West African Power Pool
WAPP regional report
The West African Power Pool (WAPP) side by side: power plants and lines, the generation mix, Mission 300 compacts, prices, carbon, access, drought risk, storage and waste for each country, with a pool total. About 449 million people live in the 14 countries in our data; our atlases map about 33,424 MW of operating plants and 50,977 MW more planned or under construction.
Download the regional report (PDF, 0.4 MB, November 2026) Rapport régional en français (PDF, novembre 2026) Relatório regional em português (PDF, novembro de 2026) Open the WAPP grid atlas
Created by ECOWAS in 1999, it brings together fourteen countries. A regional market and a regional regulator (ERERA) are in place.
Power plants, lines and the generation mix
Across the 14 WAPP countries in our data, our atlases map about 33,424 MW of operating power plants of 10 MW and above (gas 55%, hydro 22%, oil and diesel 15%), about 5,799 MW under construction and about 45,178 MW more planned. Hydro is the largest source in 2 of the 14 countries.
The mapped high-voltage network runs to about 47,793 km of lines.
| Country | Operating (MW) | Largest source | Under construction (MW) | Planned (MW) | Lines (km) | Top voltage | Substations |
|---|---|---|---|---|---|---|---|
| Benin | 193 | Gas (66%) | 50 | 277 | 1,541 | 330 kV | 15 |
| Burkina Faso | 572 | Oil and diesel (57%) | 0 | 595 | 1,792 | 220 kV | 13 |
| Côte d'Ivoire | 2,787 | Gas (53%) | 268 | 1,658 | 11,568 | 400 kV | 55 |
| The Gambia | 173 | Oil and diesel (87%) | 0 | 725 | 148 | 220 kV | 2 |
| Ghana | 6,883 | Gas (62%) | 300 | 7,351 | 6,315 | 330 kV | 60 |
| Guinea | 1,342 | Hydro (65%) | 300 | 3,033 | 1,358 | 220 kV | 16 |
| Guinea-Bissau | 10 | Solar (100%) | 0 | 63 | 219 | 220 kV | 4 |
| Liberia | 146 | Hydro (60%) | 20 | 669 | 580 | 220 kV | 8 |
| Mali | 1,066 | Oil and diesel (43%) | 300 | 802 | 2,382 | 220 kV | 14 |
| Niger | 389 | Oil and diesel (83%) | 0 | 1,330 | 2,143 | 132 kV | 15 |
| Nigeria | 16,951 | Gas (68%) | 3,898 | 26,010 | 14,793 | 330 kV | 125 |
| Senegal | 2,059 | Oil and diesel (34%) | 591 | 787 | 3,342 | 220 kV | 33 |
| Sierra Leone | 400 | Gas (40%) | 47 | 919 | 719 | 220 kV | 8 |
| Togo | 452 | Gas (37%) | 25 | 959 | 892 | 330 kV | 12 |
| WAPP total | 33,424 | Gas (55%) | 5,799 | 45,178 | 47,793 | 380 |
| Country | Generation (TWh) | Coal | Gas | Oil and diesel | Nuclear | Hydro | Solar | Wind | Geothermal, bioenergy and other |
|---|---|---|---|---|---|---|---|---|---|
| Benin | 1.0 | - | 72% | 24% | - | - | 4% | - | - |
| Burkina Faso | 1.7 | - | - | 83% | - | 5% | 7% | - | 5% |
| Côte d'Ivoire | 10.8 | - | 71% | - | - | 28% | - | - | 1% |
| The Gambia | 0.5 | - | - | 100% | - | - | - | - | - |
| Ghana | 24.3 | - | 61% | 2% | - | 35% | 1% | - | - |
| Guinea | 4.0 | - | - | 25% | - | 74% | 1% | - | - |
| Guinea-Bissau | 0.1 | - | - | 100% | - | - | - | - | - |
