Eastern Africa Power Pool
Uganda electricity grid and access
About 34 million people in Uganda live where satellites see no electric light at night, and 94% of them live within 15 km of a power line. This page brings together what our open atlases show for Uganda: about 3,401 km of high-voltage lines, 1,980 MW of power plants and the projects still to come.

Open the live atlas for Uganda Download the two-page brief (PDF) Distribution network map
Free A2 posters of Uganda’s grid: today and 2035 and beyond (PDF). All posters
Lines, substations and demand
Uganda's mapped high-voltage network runs to about 3,401 km of lines at 66 kV and above, with 22 substations. The highest voltage on the map is 400 kV, and 28% of the line length runs at 220 kV or more. About 98 km come from older World Bank (2017) maps, used where OpenStreetMap has gaps. Installed capacity was about 2,048 MW (2024), and peak demand about 1,351 MW (2025). The latest international tracking report puts access to electricity at 55% of people.
| Voltage | km |
|---|---|
| 400 kV | 304 |
| 220 kV | 619 |
| 132 kV | 1,636 |
| 66 kV | 30 |
| Voltage not recorded | 714 |
| Gap-fill from older public maps | 98 |
| Total | 3,401 |
Who lives near the grid but off it
About 34 million people in Uganda, roughly 68% of the population, live where satellites see no electric light at night. Of them, 94% live within 15 km of a mapped or predicted power line: 12 million within 2 km, 20 million 2 to 15 km away, and 1.9 million farther out. The largest group lives 2 to 15 km out: close enough to plan for the grid, too far for a quick connection. That is where mini-grids built to join the grid later can do the most good. At its 2016-2023 pace, about 3.1 percentage points a year (World Bank), Uganda would reach the 85% access target in its Mission 300 compact around 2034, not 2030; the target needs about 4.8 points a year.
- Within 2 km: 12 million (34%)
- 2 to 15 km: 20 million (60%)
- More than 15 km: 1.9 million (6%)
See the numbers as a table
| Distance | Million people | Share |
|---|---|---|
| Within 2 km of a line | 11.69 | 34% |
| 2 to 15 km | 20.35 | 60% |
| More than 15 km | 1.90 | 6% |
| Total | 33.94 | 100% |
How we count this
"Without night-time light" is a satellite proxy, not a measured access rate. Distances are straight lines to mapped or predicted lines. See the grid-edge atlas for the method.
Power plants and projects
There are 27 operating power plants of 10 MW and above, adding up to about 1,980 MW, 80% of it hydro. The largest is Karuma (600 MW, hydro). Another 27 plants totaling about 20,617 MW are under construction or planned, 24 MW of them under construction. Most of the pipeline is nuclear.
Six transmission projects touching Uganda are in our register. The most delayed is Uganda-South Sudan 400 kV (Olwiyo-Nimule-Juba): 8 years later than first promised, now expected in 2028.
- Uganda Karuma-Kawanda 400 kV (Karuma evacuation) (400 kV): commissioning, expected 2024, 6 years behind the first date.
- Kenya-Uganda Lessos-Tororo 400 kV (Kenyan section) (400 kV): under construction, expected 2027.
- Uganda Bujagali-Tororo 220 kV (Ugandan section) (220 kV): under construction, expected 2027.
- Uganda-South Sudan 400 kV (Olwiyo-Nimule-Juba) (400 kV): financed, expected 2028, 8 years behind the first date.
- Uganda-Tanzania 400 kV interconnector (400 kV): procurement, expected 2029.
- Uganda-DR Congo 220 kV (Nkenda-Beni-Bunia) (220 kV): feasibility, expected 2030.
| Type | Operating MW | Pipeline MW |
|---|---|---|
| Hydro | 1,592 | 1,728 |
| Oil | 189 | |
| Solar | 107 | 684 |
| Wind | 130 | |
| Nuclear | 18,000 | |
| Biomass | 92 | 75 |
| Total | 1,980 | 20,617 |
More about Uganda
Open any topic for the full text and tables.
