Regional reports

West African Power Pool

WAPP regional report

The West African Power Pool (WAPP) side by side: power plants and lines, the generation mix, Mission 300 compacts, prices, carbon, access, drought risk, storage and waste for each country, with a pool total. About 449 million people live in the 14 countries in our data; our atlases map about 33,424 MW of operating plants and 50,977 MW more planned or under construction.

14countries in our data
205 Mpeople live without night-time light, a proxy for no power
83%of them live within 15 km of a power line
33,424MW of operating power plants, 10 MW and above
12countries with a Mission 300 compact in our data

Download the regional report (PDF, 0.4 MB, November 2026) Rapport régional en français (PDF, novembre 2026) Relatório regional em português (PDF, novembro de 2026) Open the WAPP grid atlas

Created by ECOWAS in 1999, it brings together fourteen countries. A regional market and a regional regulator (ERERA) are in place.

Grid and generation

Power plants, lines and the generation mix

Across the 14 WAPP countries in our data, our atlases map about 33,424 MW of operating power plants of 10 MW and above (gas 55%, hydro 22%, oil and diesel 15%), about 5,799 MW under construction and about 45,178 MW more planned. Hydro is the largest source in 2 of the 14 countries.

The mapped high-voltage network runs to about 47,793 km of lines.

Power plants and lines by country
CountryOperating (MW)Largest sourceUnder construction (MW)Planned (MW)Lines (km)Top voltageSubstations
Benin193Gas (66%)502771,541330 kV15
Burkina Faso572Oil and diesel (57%)05951,792220 kV13
Côte d'Ivoire2,787Gas (53%)2681,65811,568400 kV55
The Gambia173Oil and diesel (87%)0725148220 kV2
Ghana6,883Gas (62%)3007,3516,315330 kV60
Guinea1,342Hydro (65%)3003,0331,358220 kV16
Guinea-Bissau10Solar (100%)063219220 kV4
Liberia146Hydro (60%)20669580220 kV8
Mali1,066Oil and diesel (43%)3008022,382220 kV14
Niger389Oil and diesel (83%)01,3302,143132 kV15
Nigeria16,951Gas (68%)3,89826,01014,793330 kV125
Senegal2,059Oil and diesel (34%)5917873,342220 kV33
Sierra Leone400Gas (40%)47919719220 kV8
Togo452Gas (37%)25959892330 kV12
WAPP total33,424Gas (55%)5,79945,17847,793380
Generation mix by country
Benin
Burkina Faso
Côte d'Ivoire
The Gambia
Ghana
Guinea
Guinea-Bissau
Liberia
Mali
Niger
Nigeria
Senegal
Sierra Leone
Togo
WAPP total
CoalGasOil and dieselNuclearHydroSolarWindGeothermal, bioenergy and other
Electricity generation by source, 2024
CountryGeneration (TWh)CoalGasOil and dieselNuclearHydroSolarWindGeothermal, bioenergy and other
Benin1.0-72%24%--4%--
Burkina Faso1.7--83%-5%7%-5%
Côte d'Ivoire10.8-71%--28%--1%
The Gambia0.5--100%-----
Ghana24.3-61%2%-35%1%--
Guinea4.0--25%-74%1%--
Guinea-Bissau0.1--100%-----
Liberia0.6--46%-53%2%--
Mali6.0--81%-15%3%-1%
Niger0.918%5%74%--3%--
Nigeria37.6-75%--24%---
Senegal7.61%-79%-4%9%5%1%
Sierra Leone0.2--5%-86%10%--
Togo0.7-70%--11%18%--
WAPP total96.0-54%16%-27%2%--
Capacity and peak demand, latest published
CountryCapacity (MW)Peak demand (MW)As of
Benin152-Sep 2026 (GEM)
Burkina Faso415-Sep 2026 (GEM)
Côte d'Ivoire2,907-2023
The Gambia144-Sep 2026 (GEM)
Ghana5,641-2025
Guinea1,310-2025
Guinea-Bissau10-Sep 2026 (GEM)
Liberia126-Sep 2026 (GEM)
Mali867-Sep 2026 (GEM)
Niger267-Sep 2026 (GEM)
Nigeria13,0005,801Mar 2025
Senegal1,406-Sep 2026 (GEM)
Sierra Leone319-Sep 2026 (GEM)
Togo301-Sep 2026 (GEM)
Cross-border line projects we track: 6 completed, 4 under construction, 2 in preparation
CountriesVoltageStatusYear
Nigeria-Benin330 kVCompleted2007
Côte d'Ivoire-Mali225 kVCompleted2012
Ghana-Burkina Faso225 kVCompleted2018
Côte d'Ivoire-Liberia-Sierra Leone-Guinea225 kVCompleted2021
Guinea-Guinea-Bissau-The Gambia-Senegal225 kVCompleted2023
Mali-Senegal225 kVCompleted2024
Niger-Benin330 kVUnder construction2027 (expected)
Nigeria-Niger-Benin-Burkina Faso330 kVUnder construction2027 (expected)
Guinea-Mali225 kVUnder construction2028 (expected)
Mauritania-Mali225 kVUnder construction2030 (expected)
Ghana-Côte d'Ivoire330 kVIn preparation2029 (expected)
Ghana-Burkina Faso-Mali330 kVIn preparation2031 (expected)

Capacity is what the country or WAPP reports (available capacity in the SAPP monthly report, installed capacity elsewhere); it is not the same as our mapped plants. GEM marks the plant total from Global Energy Monitor where no national figure is published. The project table lists lines in our project tracker; older interconnectors are on the atlas and the interconnector limits page. Every plant and line: the WAPP grid atlas.