| Liberia | 0.6 | - | - | 46% | - | 53% | 2% | - | - |
| Mali | 6.0 | - | - | 81% | - | 15% | 3% | - | 1% |
| Niger | 0.9 | 18% | 5% | 74% | - | - | 3% | - | - |
| Nigeria | 37.6 | - | 75% | - | - | 24% | - | - | - |
| Senegal | 7.6 | 1% | - | 79% | - | 4% | 9% | 5% | 1% |
| Sierra Leone | 0.2 | - | - | 5% | - | 86% | 10% | - | - |
| Togo | 0.7 | - | 70% | - | - | 11% | 18% | - | - |
| WAPP total | 96.0 | - | 54% | 16% | - | 27% | 2% | - | - |
| Country | Capacity (MW) | Peak demand (MW) | As of |
|---|---|---|---|
| Benin | 152 | - | Sep 2026 (GEM) |
| Burkina Faso | 415 | - | Sep 2026 (GEM) |
| Côte d'Ivoire | 2,907 | - | 2023 |
| The Gambia | 144 | - | Sep 2026 (GEM) |
| Ghana | 5,641 | - | 2025 |
| Guinea | 1,310 | - | 2025 |
| Guinea-Bissau | 10 | - | Sep 2026 (GEM) |
| Liberia | 126 | - | Sep 2026 (GEM) |
| Mali | 867 | - | Sep 2026 (GEM) |
| Niger | 267 | - | Sep 2026 (GEM) |
| Nigeria | 13,000 | 5,801 | Mar 2025 |
| Senegal | 1,406 | - | Sep 2026 (GEM) |
| Sierra Leone | 319 | - | Sep 2026 (GEM) |
| Togo | 301 | - | Sep 2026 (GEM) |
| Countries | Voltage | Status | Year |
|---|---|---|---|
| Nigeria-Benin | 330 kV | Completed | 2007 |
| Côte d'Ivoire-Mali | 225 kV | Completed | 2012 |
| Ghana-Burkina Faso | 225 kV | Completed | 2018 |
| Côte d'Ivoire-Liberia-Sierra Leone-Guinea | 225 kV | Completed | 2021 |
| Guinea-Guinea-Bissau-The Gambia-Senegal | 225 kV | Completed | 2023 |
| Mali-Senegal | 225 kV | Completed | 2024 |
| Niger-Benin | 330 kV | Under construction | 2027 (expected) |
| Nigeria-Niger-Benin-Burkina Faso | 330 kV | Under construction | 2027 (expected) |
| Guinea-Mali | 225 kV | Under construction | 2028 (expected) |
| Mauritania-Mali | 225 kV | Under construction | 2030 (expected) |
| Ghana-Côte d'Ivoire | 330 kV | In preparation | 2029 (expected) |
| Ghana-Burkina Faso-Mali | 330 kV | In preparation | 2031 (expected) |
Capacity is what the country or WAPP reports (available capacity in the SAPP monthly report, installed capacity elsewhere); it is not the same as our mapped plants. GEM marks the plant total from Global Energy Monitor where no national figure is published. The project table lists lines in our project tracker; older interconnectors are on the atlas and the interconnector limits page. Every plant and line: the WAPP grid atlas.
What the compacts say, side by side
12 of the 14 WAPP countries in our data have published a Mission 300 national energy compact. Together they seek about US$39.0 billion of private investment by 2030. 1 set out how to handle e-waste from solar kits and batteries, and 9 say what happens to mini-grids when the main grid arrives.
No compact in our data: Guinea-Bissau, Mali.
Set the split beside the access section below, which shows where the people without power live by distance to a mapped line: a compact that relies on the grid fits a country where most of them live within 2 km.