Mission 300What the energy compact commits to
Uganda's Mission 300 energy compact commits to raising electricity access from 60% to 85% by 2030. Each value is quoted, with its page, on our compacts page, where compacts sit side by side. Nothing is scored or ranked.
| Commitment | Value |
|---|---|
| Electricity access now | 60% (2025) |
| Access target | 85% by 2030 |
| Clean cooking target | from 25% to 50% by 2030 |
| Private investment sought | US$9.44 billion |
| Rules for mini-grids when the grid arrives | Yes |
| E-waste commitment | No |
Waste to WealthSecond life for solar and batteries
Between 2026 and 2040, about 7,500 tonnes of solar equipment and stationary batteries are expected to retire in Uganda, most of it off-grid solar kits and mini-grids. That is 1.8% of the total for the 18 countries in our second-life atlas. Up to 11 MWh of retired batteries could be tested and reused as storage, for example in solar home systems, shops and mini-grids (0.2% of the atlas total). Eastern Africa and Madagascar have e-waste collection and dismantling, in Kenya and Rwanda, but no recycler for panels or lithium batteries yet, so this waste would have to travel to South Africa, mostly by sea to Durban.
| Stream | Tonnes | Share of country |
|---|---|---|
| Solar panels | 2,407 | 32% |
| Off-grid solar kits and mini-grids | 4,911 | 66% |
| Batteries | 156 | 2% |
| Total | 7,474 | 100% |
| Uganda | Atlas total | Share | |
|---|---|---|---|
| Retiring solar and batteries (tonnes) | 7,474 | 412,668 | 1.8% |
| Reusable battery storage (MWh) | 11 | 4,322 | 0.2% |
| Retiring in 2030 (tonnes) | 359 | ||
| Retiring in 2035 (tonnes) | 569 | ||
| Retiring in 2040 (tonnes) | 658 |
From our second-life atlas, central case, by country. Electric vehicle batteries are modeled for the region as a whole, so they are not in these country figures.
EmissionsGrid emission factor
Each megawatt-hour generated in Uganda in 2024 came with about 0.02 tonnes of CO2. For carbon projects such as solar mini-grids, the combined margin (the usual basis for crediting) is about 0.01 tCO2/MWh. Looking ahead, our scenarios from the plants in the pipeline put the average at 0.06 tCO2/MWh in 2030 and 0.00 to 0.07 in 2035, depending on how many plants arrive on time (see the scenarios). We have not yet rated the quality of its data. See our grid emission factors for the method and all 38 countries.
Grid mix, 2024.
Oil and diesel 3% Hydro 86% Solar 3% Bioenergy 8%
Air in the city
Satellite-based estimates put fine particulate matter (PM2.5) in Kampala, the capital, at about 29 µg/m³ on average in 2023, about 6 times the WHO guideline of 5, down from 38 in 2013. The WHO database has a ground measurement of 60 µg/m³ for 2019. On OpenAQ, 10 low-cost sensors in and around the city averaged about 40 over the 12 months to October 2026. Electric motorbikes and buses cut exhaust where people breathe it; see e-mobility for 71 cities.
| Measure | tCO2/MWh |
|---|---|
| Generated in country | 0.022 |
| Electricity used, with imports | 0.022 |
| Combined margin (for carbon projects) | 0.011 |
Tariffs and load sheddingWhat power costs here
UEDCL's Domestic tariff. Our utilities, tariffs and load shedding page compares 39 African countries by customer class, with what each tariff includes and load shedding since 2015.
| Measure | Value |
|---|---|
| Lifeline or first block (first 15 kWh/month) | 250 UGX/kWh, about US$0.058 |
| Household (16-80 kWh/month) | 779.4 UGX/kWh, about US$0.179 |
| Load shedding now | No scheduled load shedding found; frequent unplanned outages reported |
Energy charge only, at the central bank rate on 30 October 2026. Check what is included (VAT, levies, fixed charges) on the research page.