Mission 300 compacts compared

What the compacts say, side by side

12 of the 14 WAPP countries in our data have published a Mission 300 national energy compact. Together they seek about US$39.0 billion of private investment by 2030. 1 set out how to handle e-waste from solar kits and batteries, and 9 say what happens to mini-grids when the main grid arrives.

No compact in our data: Guinea-Bissau, Mali.

Set the split beside the access section below, which shows where the people without power live by distance to a mapped line: a compact that relies on the grid fits a country where most of them live within 2 km.

Access targets and how they are split
CountryAccess nowTargetGridMini-gridStandaloneWhat the split measures
Benin42.6% in 202470% by 203084%10%7%Share of new connections
Burkina Faso34.2% in 202490% by 203070%25%5%Share of people with access
Côte d'Ivoire64% in 2023100% by 203066%19%15%Share of new connections
The Gambia73.7% in 2024100% by 2030---Not stated
Ghana89% in 202499% by 203073%27%-Share of new connections
Guinea53% in 2024100% by 203071%10%19%Share of new connections
Liberia32.7% in None75% by 203060%15%25%Share of new connections
Niger20.8% in 202260% by 203072%4%24%Share of new connections
Nigeria61% in 2022100% by 2030---Not stated
Senegal84% in 2023100% by 202958%24%18%Share of new connections
Sierra Leone36% in 202578% by 203022%22%56%Share of new connections
Togo70% in 2024100% by 203082%1%17%Share of new connections
What each compact commits to
CountryProductive useE-wasteLeast-cost or GIS planMini-grid rules when the grid arrivesCost-reflective tariffPrivate investment sought (US$ billion)
BeninMentionedYesExistsYesMentionedNot stated
Burkina FasoYesNoExistsMentionedCommitted5.7
Côte d'IvoireMentionedNoExistsYesCommitted1.9
The GambiaMentionedNoExistsYesCommitted0.2
GhanaYesNoExistsYesCommitted2.0
GuineaMentionedNoExistsYesCommitted7.6
LiberiaNoNoExistsMentionedCommitted0.1
NigerYesNoExistsMentionedCommitted0.5
NigeriaMentionedNoExistsYesCommitted16
SenegalYesNoPlannedYesCommitted2.3
Sierra LeoneMentionedNoExistsYesCommitted1.4
TogoYesNoExistsYesCommitted1.7

Read from each compact document, with page numbers and quotes for every value: Mission 300 compacts compared. "Not stated" means the compact does not say.

Prices

What power costs across the pool

Household tariffs are the energy charge at the central bank exchange rate; check on the tariffs page what each includes. Our power price data holds 9 deals in WAPP countries, from auctions, signed power purchase agreements and published bids.

Household tariffs and load shedding
CountryUtilityHousehold (US$/kWh)Lifeline or first block (US$/kWh)Load shedding
BeninSBEE0.2130.146Cuts reported
Burkina FasoSONABEL0.1640.128Not confirmed this month
Côte d'IvoireCIE0.1260.054Not confirmed this month
The GambiaNAWEC0.192-Not confirmed this month
GhanaECG0.1750.077Not confirmed this month
GuineaEDG0.0440.012Cuts reported
Guinea-BissauEAGB0.2180.138None reported
LiberiaLiberia Electricity Corporation (LEC)0.2200.130Cuts reported
Mali---Cuts reported
NigerNIGELEC0.1160.101Not confirmed this month
NigeriaIkeja Electric0.0460.003Not confirmed this month
SenegalSenelec0.2330.140Cuts reported
Sierra Leone---Not confirmed this month
TogoCEET0.1580.102Not confirmed this month
Power deals signed or bid in the pool, US$/MWh as signed
SourceDealsMedianLowestHighest
Solar PV58337115
Gas29590100
Diesel and fuel oil1164--
Renewables (mixed)165--

Every tariff and status with its source: utilities, tariffs and load shedding. Every deal with its source: power prices and deals. Load shedding is grouped from the status we last read for each country.

Carbon

Grid carbon and carbon markets

4 of the 14 WAPP countries in our data issue I-REC renewable energy certificates, about 1.7 TWh to date. The grid factor is the average CO2 per MWh of electricity used; a low factor means grid power, electric transport and new grid connections add little CO2.

