 operating power plants of 10 MW and above, adding up to about 3,884 MW, 84% of it hydro. The largest is Inga II hydroelectric plant (1,424 MW, hydro). Another 22 plants totaling about 3,999 MW are under construction or planned, 398 MW of them under construction. Most of the pipeline is solar. The largest plant under construction is Fipango solar farm (200 MW, solar).
Seven transmission projects touching DR Congo are in our register.
- Rwanda-DR Congo 220 kV (Goma-Gisenyi, Goma-Bukavu) (220 kV): under construction, expected 2027.
- Burundi-DR Congo 220 kV (Kamanyola-Bujumbura) (220 kV): under construction, expected 2028.
- Ruzizi III 220 kV evacuation (220 kV): financed, expected 2030.
- Uganda-DR Congo 220 kV (Nkenda-Beni-Bunia) (220 kV): feasibility, expected 2030.
- Angola-DRC interconnector (private): contractor selected.
- Inga-Soyo interconnector: pre-feasibility done.
One more project is in the atlas.
| Type | Operating MW | Pipeline MW |
|---|---|---|
| Hydro | 3,260 | 1,472 |
| Gas | 25 | 240 |
| Oil | 155 | |
| Solar | 344 | 2,227 |
| Biomass | 60 | |
| Storage | 85 | |
| Other | 15 | |
| Total | 3,884 | 3,999 |
More about DR Congo
Open any topic for the full text and tables.
Mission 300What the energy compact commits to
DR Congo's Mission 300 energy compact commits to raising electricity access from 22% to 62% by 2030. New access is planned as 44% grid, 56% mini-grids and 0% standalone solar. Each value is quoted, with its page, on our compacts page, where compacts sit side by side. Nothing is scored or ranked.
| Commitment | Value |
|---|---|
| Electricity access now | 22% (2024) |
| Access target | 62% by 2030 |
| Planned split of new access | grid 44%, mini-grids 56%, standalone solar 0% |
| Clean cooking target | from 1% to 30% by 2030 |
| Private investment sought | US$20 billion |
| Rules for mini-grids when the grid arrives | Yes |
| E-waste commitment | No |
Waste to WealthSecond life for solar and batteries
Between 2026 and 2040, about 10,400 tonnes of solar equipment and stationary batteries are expected to retire in DR Congo, most of it off-grid solar kits and mini-grids. That is 2.5% of the total for the 18 countries in our second-life atlas. Up to 229 MWh of retired batteries could be tested and reused as storage, for example in solar home systems, shops and mini-grids (5.3% of the atlas total). Today the nearest recyclers for panels and lithium batteries are in Gauteng and Cape Town, so most of this waste would travel far and cross borders.
| Stream | Tonnes | Share of country |
|---|---|---|
| Solar panels | 1,369 | 13% |
| Off-grid solar kits and mini-grids | 5,555 | 53% |
| Batteries | 3,515 | 34% |
| Total | 10,439 | 100% |
| DR Congo | Atlas total | Share | |
|---|---|---|---|
| Retiring solar and batteries (tonnes) | 10,439 | 412,668 | 2.5% |
| Reusable battery storage (MWh) | 229 | 4,322 | 5.3% |
| Retiring in 2030 (tonnes) | 446 | ||
| Retiring in 2035 (tonnes) | 815 | ||
| Retiring in 2040 (tonnes) | 1,066 |
From our second-life atlas, central case, by country. Electric vehicle batteries are modeled for the region as a whole, so they are not in these country figures.
EmissionsGrid emission factor
Each megawatt-hour generated in DR Congo in 2024 came with close to zero tonnes of CO2. Counting imported power, the factor for electricity used in the country is about 0.06 tCO2/MWh, with imports making up 8% of supply. For carbon projects such as solar mini-grids, the combined margin (the usual basis for crediting) is close to zero tCO2/MWh. Looking ahead, our scenarios from the plants in the pipeline put the average at 0.08 to 0.09 tCO2/MWh in 2030 and 0.08 to 0.09 in 2035, depending on how many plants arrive on time (see the scenarios). Data quality is rated low. See our grid emission factors for the method and all 38 countries.
Grid mix, 2024. 8% of the electricity used is imported.