Certificates and carbon creditsRenewable energy certificates
Uganda can issue I-RECs, the international renewable energy certificate. 41 plants are registered (80 MW) and 747 GWh of certificates have been issued. On the voluntary carbon registries it has 296 carbon credit projects, 175 of them issuing, with about 34.8 million credits issued; 14 are renewable energy projects. Under the Paris Agreement it has 15 activities approved for the UN's new crediting mechanism. Check it on the I-REC Standard site. See our certificates page to compare certificates with carbon credits across the region.
| Measure | Value |
|---|---|
| I-REC status | Issuing |
| Registered plants | 41 (80 MW) |
| I-RECs issued, all years | 747 GWh |
| Carbon credit projects | 296 |
| Carbon credits issued | 34.8 million |
I-RECs: Xpansiv I-REC Registry statistics, October 2026. Carbon projects: CarbonPlan OffsetsDB (Verra, Gold Standard and other voluntary registries), data to June 2026. Article 6: UNEP Copenhagen Climate Centre Article 6 Pipeline, November 2026.
Neighbors, sources and updates
Neighboring countries
Kenya Tanzania Rwanda DR Congo
More in the EAPP grid atlas, grid-edge atlas, second-life atlas, grid emission factors and Mission 300 compacts, or see all countries.
Sources 8 sources
- Grid lines: OpenStreetMap contributors (ODbL), with gap-fill from the World Bank Africa electricity grid (2017).
- Power plants: Global Energy Monitor, Global Integrated Power Tracker (September 2026), with WRI and curated public project sources.
- Capacity and access: national regulators and utilities, and the Tracking SDG7 Energy Progress Report 2026.
- People without night-time light and distance to the grid: WorldPop 2020 and gridfinder (Arderne et al. 2020, CC BY 4.0), as screened in our grid-edge atlas.
- Retiring solar and batteries: our second-life atlas model (central case, regular losses), from public project registers and IRENA lifetimes.
- City air: Atmospheric Composition Analysis Group, Washington University in St. Louis (PM2.5 V6.GL.02.04); WHO Ambient Air Quality Database 2026; OpenAQ (sensor data, November 2025 to October 2026).
- Emission factors: our grid emission factors (Ember, 2024).
- Compact commitments: the national Mission 300 energy compact, as quoted page by page on our compacts page.
The maps are free to view. The data behind this page is available on request: email [email protected]. Lines are indicative, not for engineering or investment decisions.
What changed 2 updates
Our data is checked every month, and this page is rebuilt after each check.
- 13 November 2026 - Latest update to the EAPP grid atlas, which this page is generated from.
- Jun 2026 - Uganda-Tanzania 400 kV interconnector: World Bank, now expected US$250m approved; trade targets to 2031.
Common questions about Uganda
Where can I find a map of Uganda's electricity grid?
The free EAPP grid atlas maps Uganda's high-voltage lines, substations, power plants of 10 MW and above and planned projects. Open it zoomed to Uganda.
How many people in Uganda live without electricity?
About 34 million people live where satellites see no electric light at night, a proxy for living without power. Of them, 94% are within 15 km of a power line.
How long is Uganda's transmission network?
About 3,401 km of mapped lines at 66 kV and above, mostly from OpenStreetMap, with older public maps filling gaps.
How much power generation does Uganda have?
Operating plants of 10 MW and above add up to about 1,980 MW in our atlas, with about 20,617 MW more under construction or planned.
What is the grid emission factor for Uganda?
About 0.02 tCO2/MWh for electricity used in 2024, and 0.01 tCO2/MWh as a combined margin for carbon projects. See our grid emission factors for the method.
What is Uganda's Mission 300 energy compact target?
Uganda's Mission 300 energy compact commits to raising electricity access from 60% to 85% by 2030. See all compacts side by side on our compacts page.
Can I get the data for Uganda?
Yes, on request. The maps are free to view; email [email protected] and tell us what you need it for.