Grids and planning
The Eastern and Southern Africa grid atlas
All three of our grid atlases on one map: 18 countries from Ethiopia to the Cape and Madagascar, with the grid, power plants, the pipeline and three master plans.
194 GW of plants are in the pipeline, more than the 112 GW operating today.
Explore the atlas →
Grids and planning
The SAPP grid atlas
The Southern African Power Pool on one map: today's high-voltage grid, every power plant of 10 MW and above, the project pipeline and its delays, and SAPP's draft master plan to 2045.
Only 75% of the capacity planned for 2012 to 2021 was built.
Explore the atlas →
Grids and planning
The EAPP grid atlas
The Eastern Africa Power Pool core on one map: Ethiopia, Kenya, Uganda, Rwanda and Burundi, with Tanzania and DR Congo. The grid, plants of 10 MW and above, the pipeline with its delays and the 2014 master plan.
The Ethiopia-Kenya link is rated 2,000 MW; about 200 MW is traded.
Explore the atlas →
Grids and planning
The Madagascar grid atlas
Madagascar's three small grids on one map, with the 220 kV backbone meant to join them, plants of 5 MW and above, and the pipeline with every date that was promised.
JIRAMA sells at about 795 Ar per kWh against a cost of about 1,225 Ar.
Explore the atlas →
Grids and planning
When the river runs low
How much of each grid between the Zambezi and the Nile is hydro, what a dry year takes away in megawatts, and whether the interconnectors can carry the difference. 17 countries, two modeled cases and the 2024 drought as it happened.
Zambia lost 37% of its hydro output in 2024; its import lines had room for about 430 MW.
Read the analysis →
Grids and planning
What the interconnectors can really carry
A map of every published cross-border link in the Southern African and Eastern Africa power pools, colored by the share of its rating that is usable or in use. 25 SAPP links, 11 EAPP links, with each limit and its source.
SAPP's cross-border links can use about 68% of their 11,400 MW rating.
See the map →
Grids and planning
Look before you build
Our method for a first look at a mini-grid site or a power line route: protected areas, rivers, homes, forest and farmland checked from open data, flag by flag, with no score. Two worked examples, in Zambia and Malawi.
A straight 16.6 km line in our Malawi example passes within 10 m of 75 buildings; following the roads trades that for less clearing.
See the method →
Grids and planning
Can small hydro run a data center?
381 small hydro sites across Africa mapped against fiber, cooling, the grid, dry seasons and the people nearby, one factor at a time, to see where computing could be the customer for spare power.
72% of small plants run below 5% of capacity in the driest month of a dry year.
Read the analysis →
Grids and planning
Who supplies the power, what it costs, and when it goes off
The utilities, regulators, tariffs by customer class and load shedding since 2015 for the 17 SAPP and EAPP core countries, every number linked to the regulator or utility document.
A standard household block costs US$0.015 to 0.21 per kWh, from Angola to Rwanda.
Compare the countries →
Grids and planning
Near the grid, not on it
A screening atlas of 39 African countries. It shows how many people without electric light live close to an existing or planned power line, and where mini-grids could reach them first and join the grid later.
490 million of the 617 million people living without night-time light are within 15 km of a power line.
Explore the atlas →
Waste to Wealth
The second-life atlas
Where solar panels, battery storage and electric vehicle batteries across the 12 Southern African Power Pool countries will retire, when, and in what volume, and where they could be reused or recycled.
About 10 GWh of retired batteries could be reused as storage by 2040.
Explore the atlas →
Mission 300
Energy compacts, side by side
All 35 published Mission 300 national energy compacts next to each other: access targets, grid and off-grid plans, mini-grid rules, e-waste and progress, each quoted from the compact.
18 of 35 compacts clearly address mini-grids meeting the grid.
Compare the compacts →
Climate and carbon
Carbon per connection
What the 101 million new connections promised in the Mission 300 compacts are worth in CO2, country by country: what carbon methodologies would let a developer claim, and what household surveys actually support.
Default baselines overstate the carbon avoided by electrification about seven-fold; the net is negative where the grid is thermal.
Read the analysis →
GHG
Grid emission factors
Open, indicative grid emission factors for 38 African countries, from Southern and Eastern to West and Central Africa: average intensity with and without imports, and the operating, build and combined margins carbon projects use.
South Africa's grid emits about 0.82 tCO2 per MWh.
See the factors →
GHG
Renewable energy certificates
Where I-RECs can be issued across the 12 Southern African Power Pool countries, how many have been issued, and what a megawatt-hour of solar earns as a certificate compared with carbon credits.
5 of 12 countries have issued I-RECs.
See the map →
GHG
Article 6 carbon markets
Which Southern African countries have signed Paris Agreement carbon deals, with whom, which projects are authorized, and the rules and government shares in each.
3 of 12 countries have signed bilateral deals.
See the tracker →
GHG
Carbon, certificates and the bottom line
How much carbon credits, I-RECs and D-RECs really change the tariff, returns and bankability of grid solar, rooftop solar and mini-grids, with a report and an interactive model.
Up to 10% off a South African solar tariff at US$10 per tonne; almost nothing in Zambia.
Read and try the model →