| Country | Access now | Target | Grid | Mini-grid | Standalone | What the split measures |
|---|---|---|---|---|---|---|
| Benin | 42.6% in 2024 | 70% by 2030 | 84% | 10% | 7% | Share of new connections |
| Burkina Faso | 34.2% in 2024 | 90% by 2030 | 70% | 25% | 5% | Share of people with access |
| Côte d'Ivoire | 64% in 2023 | 100% by 2030 | 66% | 19% | 15% | Share of new connections |
| The Gambia | 73.7% in 2024 | 100% by 2030 | - | - | - | Not stated |
| Ghana | 89% in 2024 | 99% by 2030 | 73% | 27% | - | Share of new connections |
| Guinea | 53% in 2024 | 100% by 2030 | 71% | 10% | 19% | Share of new connections |
| Liberia | 32.7% in None | 75% by 2030 | 60% | 15% | 25% | Share of new connections |
| Niger | 20.8% in 2022 | 60% by 2030 | 72% | 4% | 24% | Share of new connections |
| Nigeria | 61% in 2022 | 100% by 2030 | - | - | - | Not stated |
| Senegal | 84% in 2023 | 100% by 2029 | 58% | 24% | 18% | Share of new connections |
| Sierra Leone | 36% in 2025 | 78% by 2030 | 22% | 22% | 56% | Share of new connections |
| Togo | 70% in 2024 | 100% by 2030 | 82% | 1% | 17% | Share of new connections |
| Country | Productive use | E-waste | Least-cost or GIS plan | Mini-grid rules when the grid arrives | Cost-reflective tariff | Private investment sought (US$ billion) |
|---|---|---|---|---|---|---|
| Benin | Mentioned | Yes | Exists | Yes | Mentioned | Not stated |
| Burkina Faso | Yes | No | Exists | Mentioned | Committed | 5.7 |
| Côte d'Ivoire | Mentioned | No | Exists | Yes | Committed | 1.9 |
| The Gambia | Mentioned | No | Exists | Yes | Committed | 0.2 |
| Ghana | Yes | No | Exists | Yes | Committed | 2.0 |
| Guinea | Mentioned | No | Exists | Yes | Committed | 7.6 |
| Liberia | No | No | Exists | Mentioned | Committed | 0.1 |
| Niger | Yes | No | Exists | Mentioned | Committed | 0.5 |
| Nigeria | Mentioned | No | Exists | Yes | Committed | 16 |
| Senegal | Yes | No | Planned | Yes | Committed | 2.3 |
| Sierra Leone | Mentioned | No | Exists | Yes | Committed | 1.4 |
| Togo | Yes | No | Exists | Yes | Committed | 1.7 |
Read from each compact document, with page numbers and quotes for every value: Mission 300 compacts compared. "Not stated" means the compact does not say.
What power costs across the pool
Household tariffs are the energy charge at the central bank exchange rate; check on the tariffs page what each includes. Our power price data holds 9 deals in WAPP countries, from auctions, signed power purchase agreements and published bids.
| Country | Utility | Household (US$/kWh) | Lifeline or first block (US$/kWh) | Load shedding |
|---|---|---|---|---|
| Benin | SBEE | 0.213 | 0.146 | Cuts reported |
| Burkina Faso | SONABEL | 0.164 | 0.128 | Not confirmed this month |
| Côte d'Ivoire | CIE | 0.126 | 0.054 | Not confirmed this month |
| The Gambia | NAWEC | 0.192 | - | Not confirmed this month |
| Ghana | ECG | 0.175 | 0.077 | Not confirmed this month |
| Guinea | EDG | 0.044 | 0.012 | Cuts reported |
| Guinea-Bissau | EAGB | 0.218 | 0.138 | None reported |
| Liberia | Liberia Electricity Corporation (LEC) | 0.220 | 0.130 | Cuts reported |
| Mali | - | - | - | Cuts reported |
| Niger | NIGELEC | 0.116 | 0.101 | Not confirmed this month |
| Nigeria | Ikeja Electric | 0.046 | 0.003 | Not confirmed this month |
| Senegal | Senelec | 0.233 | 0.140 | Cuts reported |
| Sierra Leone | - | - | - | Not confirmed this month |
| Togo | CEET | 0.158 | 0.102 | Not confirmed this month |
| Source | Deals | Median | Lowest | Highest |
|---|---|---|---|---|
| Solar PV | 5 | 83 | 37 | 115 |
| Gas | 2 | 95 | 90 | 100 |
| Diesel and fuel oil | 1 | 164 | - | - |
| Renewables (mixed) | 1 | 65 | - | - |
Every tariff and status with its source: utilities, tariffs and load shedding. Every deal with its source: power prices and deals. Load shedding is grouped from the status we last read for each country.