Grid carbon, certificates and carbon markets
CountryGrid factor (tCO2/MWh)YearI-REC certificatesIssued to date (GWh)Article 6 deals and activitiesNet CO2 avoided by new connections (t a year)
Benin0.4522024Not approved-1-113,771
Burkina Faso0.5122024Issuing4500-449,962
Côte d'Ivoire0.3592024Issuing940-291,814
The Gambia0.7622024Not approved-1-12,251
Ghana0.3282024Issuing3549-67,919
Guinea0.1892024Not approved-0-35,617
Guinea-Bissau0.7622024Not approved-0-17,661
Liberia0.3482024Not approved-0-29,076
Mali0.6142024Not approved-0-121,240
Niger0.5482024Not approved-0-530,042
Nigeria0.3792024Issuing1,1420-1,263,614
Senegal0.5992024Not approved-8-86,573
Sierra Leone0.0362024Approved, none issued-1517
Togo0.3712024Not approved-0-66,704

Methods: grid emission factors, clean energy certificates and carbon per connection (central case, new connections to 2030 under each compact or national target). A negative value means the new connections add CO2 on net, because the grid power they use emits more than the kerosene and diesel they replace.

Access

Who lives near the grid but not on it

About 205 million people in the WAPP countries in our data live where satellites see no electric light at night, out of about 449 million. 83% of them live within 15 km of a mapped power line, and 34% within 2 km, close enough for a grid connection to be the obvious first step.

Satellites also see 8,405 lit places 2 km or more from any mapped line: missing lines, mines and plants with their own power, or mini-grids.

People without power and how far they live from the grid
CountryPeople (million)Without night light (million)Within 2 km of a line2 to 15 kmBeyond 15 kmMedian distance (km)Lit places off the map
Benin145.435%60%4%3.287
Burkina Faso241326%59%15%5.4221
Côte d'Ivoire326.813%79%8%5.92,655
The Gambia2.80.916%39%45%12.577
Ghana342.930%69%1%2.92,322
Guinea159.432%48%20%4.7147
Guinea-Bissau2.21.57%12%81%60.39
Liberia5.63.030%45%25%5.641
Mali241714%42%44%12.0338
Niger271810%39%51%15.3227
Nigeria23311444%50%6%2.71,152
Senegal195.215%46%38%8.2800
Sierra Leone8.65.025%44%31%7.844
Togo8.42.543%57%0%2.5285
WAPP total44920534%50%17%8,405

Night-time light is a proxy for no power, not a household survey. Map and method: the grid-edge atlas.

Risk, storage and waste

Drought, battery sites, waste and second life

A dry year that takes a fifth of hydro output would cost the WAPP countries about 575 MW on average over the year, and a severe drought (two fifths) about 1,148 MW. 60 coal, gas and oil plant sites with about 18,318 MW of grid connection could host batteries as they close. Waste could fuel about 1,342 MW of power, and about 84,527 t of solar panels, kits and batteries will reach end of life from 2026 to 2040.

Drought risk, storage sites, waste and second life
CountryHydro in operating plantsDry year, MW lostSevere drought, MW lostThermal plant sites for batteries (MW)Power from waste (MW)Solar and battery waste 2026-2040 (t)Second-life panel demand (MWp)
Benin---127495,3941,267
Burkina Faso5%25145325,211795
Côte d'Ivoire36%701391,6691615,6491,812
The Gambia----4436238
Ghana24%1903793,9791237,1613,856
Guinea65%65130235942,199747
Guinea-Bissau----9864108
Liberia62%59-121,546455
Mali42%3060190735,3091,233
Niger---189201,3921,547
Nigeria17%20040010,61861835,50120,807
Senegal-7148391017,7171,995
Sierra Leone12%48162281,567575
Togo15%24165174,581735
WAPP total5751,14818,3181,34284,52736,171

Methods: hydro and drought, power plant to battery site, power from waste and the second-life atlas. Central cases throughout.

Country pages

Every country in this report

Each country page has the detail behind these tables and its own country report to download.

Benin Burkina Faso Côte d'Ivoire The Gambia Ghana Guinea Guinea-Bissau Liberia Mali Niger Nigeria Senegal Sierra Leone Togo

Other power pools: SAPP EAPP CAPP

Sources and method

  • Plants and lines: our grid atlases (Global Energy Monitor, WRI, OpenStreetMap, World Bank and national sources). Generation mix: Ember. Capacity and peak demand: SAPP monthly report and national regulators and utilities.
  • Compacts: the published Mission 300 national energy compacts and World Bank compact progress reports. Distances: our grid-edge atlas.
  • Tariffs and load shedding: utility tariff books, regulators and news reports (Utilities and Tariffs data). Deals: auction results, regulators, utilities and trade press (power prices data).
  • Grid factors: Ember and national data, in our grid emission factors. Certificates: the I-REC registry (Evident). Article 6: UNEP-CCC Article 6 pipeline.
  • Access: WorldPop population, NASA Black Marble night lights, Google Open Buildings and our mapped lines (grid-edge atlas).
  • Hydro: our grid atlases and Ember. Thermal sites: Global Energy Monitor (September 2026). Waste: FAOSTAT, Global Energy Monitor and OpenStreetMap. Second life: IRENA, compact targets and our second-life atlas.

Rows run in alphabetical order. These are side-by-side facts, not scores or rankings. A dash means we hold no data for that country. Pool totals count member countries only. Rebuilt every month with the country reports. Free to share under CC BY 4.0.