Hydro 84% Solar 16%
Air in the city
Satellite-based estimates put fine particulate matter (PM2.5) in Kinshasa, the capital, at about 37 µg/m³ on average in 2023, about 7 times the WHO guideline of 5, down from 41 in 2013. On OpenAQ, 3 low-cost sensors in and around the city averaged about 66 over the 12 months to October 2026. Electric motorbikes and buses cut exhaust where people breathe it; see e-mobility for 71 cities.
| Measure | tCO2/MWh |
|---|---|
| Generated in country | 0.000 |
| Electricity used, with imports | 0.061 |
| Combined margin (for carbon projects) | 0.004 |
Tariffs and load sheddingWhat power costs here
SNEL's Residentiel 2 tariff. Our utilities, tariffs and load shedding page compares 39 African countries by customer class, with what each tariff includes and load shedding since 2015.
| Measure | Value |
|---|---|
| Lifeline or first block (1-100 kWh/month) | 0.0388 USD/kWh, about US$0.039 |
| Household (1-600 kWh/month) | 0.0888 USD/kWh, about US$0.089 |
| Load shedding now | Unscheduled cuts (delestage) in Kinshasa and other cities |
Energy charge only, at the central bank rate on 30 October 2026. Check what is included (VAT, levies, fixed charges) on the research page.
Certificates and carbon creditsRenewable energy certificates
DR Congo can issue I-RECs, the international renewable energy certificate. 4 plants are registered (3 MW) and 11 GWh of certificates have been issued. On the voluntary carbon registries it has 60 carbon credit projects, 12 of them issuing, with about 46.9 million credits issued; 5 are renewable energy projects. Check it on the I-REC Standard site. See our certificates page to compare certificates with carbon credits across the region.
| Measure | Value |
|---|---|
| I-REC status | Issuing |
| Registered plants | 4 (3 MW) |
| I-RECs issued, all years | 11 GWh |
| Carbon credit projects | 60 |
| Carbon credits issued | 46.9 million |
I-RECs: Xpansiv I-REC Registry statistics, October 2026. Carbon projects: CarbonPlan OffsetsDB (Verra, Gold Standard and other voluntary registries), data to June 2026. Article 6: UNEP Copenhagen Climate Centre Article 6 Pipeline, November 2026.
Neighbors, sources and updates
Neighboring countries
Angola Zambia Tanzania Uganda Rwanda Burundi Republic of the Congo Central African Republic
More in the SAPP grid atlas, EAPP grid atlas, grid-edge atlas, second-life atlas, grid emission factors and Mission 300 compacts, or see all countries.
Sources 9 sources
- Grid lines: OpenStreetMap contributors (ODbL), with gap-fill from the World Bank Africa electricity grid (2017).
- Power plants: Global Energy Monitor, Global Integrated Power Tracker (September 2026), with WRI and curated public project sources.
- Supply and demand: SAPP monthly report (August 2026).
- Capacity and access: national regulators and utilities, and the Tracking SDG7 Energy Progress Report 2026.
- People without night-time light and distance to the grid: WorldPop 2020 and gridfinder (Arderne et al. 2020, CC BY 4.0), as screened in our grid-edge atlas.
- Retiring solar and batteries: our second-life atlas model (central case, regular losses), from public project registers and IRENA lifetimes.
- City air: Atmospheric Composition Analysis Group, Washington University in St. Louis (PM2.5 V6.GL.02.04); WHO Ambient Air Quality Database 2026; OpenAQ (sensor data, November 2025 to October 2026).
- Emission factors: our grid emission factors (Ember, 2024).
- Compact commitments: the national Mission 300 energy compact, as quoted page by page on our compacts page.
The maps are free to view. The data behind this page is available on request: email [email protected]. Lines are indicative, not for engineering or investment decisions.
What changed 3 updates
Our data is checked every month, and this page is rebuilt after each check.
- 16 November 2026 - Latest update to the SAPP grid atlas, which this page is generated from.
- 13 November 2026 - Latest update to the EAPP grid atlas, which this page is generated from.
- Jun 2026 - Ruzizi III 220 kV evacuation: KT Press, now expected 2030.
Common questions about DR Congo
Where can I find a map of DR Congo's electricity grid?
The free SAPP grid atlas maps DR Congo's high-voltage lines, substations, power plants of 10 MW and above and planned projects. Open it zoomed to DR Congo.
How many people in DR Congo live without electricity?
About 83 million people live where satellites see no electric light at night, a proxy for living without power. Of them, 60% are within 15 km of a power line.
How long is DR Congo's transmission network?
About 9,846 km of mapped lines at 66 kV and above, mostly from OpenStreetMap, with older public maps filling gaps.
How much power generation does DR Congo have?
Operating plants of 10 MW and above add up to about 3,884 MW in our atlas, with about 3,999 MW more under construction or planned.
What is the grid emission factor for DR Congo?
About 0.06 tCO2/MWh for electricity used in 2024, and 0.00 tCO2/MWh as a combined margin for carbon projects. See our grid emission factors for the method.
What is DR Congo's Mission 300 energy compact target?
DR Congo's Mission 300 energy compact commits to raising electricity access from 22% to 62% by 2030. New access is planned as 44% grid, 56% mini-grids and 0% standalone solar. See all compacts side by side on our compacts page.
Can I get the data for DR Congo?
Yes, on request. The maps are free to view; email [email protected] and tell us what you need it for.