Grid carbon and carbon markets
4 of the 14 WAPP countries in our data issue I-REC renewable energy certificates, about 1.7 TWh to date. The grid factor is the average CO2 per MWh of electricity used; a low factor means grid power, electric transport and new grid connections add little CO2.
| Country | Grid factor (tCO2/MWh) | Year | I-REC certificates | Issued to date (GWh) | Article 6 deals and activities | Net CO2 avoided by new connections (t a year) |
|---|---|---|---|---|---|---|
| Benin | 0.452 | 2024 | Not approved | - | 1 | -113,771 |
| Burkina Faso | 0.512 | 2024 | Issuing | 450 | 0 | -449,962 |
| Côte d'Ivoire | 0.359 | 2024 | Issuing | 94 | 0 | -291,814 |
| The Gambia | 0.762 | 2024 | Not approved | - | 1 | -12,251 |
| Ghana | 0.328 | 2024 | Issuing | 35 | 49 | -67,919 |
| Guinea | 0.189 | 2024 | Not approved | - | 0 | -35,617 |
| Guinea-Bissau | 0.762 | 2024 | Not approved | - | 0 | -17,661 |
| Liberia | 0.348 | 2024 | Not approved | - | 0 | -29,076 |
| Mali | 0.614 | 2024 | Not approved | - | 0 | -121,240 |
| Niger | 0.548 | 2024 | Not approved | - | 0 | -530,042 |
| Nigeria | 0.379 | 2024 | Issuing | 1,142 | 0 | -1,263,614 |
| Senegal | 0.599 | 2024 | Not approved | - | 8 | -86,573 |
| Sierra Leone | 0.036 | 2024 | Approved, none issued | - | 1 | 517 |
| Togo | 0.371 | 2024 | Not approved | - | 0 | -66,704 |
Methods: grid emission factors, clean energy certificates and carbon per connection (central case, new connections to 2030 under each compact or national target). A negative value means the new connections add CO2 on net, because the grid power they use emits more than the kerosene and diesel they replace.
Who lives near the grid but not on it
About 205 million people in the WAPP countries in our data live where satellites see no electric light at night, out of about 449 million. 83% of them live within 15 km of a mapped power line, and 34% within 2 km, close enough for a grid connection to be the obvious first step.
Satellites also see 8,405 lit places 2 km or more from any mapped line: missing lines, mines and plants with their own power, or mini-grids.
| Country | People (million) | Without night light (million) | Within 2 km of a line | 2 to 15 km | Beyond 15 km | Median distance (km) | Lit places off the map |
|---|---|---|---|---|---|---|---|
| Benin | 14 | 5.4 | 35% | 60% | 4% | 3.2 | 87 |
| Burkina Faso | 24 | 13 | 26% | 59% | 15% | 5.4 | 221 |
| Côte d'Ivoire | 32 | 6.8 | 13% | 79% | 8% | 5.9 | 2,655 |
| The Gambia | 2.8 | 0.9 | 16% | 39% | 45% | 12.5 | 77 |
| Ghana | 34 | 2.9 | 30% | 69% | 1% | 2.9 | 2,322 |
| Guinea | 15 | 9.4 | 32% | 48% | 20% | 4.7 | 147 |
| Guinea-Bissau | 2.2 | 1.5 | 7% | 12% | 81% | 60.3 | 9 |
| Liberia | 5.6 | 3.0 | 30% | 45% | 25% | 5.6 | 41 |
| Mali | 24 | 17 | 14% | 42% | 44% | 12.0 | 338 |
| Niger | 27 | 18 | 10% | 39% | 51% | 15.3 | 227 |
| Nigeria | 233 | 114 | 44% | 50% | 6% | 2.7 | 1,152 |
| Senegal | 19 | 5.2 | 15% | 46% | 38% | 8.2 | 800 |
| Sierra Leone | 8.6 | 5.0 | 25% | 44% | 31% | 7.8 | 44 |
| Togo | 8.4 | 2.5 | 43% | 57% | 0% | 2.5 | 285 |
| WAPP total | 449 | 205 | 34% | 50% | 17% | 8,405 |
Night-time light is a proxy for no power, not a household survey. Map and method: the grid-edge atlas.
Drought, battery sites, waste and second life
A dry year that takes a fifth of hydro output would cost the WAPP countries about 575 MW on average over the year, and a severe drought (two fifths) about 1,148 MW. 60 coal, gas and oil plant sites with about 18,318 MW of grid connection could host batteries as they close. Waste could fuel about 1,342 MW of power, and about 84,527 t of solar panels, kits and batteries will reach end of life from 2026 to 2040.
| Country | Hydro in operating plants | Dry year, MW lost | Severe drought, MW lost | Thermal plant sites for batteries (MW) | Power from waste (MW) | Solar and battery waste 2026-2040 (t) | Second-life panel demand (MWp) |
|---|---|---|---|---|---|---|---|
| Benin | - | - | - | 127 | 49 | 5,394 | 1,267 |
| Burkina Faso | 5% | 2 | 5 | 145 | 32 | 5,211 | 795 |
| Côte d'Ivoire | 36% | 70 | 139 | 1,669 | 161 | 5,649 | 1,812 |
| The Gambia | - | - | - | - | 4 | 436 | 238 |
| Ghana | 24% | 190 | 379 | 3,979 | 123 | 7,161 | 3,856 |
| Guinea | 65% | 65 | 130 | 235 | 94 | 2,199 | 747 |
| Guinea-Bissau | - | - | - | - | 9 | 864 | 108 |
| Liberia | 62% | 5 | 9 | - | 12 | 1,546 | 455 |
| Mali | 42% | 30 | 60 | 190 | 73 | 5,309 | 1,233 |
| Niger | - | - | - | 189 | 20 | 1,392 | 1,547 |
| Nigeria | 17% | 200 | 400 | 10,618 | 618 | 35,501 | 20,807 |
| Senegal | - | 7 | 14 | 839 | 101 | 7,717 | 1,995 |
| Sierra Leone | 12% | 4 | 8 | 162 | 28 | 1,567 | 575 |
| Togo | 15% | 2 | 4 | 165 | 17 | 4,581 | 735 |
| WAPP total | 575 | 1,148 | 18,318 | 1,342 | 84,527 | 36,171 |
Methods: hydro and drought, power plant to battery site, power from waste and the second-life atlas. Central cases throughout.
Every country in this report
Each country page has the detail behind these tables and its own country report to download.
Benin Burkina Faso Côte d'Ivoire The Gambia Ghana Guinea Guinea-Bissau Liberia Mali Niger Nigeria Senegal Sierra Leone Togo
Other power pools: SAPP EAPP CAPP
Sources and method
- Plants and lines: our grid atlases (Global Energy Monitor, WRI, OpenStreetMap, World Bank and national sources). Generation mix: Ember. Capacity and peak demand: SAPP monthly report and national regulators and utilities.
- Compacts: the published Mission 300 national energy compacts and World Bank compact progress reports. Distances: our grid-edge atlas.
- Tariffs and load shedding: utility tariff books, regulators and news reports (Utilities and Tariffs data). Deals: auction results, regulators, utilities and trade press (power prices data).
- Grid factors: Ember and national data, in our grid emission factors. Certificates: the I-REC registry (Evident). Article 6: UNEP-CCC Article 6 pipeline.
- Access: WorldPop population, NASA Black Marble night lights, Google Open Buildings and our mapped lines (grid-edge atlas).
- Hydro: our grid atlases and Ember. Thermal sites: Global Energy Monitor (September 2026). Waste: FAOSTAT, Global Energy Monitor and OpenStreetMap. Second life: IRENA, compact targets and our second-life atlas.
Rows run in alphabetical order. These are side-by-side facts, not scores or rankings. A dash means we hold no data for that country. Pool totals count member countries only. Rebuilt every month with the country reports. Free to share under CC BY 4.0.